Template:Short description Template:Multiple issues {{#invoke:Infobox|infobox}}Template:Template otherTemplate:Main other{{#invoke:Check for clobbered parameters|check|nested=1|template=Infobox company|cat=Template:Main other|name; company_name|logo; company_logo|logo_alt; alt|trade_name; trading_name|former_names; former_name|type; company_type|predecessors; predecessor|successors; successor|foundation; founded|founders; founder|defunct; dissolved|hq_location; location|hq_location_city; location_city|hq_location_country; location_country|num_locations; locations|areas_served; area_served|net_income; profit|net_income_year; profit_year|owners; owner |homepage; website }}{{#invoke:Check for unknown parameters|check|unknown=Template:Main other|preview=Page using Template:Infobox company with unknown parameter "_VALUE_" | ignoreblank=y | alt | area_served | areas_served | assets | assets_year | aum | brands | company_logo | company_name | company_type | defunct | dissolved | divisions | embed | equity | equity_year | fate | footnotes | former_name | former_names | foundation | founded | founder | founders | genre | homepage | hq_location | hq_location_city | hq_location_country | incorporated | image | image_alt | image_caption | image_size | image_upright | income_year | industry | ISIN | key_people | location | location_city | location_country | locations | logo | logo_alt | logo_caption | logo_class | logo_size | logo_upright | members | members_year | module | name | native_name | native_name_lang | net_income | net_income_year | num_employees | num_employees_year | num_locations | num_locations_year | operating_income | owner | owners | parent | predecessor | predecessors | production | production_year | products | profit | profit_year | rating | ratio | revenue | revenue_year | romanized_name | services | subsid | successor | successors | traded_as | trade_name | trading_name | type | website| qid | fetchwikidata | suppressfields | noicon | nocat | demo | categories }}

File:Biw aerial.jpg
Bath Iron Works from NAS Brunswick photo gallery

Bath Iron Works (BIW) is a major United States shipyard located on the Kennebec River in Bath, Maine, founded in 1884 as Bath Iron Works, Limited. Since 1995, Bath Iron Works has been a subsidiary of General Dynamics, one of the world's largest defense companies. BIW has built private, commercial, and military vessels, most of which have been ordered by the United States Navy.

HistoryEdit

Bath Iron Works was incorporated in 1884 by General Thomas W. Hyde, a native of Bath who served in the American Civil War. After the war, he bought a shop that made windlasses and other iron hardware for the wooden ships built in Bath's many shipyards. He expanded the business by improving its practices, entering new markets, and acquiring other local businesses. By 1882, Hyde Windlass was eyeing the new and growing business of iron shipbuilding, and it incorporated as Bath Iron Works in 1884.

On February 28, 1890, BIW won its first contract for complete vessels: two iron gunboats for the Navy. One of these Template:Convert ships was the Template:USS, the first ship launched by the company. In 1892, the yard won its first commercial contract for the 2,500-ton steel passenger steamer Template:Ship. In the 1890s, the company built several yachts for wealthy sailors.

In 1899, Hyde was suffering from Bright's Disease and resigned from management of the shipyard, leaving his sons Edward and John in charge. The shipyard began construction of Template:USS that same year, the only battleship ever built in Bath. It dominated the yard for five years until its launching in 1904, and was at times the only ship under construction. The yard faced numerous challenges because of the weight of armor and weapons. In sea trials, Georgia averaged Template:Convert for four hours, making her the fastest ship in her class and the fastest battleship in the United States Navy at the time.<ref name="End Games – PORTLAND MAGAZINE">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The company continued to rely on Navy contracts, which provided 86-percent of the value of new contracts between 1905 and 1917. The yard also produced fishing trawlers, freighters, and yachts throughout the first half of the century. These included Vanda, Hi-Esmaro, Aras I and Aras II, Caroline, and Corsair IV, which later served as a cruise ship before sinking off Acapulco, Mexico in 1949.<ref name="End Games – PORTLAND MAGAZINE"/>

The shipyard was at peak production during World War II (1943–1944), launching a destroyer every 17 days. Bath Iron Works ranked 50th among United States corporations in the value of World War II military production contracts.<ref>Template:Citation</ref> In 1981, Falcon Transport ordered two tankers, the last commercial vessels built by BIW.

File:Ffg58minedamage2.jpg
Mine-damaged Template:USS in May 1988

Template:USS was commissioned at Bath in 1986. It survived a mine explosion which tore a hole in its engine room and flooded two compartments. Over the next two years, BIW repaired the ship in unique fashion. The guided missile frigate was towed to the company's dry dock in Portland, Maine, and put up on blocks, where the damaged engine room was cut out of the ship. Meanwhile, workers in Bath built a 315-ton replacement, and the module was floated south to Portland, placed on the dry dock, slid into place under the frigate, jacked up, and welded into place.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

In 1995, Bath Iron Works was bought by General Dynamics. In 2001, the company wrapped up a four-year effort to build the Land Level Transfer Facility, an enormous concrete platform for final assembly of its ships, instead of building them on a sloping way so that they could slide into the Kennebec at launch. Hulls are now moved by rail from the platform horizontally onto a moveable dry dock, which greatly reduced the work involved in building and launching the ships.<ref>GDBIW.com Template:Webarchive</ref> The Template:Convert, 28,000-ton dry dock was built by Jiangdu Yuchai Shipbuilding Company for $27 million and shipped from China.<ref name="UPI">Template:Cite newsTemplate:Dead linkTemplate:Cbignore</ref>

In 2015, Bath Iron Works signed contracts with US Navy to build new Arleigh Burke-class destroyers, as well as to conduct maintenance sustainment support of Independence-class littoral combat ships built by competitor Austal USA.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The shipyard delivered Template:USS and Template:USS and is working on Template:USS and Template:USS. The DDG block buy for Bath also includes Template:USS, Template:USS, and Template:USS. On March 27, Bath received a $610.4 million contract modification to build John Basilone. This ship was funded in the 2015 defense appropriations act.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

In 2016, Dirk Lesko became president of Bath Iron Works.<ref name=":0" />

In 2020, 4,300 workers, all members of the International Association of Machinists and Aerospace Workers, voted to go on strike after the company and the union failed to agree to new labor contracts. The shipbuilders agreed to a 3-year pact and returned to work after 63 days of strike.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Lesko resigned unexpectedly on April 7, 2022, the same day the union local announced that it had come to an agreement with the shipyard.<ref name=":0">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> On May 5, 2022, Charles F. Krugh was appointed president.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Offsite facilitiesEdit

Bath Iron Works operates several offsite facilities in the surrounding mid-coast Maine region, their purposes range from administration to structural fabrication.

West BathEdit

West Bath Warehouse • The facility closest to the main yard, located on 76 New Meadows Road, West Bath. Its primary responsibilities are storage and distribution of materials to other BIW facilities, primarily the main yard.

BrunswickEdit

The neighboring city of Brunswick, Maine, Contains the most Bath Iron Works offsite facilities of any single municipality.

Structural Fabrication • Built in 1940 under the name "Harding's Plant", the Structural Fabrication facility is among the largest outside of the main yard.

Outfit Fabrication • Previously known as "East Brunswick Manufacturing Facility (EBMF)", the Outfit Fabrication facility is responsible for the production of non-structural parts and assemblies more efficient to build on the shop floor, and later ship into the main yard.

Tech Center • The Tech Center is where many Planners, Designers, and Engineers work.

Notable ships builtEdit

|CitationClass=web }}</ref>

File:USSChesterCL1.jpg
Template:USS was the first United States cruiser of the numbering series used through the first half of the 20th century.
File:HMS Campbeltown and Castleton.jpg
Two of the seven Bath Iron Works destroyers transferred to the Royal Navy in the Destroyers for Bases Agreement. The outboard ship made the St. Nazaire Raid.
File:USS Pruitt (DD-347).jpg
The last of the "four-stack" destroyers, Template:USS being launched from Bath Iron Works in 1920.
File:USS Nicholas (DD-449) running trials in May 1942 (NH 49969).jpg
Nicholas holds the United States Navy record for battle stars with 16 from World War II, 5 from the Korean War and 9 from the Vietnam War
File:USS John S. McCain (DL-3) underway in the early 1960s.jpg
The second Cold War destroyer built by Bath Iron Works was named for the grandfather of Republican senator and 2008 presidential candidate John S. McCain III.

ReferencesEdit

Template:Reflist

Further readingEdit

External linksEdit

Template:Sister project

Template:Coord

Template:General Dynamics Template:Kennebec River Template:Authority control Template:PTF boat