Template:Short description Template:Use dmy dates Template:Infobox rail company

File:Central trains logo 1997.gif
Central Trains' earliest logo, drawing on that of predecessor Regional Railways

Central Trains<ref>Companies House extract company no 3007938 Central Trains Limited</ref> was a train operating company in the United Kingdom owned by National Express that operated a variety of local and inter-regional trains from 2 March 1997 until 11 November 2007.

OverviewEdit

Created out of the Central division of Regional Railways during the Privatisation of British Rail, Central Trains passed into the private sector on 2 March 1997.<ref name="Knight">Template:Cite journal</ref> The franchise was awarded to National Express, who maintained control of the company until its eventual demise in 2007. Central Trains employed over 2,400 staff.<ref name="Key Facts and Figures">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The company invested significantly in rolling stock, with significant orders for new trains placed and the fleet later further grown through the acquisition of trains made surplus by other companies. Despite a reduction in the area covered during the ten years of its existence, the company grew its core fleet from fewer than 300<ref name="Knight" /> passenger vehicles to a total of 379<ref name="Key Facts and Figures" /><ref name="Junction2007">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> – a capacity increase of over 28%. It also refurbished a number of its stations, introducing ticket gates, help points and live information boards.

Central Trains also clamped down on vandalism on its trains and fare evasion, including through a controversial poster campaign publicising the names and addresses of passengers who had been fined for not having valid tickets.<ref>Template:Cite news</ref>

The franchise gained a reputation for poor timekeeping: its best performing period between 2000 and 2007 still saw one in six trains five minutes late or more,<ref>Template:Cite news</ref> with punctuality dropping as low as 61% in 2003.<ref>Template:Cite news</ref> The company also suffered from ongoing staff relations problems which led to extensive and long-lasting cancellations of Sunday services.<ref>Template:Cite news</ref><ref>Template:Cite news</ref><ref>Template:Cite news</ref>

Following a government policy announced in 2004, Central Trains was eventually disbanded in November 2007 with its services dispersed amongst London Midland, East Midlands Trains and CrossCountry.

NetworkEdit

At its greatest extent, Central Trains operated 253 stations and provided services covering 1,534 miles of the UK's railway network, covering most of central England and Mid Wales.<ref name="Johnston">Template:Cite journal</ref> In its last years, the company saw 43 million passenger journeys and a total of 930 million miles travelled every year.

Services ranged from rural and local services to flagship express services originally branded as Alphaline and later developed into Central Citylink. In the West Midlands, the company also operated the extensive urban rail services under contract to the West Midlands Passenger Transport Executive.

Long distance servicesEdit

Key longer distance and express routes included:

  • Birmingham New Street – Liverpool Lime Street
  • Birmingham New Street – Stansted Airport
  • Cardiff Central – Birmingham New Street – Nottingham
  • Liverpool Lime Street – Nottingham – Norwich

From 2003 onwards, the Central Citylink brand name was used by Central Trains to differentiate its long-distance and regional express routes from local services. The brand was used in timetables and publicity to highlight the enhanced service provided on such routes.

File:Citylinkmap2.svg
A map of the Citylink routes

While there was no separate dedicated fleet, Citylink services were usually operated by Central Trains' more modern Class 170 and Class 158 diesel multiple units, featuring air-conditioning and reservable seating. At-seat catering was also provided on many services.<ref>National Express Group Template:Webarchive</ref><ref>Template:Cite news</ref>

Central Trains' Guide 1 timetable was designated for all Citylink services, and highlight the special features of the brand.<ref>Central Trains' timetables Template:Webarchive</ref>

Regional servicesEdit

  • Birmingham New Street – Nottingham via Leicester (terminated at Leicester from 2004)
  • Birmingham New Street – Nottingham via Derby
  • Birmingham New Street – Shrewsbury
  • Birmingham New Street – Mid Wales and Chester (transferred away in 2001)
  • Northampton – Crewe
  • Coventry – Lincoln Central via Nuneaton (ceased in 2004)
  • Nuneaton – Coventry (from 2005)
  • Nottingham – Skegness
  • Doncaster / Lincoln Central – Peterborough via Spalding
  • Newark North Gate – Lincoln – Cleethorpes
  • Leicester – Lincoln Central (from 2004)
  • Derby – Crewe / Nottingham / Matlock
  • Nottingham – Mansfield Woodhouse / Worksop
File:Oxford 2003 central special.png
Central Trains' 158855 at Oxford in 2003, on hire to Thames Trains for Bristol-Oxford and Oxford-Bicester Town services.

Network West Midlands servicesEdit

  • Coventry – Birmingham New Street – Wolverhampton (split at New Street in 2004)
  • Cross City Line: Redditch/Longbridge – Four Oaks/Lichfield Trent Valley
  • Snow Hill Lines: Great Malvern/Worcester/Kidderminster – Dorridge/Shirley/Stratford-upon-Avon
  • Chase Line: Birmingham – Walsall / Stafford (cut back to Rugeley in 2005)
  • Walsall – Wellington via Wolverhampton
  • Worcester – Birmingham New Street

Service ChangesEdit

1990s New long distance servicesEdit

In the late 1990s, Central Trains began publicising additional long-distance through journeys, by amalgamating previously self-contained services in its timetables. For example, where a train had previously been timetabled to work a Shrewsbury to Birmingham service followed by a Birmingham to Leicester service, the workings were combined and shown as a single direct Shrewsbury – Birmingham – Leicester service in the public timetable. This resulted in some particularly lengthy services such as those from Aberystwyth in Mid Wales to Grimsby on the opposite coast of the UK.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="NRT">Template:Cite journal</ref>

Additionally, direct services from Birmingham to Stansted Airport were introduced during May 1998.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

2001 Mid Wales service transferEdit

Services west of Shrewsbury to Aberystwyth, Pwllheli and Chester were transferred away as part of the formation of a new combined Wales & Borders franchise in late 2001. Eleven Class 158 units were transferred to the new operator at this time.

2004Template:Ndash2005 Service changesEdit

Central Trains had a major shakeup between 2004Template:Ndash2005 to prepare them for the eventual break up of the franchise. In 2004, services from Leamington Spa to Birmingham Snow Hill & Stratford upon Avon were transferred into Chiltern Railways, but the company maintained a peak hour service to and from Leamington Spa. The service between Birmingham and Stourbridge was increased to every 10 minutes and this in turn increased the Kidderminster service, as a part of the new Stourbridge line timetable all remaining Birmingham New Street trains were diverted into Birmingham Snow Hill. Liverpool Lime Street to Stansted Airport split at New Street to form two services due to problems with delays. Previously Central Trains ran services from Birmingham New Street to Nottingham via Leicester as well as Derby, this service was split, the Leicester to Nottingham service was merged with the hourly Ivanhoe Line service to Loughbourgh and was extended past Nottingham all stations to Lincoln.

During 2004, Trent Valley local services that ran generally between Stafford and Nuneaton (some extended to / from Coventry or Rugby) were discontinued due to a Driver shortage and not restored until over year later, when they were replaced by an electric service from Northampton to Crewe. Another fatality of the 'lack of Drivers' was the service between Birmingham to Stafford via Walsall, services were cut back (as today) to run between Birmingham and Rugeley Trent Valley.

Central discontinued their single Northampton service a day which ran to Nottingham (and other locations) via Birmingham once they gained the Birmingham to Northampton route from sister company Silverlink Trains in 2004Template:Ndash2005. Two trains per hour from Birmingham New Street – London Euston via Northampton was replaced by one train per hour to Northampton which connected badly with onward services to London Euston (although a few trains a day did run straight through to / from London as an unofficial joint service). The Northampton service started off as an hourly express service until it was merged with the local service to Coventry adding more journey time.

Coventry to Nottingham via Leicester services were discontinued after engineering work at Nuneaton station made it impossible for trains from Coventry to join the line towards Leicester and no attempt was ever made to rectify this. This service was restored in 2005 as an hourly shuttle to Nuneaton, with passengers requiring changing at Nuneaton for Leicester (and change again at Leicester for Nottingham).

The local service to and from Coventry to Wolverhampton calling all stations was also changed in 2004. It was split at Birmingham New Street as Central Trains starting operating Class 321 EMUs. A later development was implemented that had trains running express from New Street to Birmingham International (with some stops at Marston Green) then all stations to Coventry and services to Walsall were extended to Birmingham International calling all stations, Adderley Park station was cut down to one train per hour shortly after this.

Central Trains operated train crew depots at:

  • Birmingham New Street, Birmingham Snow Hill, Boston, Cambridge, Coventry, Crewe, Leicester, Lincoln, Machynlleth (until 2001), Norwich, Nottingham, Pwllheli (until 2001), Shrewsbury, Stourbridge Junction, Leamington Spa, Wolverhampton and Worcester Shrub Hill

Central Trains maintained and stored trains at:

  • Birmingham New Street, Birmingham Tyseley, Boston, Cambridge, Coventry, Crewe, Leicester, Lincoln, Machynlleth (until 2001), Norwich, Nottingham, Pwllheli (until 2001), Shrewsbury, Smethwick Soho TMD, Leamington Spa, Wolverhampton and Worcester Shrub Hill

PerformanceEdit

Considering the difficulties with which Central Trains contended, including sharing tracks with so many other operators, it did not perform too badly in its twilight months. The last figures released by the ORR (Office of Rail Regulation) rated Central Trains' performance at 84.8% for the PPM (Public Performance Measure) over the third quarter of the financial year 2007/8.<ref name="rail-reg.gov.uk">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> This was an improvement over the same period the previous year, during which they achieved 82.7%. Their final MAA was 86.6%.<ref name="rail-reg.gov.uk" />

Rolling stockEdit

File:156 unit in Coventry 2000.JPG
Central Trains' 156402 in Regional Railways livery at Template:Stnlnk in 2000. The direct service from Coventry to Template:Stnlnk ceased in 2004.

Central Trains' fleet was primarily made up of diesel multiple unit trains, with an additional fleet of electric trains in use around Birmingham.

The awarding of the franchise was soon followed by multiple orders for a total of 33 new air-conditioned, 100 mph Turbostar trains, intended to boost the fleet and replace older rolling stock. Though a large number of 1980s and 1990s diesel multiple unit trains inherited from British Rail remained, the last 1960s and 70s 'slam door' trains had been retired by 2000.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Over the course of the franchise, a number of the older Template:Brc and Template:Brc trains were transferred away to other operators including Wales & Borders and One. This was balanced by the acquisition of additional Turbostar trains no longer required by sister company Midland Mainline as well as additional Class 150 and Class 158 units made surplus by other operators. Over the years, both Class 150 and 158 trains were shuffled between two and three carriage formations to meet changing needs.

The Strategic Rail Authority decision to divert rolling stock originally intended for South West Trains<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> also saw the company benefit from a fleet of 30 new 100 mph Class 350 Desiro units, which were shared with Silverlink for use on the West Coast Main Line between Euston and Northampton/Liverpool via Tamworth.

Rolling stock in 1997 consisted entirely of trains inherited from British Rail. Some, such as Class 310 and Class 312 trains were in the process of withdrawal at privatisation.<ref name="Knight" /> By the final months of the franchise, Central Trains had a significantly more modern fleet.<ref name="Junction2007" /> It was also supplementing its fleet with Template:Brc and new Template:Brc electric trains shared with sister company Silverlink.

Fleet at start of franchiseEdit

Rolling stock in 1997 consisted entirely of trains inherited from British Rail. Some, such as Class 310 and Class 312 trains were in the process of withdrawal at privatisation.<ref name="Knight" />

Class Image Type Top speed Number Routes operated Built
mph km/h
150 Sprinter File:150121 at Kidderminster.JPG DMU 75 120 29× 2 car

9× 3 car

Some Centro services.

Dorridge/Shirley/Stratford Upon Avon/Leamington Spa – Worcester/Great Malvern/Hereford. Some non Centro routes Crewe to Skegness, Derby to Matlock and Nottingham to Worksop

1984–1987
153 Super Sprinter File:153385 at Nottingham.JPG 21 Lincolnshire and Mid Wales rural services, Stourbridge branch line, Skegness to Crewe & Derby to Matlock and Nottingham to Birmingham New Street/Shrewsbury via Derby 1987–1988
156 Super Sprinter File:156408 at Cambridge.jpg 20 Aberystwyth and Chester to Birmingham New Street, Hereford to Birmingham New Street, Birmingham New Street to Leicester, Nottingham, Lincoln Central & Grimsby Town, Nottingham to Worksop, Crewe to Skegness. 1987–1989
158 Express Sprinter File:158751 at Westbury.JPG 90 145 36 Norwich to Liverpool, Stansted to Birmingham, Nottingham to Cardiff, Grimsby to Birmingham, Birmingham to Liverpool 1989–1992
310 File:310-blue-Harrow&Wealdstone2.jpg EMU 75 121 10 Already being withdrawn at privatisation, remained as backup for the newly introduced Class 323. 1966
312 File:312-seen-out-train-window.jpg 90 145 4 1976
323 File:Aston railway station - 2007-09-25.jpg 26 Cross City Line 1992–1995

Fleet at end of franchiseEdit

By the final months of the franchise, Central Trains had a significantly more modern fleet.<ref name="Junction2007" /> It was also supplementing its fleet with Class 321 and new Class 350 electric trains shared with sister company Silverlink.

Class Image Type Top speed Number Usual routes operated Built
mph km/h
150 Sprinter File:150014 Birmingham MS 2007.jpg DMU 75 120 18× 2 car

18× 3 car

Non-electric services for Network West Midlands, plus some services to Worcester, Malvern and Hereford. 1984–1987
153 Super Sprinter File:HPIM0808.JPG 16 Lincolnshire rural services, Coventry–Nuneaton and Stourbridge branch line. 1987–1988
156 Super Sprinter File:156403 at Birmingham New Street 01.jpg 10 Middle-distance services, mainly in the East Midlands. 1987–1989
158 Express Sprinter File:158788 at Cambridge.jpg 90 145 13× 2 car

8× 3 car

Middle-distance services and some Citylink duties. 1989–1992
170 Turbostar File:Cambridge-170507-02.jpg 100 160 31× 2 car

22× 3 car

Citylink services and general use across the franchise area. 1999–2002
321 File:321411 B Watford Junction.JPG EMU 37 (Shared with Silverlink) Birmingham – Northampton 1990–1991
323 File:Aston railway station - 2007-09-25.jpg 90 145 26 Cross City Line 1992–1995
350/1 Desiro File:350121 at Birmingham New Street 01.jpg 100 160 30 (Shared with Silverlink) Electrified Citylink services from Birmingham 2004–2005
File:CT SL Class 350-1 w-pantograph.png

Franchise cessationEdit

In October 2004, the Department for Transport unveiled plans designed to streamline rail franchises which included the abolition of the Central Trains franchise and the transfer of its services to other operators.<ref name="dft-oct04">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> It was announced that the franchise would end in April 2007, although there was a later extension until November 2007<ref>Template:Cite news</ref>).

On 11 November 2007, Central Trains ceased to exist and its services transferred to three new train operating companies:

ReferencesEdit

Template:Reflist

Further readingEdit

External linksEdit

Template:Sister project

Template:S-start Template:S-bef Template:S-ttl Template:S-aft Template:S-break Template:S-aft Template:S-break Template:S-aft Template:S-end Template:UK TOCs Template:NEXG