Auckland Harbour Bridge
Template:Short description Template:Use New Zealand English Template:Use dmy dates Template:Main other{{#invoke:Infobox|infobox}}Template:Template other{{#invoke:Check for unknown parameters|check|unknown=Template:Main other|preview=Page using Template:Infobox bridge with unknown parameter "_VALUE_"|ignoreblank = 1| also_known_as | alt | aqueduct_name | architect | begin | below | bridge_name | builder | built | capacity | caption | carries | child | clearance | clearance_above | clearance_below | closed | collapsed | demolished | complete | contracted_designer | coord_format | coordinates | cost | crosses | dedicated | depth | design | designer | destroyed | diameter | downstream | electrification | embed | embedded | ends | engineering | extra | fabricator | fetchwikidata |first_length | first_diameter | followed | gauge | height | heritage | id | id_type | image | image_caption | image_size | image_upright | inaugurated | lanes | length | life | load | locale | location | mainspan | maint | maintained | mapframe | mapframe-caption | mapframe-custom | mapframe-id | mapframe-coord | mapframe-wikidata | mapframe-point | mapframe-shape | mapframe-frame-width | mapframe-frame-height | mapframe-shape-fill | mapframe-shape-fill-opacity | mapframe-stroke-color | mapframe-stroke-colour | mapframe-stroke-width | mapframe-marker | mapframe-marker-color | mapframe-marker-colour | mapframe-geomask | mapframe-geomask-stroke-color | mapframe-geomask-stroke-colour | mapframe-geomask-stroke-width | mapframe-geomask-fill | mapframe-geomask-fill-opacity | mapframe-zoom | mapframe-length_km | mapframe-length_mi | mapframe-area_km2 | mapframe-area_mi2 | mapframe-frame-coordinates | mapframe-frame-coord | mapframe-switcher | material | material1 | material2 | name | named_for | native_name | native_name_lang | notrack | num_track | number_spans | official_name | onlysourced | open | opened | opening | os_grid_reference | other_name | owner | passable | piers_in_water | pierswater | preceded | qid | rebuilt | references | refs | replaced_by | replaces | second_length | second_diameter | spans | starts | structure_gauge | third_length | third_diameter | toll | towpath | track_gauge | traffic | traversable | upstream | website | width | winner }}Template:Main other
The Auckland Harbour Bridge is an eight-lane motorway bridge over Waitematā Harbour in Auckland, New Zealand. It joins St Marys Bay on the Auckland city side with Northcote on the North Shore side. It is part of State Highway 1 and the Auckland Northern Motorway. The bridge is operated by the NZ Transport Agency Waka Kotahi (NZTA).<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> It is the second-longest road bridge in New Zealand, and the longest in the North Island.<ref>What is the longest bridge in New Zealand? Template:Webarchive (from the Transit New Zealand FAQ webpage. Retrieved 9 June 2008.)</ref>
The original inner four lanes, opened in 1959, are of box truss construction. Two lanes were added to each side in 1968–1969 and are of orthotropic box structure construction<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> extend as cantilevers from the original piers. The bridge is 1,020 m (3,348 ft) long, with a main span of 243.8 metres (800 feet) rising 43.27 metres (142 feet) above high water,<ref>1951–1961 The Auckland Harbour Bridge Authority Template:Webarchive (Auckland Harbour Board publication, 1960s)</ref> allowing ships access to the deepwater wharf at the Chelsea Sugar Refinery, one of the few such wharves west of the bridge.
While often considered an Auckland icon, many see the construction of the bridge without walking, cycling, or rail facilities as an oversight. In 2016, an add-on structure providing a walk-and-cycleway called SkyPath received Council funding approval and planning consent, but was not built.<ref name="COUNCILYES">Template:Cite news</ref><ref name="GREENLIGHT">Template:Cite news</ref> In 2021, a stand-alone walking and cycling bridge called the Northern Pathway was announced by the New Zealand Government, but also was not built.<ref name=":0" />
About 170,000 vehicles cross the bridge each day (as of 2019), including over 1,000 buses, which carry 38% of all people crossing during the morning peak.<ref>Template:Cite news</ref>
BackgroundEdit
Prior to the opening of the bridge in 1959, the quickest way from Auckland to the North Shore was by passenger or vehicular ferry. The fastest way via car was through the Coatesville-Riverhead Highway<ref name="HISTORY50">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
As early as 1860, engineer Fred Bell, commissioned by North Shore farmers who wanted to herd animals to market in Auckland, had proposed a harbour crossing in the general vicinity of the bridge. It would have used floating pontoons, but the plan failed due to the £16,000 cost estimate ($1.9 million, adjusted for inflation as of March 2017).<ref name="HISTORY50"/> Additional structures for a bridge crossing the harbour were proposed in 1927 and 1929.<ref name="EvolvingAuckland7.1">Template:Cite book</ref> Two Royal Commissions in 1930 and 1946 were held on the viability of a bridge crossing the Waitemata.<ref>Template:Cite book</ref>
In the 1950s, when the bridge was being built, North Shore was a mostly rural area of barely 50,000 people, with few jobs and a growth rate half that of Auckland south of the Waitematā Harbour. Opening up the area via a new route unlocked the potential for further expansion of Auckland.<ref name="HISTORY50"/>
ConstructionEdit
Initial structureEdit
The recommendations of the design team and the report of the 1946 Royal Commission were for five or six traffic lanes, with one or two of them to be reversed in direction depending on the flow of traffic, and with a footpath for pedestrians on each side. The latter features were dropped for cost reasons before construction started, the First National Government of New Zealand opting for an 'austerity' design of four lanes without footpaths, and including an approach road network only after local outcry over traffic effects.<ref name="BRIDGE50">Template:Cite news</ref> The decision to reduce the bridge in this way has been called "a ringing testament to [...] the peril of short-term thinking and penny-pinching".<ref name="BRIDGE50"/> On 1 December 1950, an act of parliament formed the Auckland Harbour Bridge Authority, chaired by Sir John Allum, then Mayor of Auckland City, who appointed British firm Freeman Fox & Partners to design the bridge.<ref name="EvolvingAuckland7.1"/>
The bridge took four years to build, with Dorman Long (who had constructed the Sydney Harbour Bridge) and the Cleveland Bridge & Engineering Company contracted to construct the bridge in October 1954.<ref name="EvolvingAuckland7.1"/> The first stage of construction involved land reclamation at the Westhaven Marina, which was completed by September 1955.<ref name="EvolvingAuckland7.1"/> The steel girder structure pieces were fabricated in England and shipped to New Zealand.<ref name="EvolvingAuckland7.1"/> The steel bridge structure began erection in December 1956.<ref name="EvolvingAuckland7.1"/> Hundreds of labourers were employed on the construction including 180 men sent out from the UK. Progress was slowed with the workers going on strike in 1956 and 1957.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The large steel girder sections were partially pre-assembled, then floated into place on construction barges. One of the main spans was almost lost during stormy weather when the barge began to drift, but the tugboat William C Daldy won a 36-hour tug-of-war against the high winds.<ref>References provided within the William C Daldy article.</ref>
The bridge was constructed from opposing sides of the harbour. The southern section was cantilevered, until both sides were joined in March 1959.<ref name="EvolvingAuckland7.1"/> Completed in April 1959, three weeks ahead of schedule,<ref>People who built the Bridge (from the Archives New Zealand, New Zealand Government website. Retrieved 5 June 2008.)</ref> the bridge was officially opened on 30 May 1959 by the Governor-General Lord Cobham.<ref>Auckland – Our Bridge (historical video via YouTube. Retrieved 27 July 2008.)</ref><ref>Record of 20 Years Activities 1951–1971 – Auckland Harbour Bridge Authority</ref> An open day had been held, when 106,000 people had walked across.<ref name="OPEN">Opening day and ceremonies New Zealand Government. Retrieved 5 June 2008.</ref> The opening period was extremely busy, despite the poor weather in Auckland experienced in June 1959.<ref name="EvolvingAuckland7.1"/> Either three or four men had been killed by accidents during construction, and the names of three of them are recorded on a memorial plaque underneath the bridge at the Northcote end.<ref name="HAPPY">"Happy 50th birthday harbour bridge", North Shore Times via Stuff.co.nz, 21 May 2009</ref><ref>Bridge worker fatalities Archives New Zealand, New Zealand Government. Retrieved 5 June 2008.</ref>
The hollow girder design by Freeman, Fox and Partners design was unprecedented in New Zealand, and fell outside the 1950s building codes in New Zealand.<ref name="EvolvingAuckland7.1"/> Initial plans for the bridge were for an extremely slender structure, only 2.9 metres thick, due to the competing specifications from two stakeholders: the National Roads Board specified the gradient and locations where the bridge could launch from the shore on either side of the harbour, while the Auckland Harbour Board required an opening of 43.5 metres above the high tide point. Public Works commissioner Bob Norman, concerned about the narrow bridge design, attempted to negotiate with both the Roads Board and Harbour Board for additional width allowance for the bridge. The Harbour Board required the 43.5 metre clearance so that the entire fleet of ships operating within New Zealand could navigate the harbour, the largest of which was the P&O cruise liner SS Canberra. Norman argued that the Canberra was extremely unlikely to use the only major dock west of the bridge at the Chelsea Sugar Refinery, so the Harbour Board agreed to a smaller opening. This allowed Freeman Fox and Partners to redesign the bridge, increasing the width of the deep centre span from 2.9 metres to 4.12 metres.<ref name="EvolvingAuckland7.1"/> By the 1970s, many box girder bridges began to develop structural problems, such as the Freeman Fox and Partners-designed West Gate Bridge in Melbourne which collapsed during construction in 1970. The Auckland Harbour Bridge was inspected by the design firm, which found that the stiffening member had buckled by Template:Cvt, so it was decided to strengthen the bridge's girder system.<ref name="EvolvingAuckland7.1"/>
Paid for by government-backed loans,<ref name="HAPPY"/> the bridge started out as a toll bridge, the first one in New Zealand,<ref name="BRIDGE50"/> with toll booths at the northern end for north-bound and south-bound traffic. Tolls were originally 2/6 (2 shillings and six pence: approximately $5.50<ref name="rbnz.govt.nz">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> in 2018) per car but were reduced to 2/- (2 shillings: approximately $4.47<ref name="rbnz.govt.nz"/> in 2018) after 15 months of operation. The toll remained at 2 shillings until New Zealand changed to decimal currency in July 1967, when that amount became 20 cents in the conversion. It was increased in 1980 from 20 to 25 cents (approximately $1.21<ref name="rbnz.govt.nz"/> in 2018).<ref>Template:Cite news</ref> Tolling was later made north-bound only before being discontinued on 31 March 1984, and the booths were removed.<ref name="BTG15">Template:Webarchive.</ref> The toll system was removed as the cost of collection began to outweigh the profits.<ref name="EvolvingAuckland7.1"/> When this happened, the Auckland Harbour Bridge Authority enquired if the National Roads Board would take over operations if the toll booths were removed, which they agreed to. When the bridge became toll free, most of the Auckland Harbour Bridge Authority staff were absorbed into the roads board.<ref name="EvolvingAuckland7.1"/>
Some critics have alleged that the routing of State Highway 1 over the bridge was motivated by the need to create toll revenue, and led to a decades-long delay on finishing the Western Ring Route around Auckland, significantly contributing to the need for a massive motorway through the city centre of Auckland and severely damaging inner-city suburbs such as Freemans Bay and Grafton.<ref name="NZ_Herald_10575671">Template:Cite news</ref>
Clip-ons (Nippon clip-ons)Edit
The bridge was originally built with four lanes for traffic. Owing to the rapid expansion of suburbs on the North Shore and increasing traffic levels, it was soon necessary to increase capacity; by 1965, the annual use was about 10 million vehicles, three times the original forecast.<ref name="BRIDGE50"/> In 1967, a contract was given to Japanese firm Ishikawajima-Harima Heavy Industries Co., Ltd. (now IHI Corporation) to construct two steel box girder bridges affixed to the Harbour Bridge, to greatly increase the number of lanes on the bridge.<ref name="EvolvingAuckland7.1"/> The girder sections were prefabricated in Japan and transported to New Zealand on a converted oil tanker.<ref name="EvolvingAuckland7.1"/> The eastern section was completed in January 1969, while the western side was completed shortly before the additional lanes were formally opened on 23 September 1969.<ref name="EvolvingAuckland7.1"/> Each side added two additional lanes to the bridge, doubling the number of lanes to eight.<ref>Template:Cite journal</ref>
As the sections were manufactured by a Japanese company, this led to the nickname 'Nippon clip-ons'. The selection of the company was considered a bold move at the time, barely 20 years after WWII and with some considerable anti-Japanese sentiment still existing.<ref name="BTG14">Template:Webarchive.</ref> The costs of the additions were much higher than if the extra lanes had been provided initially.<ref name="BRIDGE50"/>
The clip-ons have been plagued by significant issues. In 1987, cracks required major repair works,<ref name="BTG16"/> and in 2006, further cracks and signs of material fatigue were found. The clip-ons were originally to have a life expectancy of 50 years.Template:Citation needed Auckland City Council's Transport Committee requested Transit New Zealand to investigate the future of the clip-ons as part of its ten-year plan. Transit noted that the plan already includes some funding for bridge maintenance.<ref name="TVNZ">"Harbour Bridge future questioned". Television New Zealand, 12 March 2006</ref>
In May 2007, Transit proposed a by-law change banning vehicles over 4.5 tonnes from the outside lane on each clip-on to reduce stress on the structure.<ref name="TVNZ2">"Trucks to be banned from clip-ons", Television New Zealand, 4 May 2007</ref> This was changed in July 2007 to a bylaw banning vehicles of 13 tonnes or more, based on the high level of voluntary compliance during the previous months.<ref name="NZ_Herald_10451948">Template:Cite news</ref>
In 2007, it was announced that NZ$45 million in maintenance work on the clip-ons was brought forward as part of good practice. In October 2007, a 2006 report from Beca Group surfaced in the press, noting that the clip-ons were at risk of catastrophic, immediate failure in circumstances such as a traffic jam trapping a large number of trucks. Transit noted that this situation was extremely unlikely, and measures already implemented would prevent it from occurring.<ref>"'Catastrophic failure' warning on Harbour Bridge", The New Zealand Herald, 14 October 2007</ref> In January 2008, it became known that even after the multimillion-dollar maintenance works, a full ban for trucks on all clip-on lanes might be required, or the working life could be reduced to only ten more years.<ref name="NZ_Herald_10550379">Template:Cite news</ref>
In late 2009, it was announced that due to greater than expected complexity of the task and increasing material costs for the 920 tons of reinforcing material instead of the approximately half amount of that originally envisaged, clip-on maintenance costs had increased by a further NZ$41 million.<ref name="KEY">(Press Release) "Key decisions on Auckland Harbour Bridge and third harbour crossing"Template:Dead link. NZ Transport Agency Waka Kotahi, 2 December 2009. Retrieved 2 December 2009.</ref><ref name="RAISES"/> NZTA noted that the clip-ons would not be able to be strengthened again after the current works were finished. However, after completion of the upgrade, the bridge would have a further life of between 20 and 40 years if truck restrictions were reintroduced in 10–20 years on the northbound clip-on.<ref name="RAISES">"Minister raises hopes for new harbour link", The New Zealand Herald, 3 December 2009</ref><ref>"Bridge upgrade to proceed, despite blow-out", The New Zealand Herald, 2 December 2009</ref>
TrafficEdit
Tidal flowEdit
A "tidal flow" (dynamic lanes) system is in place, with the direction of the two centre lanes changed to provide an additional lane for peak-period traffic. During the morning peak, five of the eight lanes are for southbound traffic; in the afternoon, five lanes are northbound. At other times, the lanes are split evenly, but peak traffic has become proportionately less – in 1991 there was often a higher than 3:1 difference in directional traffic; in 2006, this had dropped to around 1.6:1. The bridge has an estimated capacity of 180,000 vehicles per day, and in 2006 had an average volume of 168,754 vehicles per day (up from 122,000 in 1991).<ref name="SHADOW">Template:Cite news</ref>
In March 1982, the Ministry of Transport and Auckland Harbour Bridge Authority conducted a week-long traffic blitz in an attempt to improve the standard of driving. Of the 600,000 vehicles which used the bridge over this period, 6,000 were stopped, with half of those receiving a ticket and the rest cautioned. A second blitz was held for 36 hours a few weeks later.<ref>Template:Cite book</ref><ref>Template:Cite book</ref>
For many years, lane directions were indicated by overhead signals. In the late 1980s, a number of fatal head-on accidents occurred when vehicles crossed lane markings into the path of oncoming traffic.
Moveable barriersEdit
In 1990, a movable concrete safety barrier was put in place to separate traffic heading in opposite directions and eliminate head-on accident. Two specially designed barrier transfer machines moved the barrier by one lane four times a day,<ref name="BTG16">Template:Webarchive North Shore City Libraries. Retrieved 8 June 2008.</ref> at a speed of 6 km/h, the first concrete safety barrier of its kind installed on a box girder bridge in the world.<ref name="EvolvingAuckland7.1" />
In March 2009, the barrier transfer machines, which had lasted four times their original design life of five years, and the barrier were replaced. The new machines are capable of moving the barrier in half the time the old machines did. The concrete barrier blocks and the metal expansion blocks have been reduced in width by 200 mm, giving more width in the lanes either side of the barrier.<ref name="BTG16"/>Template:Citation needed
As part of the Victoria Park Tunnel project, the moveable barrier has been extended southwards to the Fanshawe Street onramp.<ref>"Gateway to Auckland", The Aucklander, 12 November 2009, Page 5</ref><ref name="UPDATE13JULY">Template:Cite news</ref>
Event managementEdit
As part of large events such as the Auckland Marathon, normal motorway restrictions on access are sometimes relaxed. December 2011 was the first time that cyclists were officially allowed on the bridge, for a race / community cycling event organised by Telstra Clear, Auckland Transport, NZTA and Cycle Action Auckland, also allowing cyclists on the Northern Busway. Up to 9,000 riders were protected by 160 stationary buses used as a 'guard of honour' between the bridge end and the Northern Busway from traffic on the rest of the motorway.<ref>Template:Cite news</ref><ref>Template:Cite news</ref><ref name=MASSBRIDGECROSS>Template:Cite news</ref>
Proposed walk- and cyclewayEdit
Original proposalEdit
When the bridge was built, rail lines and walking paths were dropped for cost reasons,<ref name="EvolvingAuckland7.1"/> and neither were they included during the clip-on construction (people can walk on the span only via guided tours). After the early 1990s increase in public transportation patronage in Auckland, the Ministry of Works and Development investigated if the 'clip-ons' could be used for a light rail system, which they found was feasible if the lanes were used exclusively for this purpose.<ref name="EvolvingAuckland7.1"/> In 2007 discussions about the addition of a cycle and footpath link were mooted. Transit noted that this would cost between NZ$20 million and $40 million.<ref name="NZ_Herald_10482289">Template:Cite news</ref>
A 2008 proposal to modify the clip-ons and potentially widen them to add walking and cycling paths met with different reactions. While Auckland Regional Council and North Shore City Council voted to support it (under certain conditions), Auckland City Council considered the costs to be too high. The NZTA considered the proposal as not having enough merit for the $22–53 million cost, though campaigners noted that the costs cited for the project included 45% contingencies.<ref name="WEEK">Template:Cite news</ref> A proposal from the Auckland Regional Council (one of the proponents) to open up part of the clip-on structure for a walking / cycling trial use over several summer weekends, to show whether it would attract enough users, did not go forward.<ref name="WEEK" />
The GetAcross group was showcasing its proposed plan, called SkyPath, on its website.<ref name="NZ_Herald_10496427">Template:Cite news</ref> Following years of campaigning, Skypath, was promised funding by the Labour Party in the lead-up to the 2017 general election.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Once Labour was in government, the project was passed to NZTA which released a revised design in 2019.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
In June 2021, Transport Minister Michael Wood announced a new stand-alone walking and cycling bridge would be built on the eastern side of the Auckland Harbour Bridge. The bridge was estimated to cost a total of $785 million and had the support of Auckland mayor Phil Goff.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
The plan received criticism from cycling, trucking and other transport advocates, as well as from the government opposition parties.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite news</ref> In October 2021, Wood announced the project had been scrapped due to lack of public support. He said NZTA had spent $51 million on designs, consultants and engineering plans for the project up until the end of September, and the final amount spent was not known.<ref name=":0">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
On 6 August 2023, NZTA announced their Waitematā Harbour Crossings plan which includes a tunnel for light rail and a tunnel for motor traffic under the harbour, and walking and cycling on two lanes of the existing Harbour Bridge.<ref name="Newshub">Template:Cite news</ref> It was forecasted that 6400 people would walk and cycle across the Auckland Harbour Bridge every day.<ref name="ReferenceA">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> This proposal was abandoned under the new government, stating that the government would not fund any projects to allow cycling across the Harbour Bridge.<ref>Template:Cite news</ref>
ProtestsEdit
On Sunday, 24 May 2009, thousands of people crossed the bridge as a part of a protest by GetAcross against the bridge not providing walking and cycling access, and against what the group perceives to be the authorities' negative and obstructionist attitude towards such access.<ref name="POWER">"People power breaks barricades". The New Zealand Herald, 24 May 2009</ref> A crossing either as part of the protest or as part of the official 50-year anniversary celebrations had been forbidden by NZTA. Despite this, several people made their way around the police cordon onto the bridge. At that stage police closed the northbound lanes to traffic, bringing State Highway 1 to a stop.<ref name="POWER"/>
The protest created a wide spectrum of responses in the media and in public perception, from being labelled a dangerous stunt representative of an increasingly lawless, anarchic society<ref name="ZAP">"Garth George: An anarchic society that needs a good zap", The New Zealand Herald, 28 May 2009</ref> to being considered a successful signal to authorities to give more weight to the demands and the public backing of the walk and cycleway proponents.<ref name="CHARGES">"Harbour Bridge marchers may face fines, charges". The New Zealand Herald, 26 May 2009</ref> NZTA representatives noted that they were disappointed at what they considered the broken word of the organisers of the protest, and remarked that it would take 30 more years before walking and cycling could likely be provided (see also "Second Harbour Crossing" below).<ref name="POWER"/>
Alternate proposalEdit
In late 2009 the GetAcross campaign proposed an alternative option, with a single shared walking and cycling path slung under the eastern clip-on. As confirmed by NZTA,<ref name="RAISES"/> this clip-on has significantly more remaining load capacity and as the proposal would not require widening, the costs have been preliminarily assessed as of the order of NZ$12 million.<ref name="TOLL"/>
The group proposed to raise the majority of the funding via a loan backed by small tolls. NZTA noted that it would be considering the proposal, should funding be able to be secured by the campaigners.<ref name="TOLL">Template:Cite news</ref>
In 2011, the proposal got new public support when Auckland Mayor Len Brown agreed that a walk- and cycleway was a desirable goal, and instructed Auckland Transport to add it to its strategic priorities. The walk- and cycleway is also to be included in the city centre masterplan. Three council-controlled organisations (CCOs) – Auckland Transport, the Waterfront Development Agency and the Tourism, Events and Economic Development Agency – indicated support for the proposal, as has the Heart of the City (Auckland CBD) business association.<ref name=TICK>Template:Cite news</ref>
In 2014, the proposed walk and cycleway was publicly notified, and consent was given in 2015. However, this was appealed by three local groups. The decision of the original hearing was upheld in December 2016, and the last appeal rejected by the Environment Court. In the meantime, Council had already provided in principle approval for a public-private partnership funding model, in a unanimous support vote earlier in 2016.<ref name="COUNCILYES"/><ref name="GREENLIGHT"/>
A 2019 announcement said that work on the walking and cycling "clipon" could start in 2020.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
On 30 May 2021, more than 1,500 cyclists crossed the bridge following a rally at Point Erin Park organised by Bike Auckland.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The rally was motivated by uncertainty around the future of the SkyPath project.<ref name="nzherald.co.nz">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> NZTA had stopped supporting the project due to technical issues.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The Western clip on of the bridge (two motor traffic lanes) had been closed in advance of the rally, with a police cordon blocking access.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> After Bike Auckland's rally concluded, much of the crowd made their way over to the police cordon and pushed past onto the bridge.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
UtilitiesEdit
The bridge supports several utility services, including water and gas pipelines and fibre-optic telecommunications cables.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Transpower reached agreement with Transit in 2005 for the installation of cable supports beneath the bridge for a future cross-harbour power cable.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}Template:Dead link</ref> In 2012, Transpower installed three 220,000-volt cables on the bridge, linking Hobson Street substation in the Auckland CBD to the Wairau Road substation on the North Shore.
TourismEdit
Bungy jumping and Bridge ClimbEdit
AJ Hackett operates a Template:Convert bungy jump experience and a guided bridge climb over the arch truss.<ref>Auckland Bride Climb and Bungy</ref> In popular culture, Bryan Bruce's television documentary The Bridge (2002) featured footage of the first bungy jump from the Auckland Harbour Bridge.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Vector lightsEdit
Vector Limited, a utility company in New Zealand, uses LED lights with various colours to illuminate the bridge for ornamental reasons. The lights are powered by renewable energy and the installation was completed in November 2017.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Second Harbour CrossingEdit
{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}
Almost as soon as the bridge was built it reached capacity, before extension via the clip-ons, and a second crossing of the harbour was mooted. The high costs and the difficulties of connecting it to the motorway network have so far caused plans to remain at concept stage. In 2008, a study group narrowed down around 160 options to a multi-tunnel link approximately one km east of the bridge, with up to four individual tunnels for motorway, public transport and rail.
On 6 August 2023, NZTA announced their Waitematā Harbour Crossings plan <ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> which includes a tunnel for light rail and a tunnel for motor traffic, with walking and cycling on two lanes of the existing Harbour Bridge. Construction is expected to start by 2029.<ref name="Newshub"/> Waka Kotahi's forecast is that 6,400 people would walk and cycle across the bridge every day.<ref name="ReferenceA"/>
Issues and notable incidentsEdit
ResonanceEdit
Template:See also The natural sway motion of people walking on the bridge's clip-on segment during special events such as the Auckland Marathon can lead the bridge to oscillate sideways.<ref>Beca Infrastructure Limited. (2011). AHB Box Girder Vibration Damper investigation. In NZTA. Beca Infrastructure Ltd. Retrieved 1 September 2024, from https://www.nzta.govt.nz/assets/About-us/docs/oia-2023/oia-12821-attachment-1.pdf</ref> It has been reported that the oscillations can inflict "serious crushing injuries".<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The bridge's movement is caused by synchronous lateral excitation, a positive feedback phenomenon. It has been a known issue since at least 1975, and the lateral frequency is reported to be at 0.67 Hz.<ref>Template:Cite journal</ref>
Seismic vulnerability and improvementsEdit
In 1996, NZTA began a seismic screening programme to identify existing bridges that may sustain damage in an earthquake. Following the assessment, the bridge has completed seismic retrofit.<ref>Template:Cite news</ref>
SuicidesEdit
The bridge is associated with suicide attempts. In 2010, a news article reported that one to two individuals die by suicide at the location per year.<ref>Template:Cite news</ref> In 2019, a feasibility study of retrofitting suicide prevention barrier was published. It examined two types of barriers, a vertical anti-climb barrier and horizontal fall prevention barrier.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> As of 2024, no barriers have been implemented.
2020 structural damageEdit
On Friday, 18 September 2020, at approximately 11:00 AM, high winds, with gusts up to Template:Convert, caused a heavy goods vehicle travelling in the central span of the bridge to strike a main diagonal member of the box truss member. The incident reportedly caused severe damage and a significant reduction in daily traffic capacity.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Temporary repairs were effected using a locally fabricated replacement member, pending a full engineering analysis and design of the long-term solution. On 4 October, a permanent replacement strut was installed, with all lanes opening again on 7 October 2020.<ref>Template:Cite news</ref> Since the September 2020 incident up until 2024, the bridge has been closed 20 times totalling 435 minutes and costing over $35.6 million in economic damage.<ref name=":1">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Ship strike risksEdit
The Baltimore Key Bridge collapse in March 2024 prompted NZTA to review Auckland Harbour Bridge safety measures. The review classified the risk of vessel collision with the bridge as "rare," citing multiple existing safety measures. The review also stated that Chelsea sugar ship is the only cargo ship that regularly passes under the bridge.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
See alsoEdit
GeneralEdit
SpecificEdit
- Central Motorway Junction, the major motorway junction connecting southeast of the bridge
- Newmarket Viaduct, similarly important traffic bottleneck on other side of Auckland CBD
- Western Reclamation, large industrial area east of the bridge, possible southern end of second crossing
- Upper Harbour Bridge, a motorway bridge in west Auckland
ReferencesEdit
External linksEdit
- NZTA Auckland Harbour Bridge – home page
- Engineering Heritage – Auckland Harbour Bridge (from the IPENZ website)
- Template:Structurae
- Historical photos (from the Transit New Zealand website)
- Get Across (website advocating a Harbour Bridge walking and cycling facility)
- Photographs of Auckland Harbour Bridge held in Auckland Libraries' heritage collections.
- Cost of Harbour Bridge closures to economy