Template:Short description Template:Use dmy dates Template:Use British English Template:Infobox rail The Eastern Counties Railway (ECR) was an English railway company incorporated in 1836 intended to link London with Ipswich via Colchester, and then extend to Norwich and Yarmouth.

Construction began in 1837 on the first Template:Convert at the London end.<ref>Template:Cite book</ref> Construction was beset by engineering and other problems, leading to severe financial difficulties. As a result, the project was truncated at Colchester in 1843 but through a series of acquisitions (including the Eastern Union Railway who completed the link between Colchester and Norwich) and opening of other lines, the ECR became the largest of the East Anglian railways.

In 1862 ECR was merged with a number of other companies to form the Great Eastern Railway.

OpeningEdit

In 1835, a surveyor called Henry Sayer presented a plan for a new railway from London to York via Cambridge to London solicitors Dimes & Boyman. Together with John Clinton Robertson who was to become the first secretary of the ECR and engineers John Braithwaite it was concluded that this scheme was too optimistic and a scheme from London to Norwich via Colchester and Ipswich would be more viable.<ref name="Allen 1955 1">Template:Harvnb</ref>

Template:Infobox UK legislation Template:Infobox UK legislation A tour of the key towns on the route followed where considerable opposition from landowners, from sections of the press and members of the public was encountered. Despite this the prospectus of the Grand Eastern Counties Railway was first prepared in 1834 by John Braithwaite. The bill was introduced into the House of Commons on 19 February 1836, and after a stormy passage (two rival schemes had also surfaced in the interim as well as continuing opposition from land owners), it was authorised by an act of Parliament, the Template:Visible anchor (6 & 7 Will. 4. c. cvi) on 4 July 1836.<ref name="Allen 1955 2">Template:Harvnb</ref>

Construction of the line began in late March 1837 and progress east of Stratford was relatively easy as the land was largely arable. Indeed, a good number of windmills had to be demolished in order to get the railway built. West of Stratford the line had to cross the unstable Bow Marshes and after that, the built-up nature of the area meant that the railway had to be built on expensive viaducts.<ref name="Allen 1955 4">Template:Harvnb</ref>

The two-track railway opened on 20 June 1839 from a temporary terminus at Template:Rws in Mile End, Middlesex, as far as Template:Rws in Essex. On opening day, two trains topped and tailed by locomotives proceeded along the line watched by crowds of people. Guests of the company enjoyed a sumptuous banquet at Romford enlivened by the sound of cannon and the band of the Coldstream Guards. The strain of building the initial line and continuing disputes with landowners continued to take its toll on the company's finances. ECR backers in Norfolk and Suffolk were demanding work start in their area and the company was forced to go to Parliament to increase its capital, although this move was rejected. Later in 1839 shareholders decided a call for £3 per share should be made (in effect an additional payment by them) although this was reduced to £2 per share in January 1840 which released enough money for the ECR to continue construction.<ref name="Allen 1955 4"/><ref name=McCarthy>Template:Cite book</ref>

On 1 July 1840, the ECR opened an extension at the London end to its permanent terminus at Shoreditch (renamed Bishopsgate in 1846) and at the country end to Template:Rws. The line between Stratford and Shoreditch was, from 15 September 1840, used by trains of the Northern and Eastern Railway (N&ER) whose line to Broxbourne opened, although at first the Template:Abbr trains were not permitted to call at Stratford.<ref name="Allen 1955 6">Template:Harvnb</ref>

File:ECR(1851) p13 - Our Starting Train.jpg
Eastern Counties Railway train, probably at Bishopsgate Template:Circa 1851

By 1840, it was clear that additional money would be required to complete the ECR line to Colchester. This stretch included 64 bridges or viaducts in addition to numerous culverts, embankments and cuttings. A successful application for more capital was made to Parliament and work continued. The winter of 1841 proved very wet and delayed work even further.<ref name="Allen 1955 6"/>

Finally on 25 February 1843, a special inspection train left Shoreditch for Colchester. However, the train was stopped at Brentwood as a timber viaduct at Mountnessing had subsided and it was unsafe to continue. On 7 March 1843, goods trains started operation followed by the commencement of passenger services on 29 March.<ref name="Allen 1955 7">Template:Harvnb</ref>

The costs were as follows:

Item Cost
Construction £1,631,330
Rolling stock £97,000
Land, compensation, solicitors and surveyors fees. £370,550

The line ran to Template:Rws, a distance of Template:Convert to Shoreditch station; the route is now part of the Great Eastern Main Line.<ref>Template:Cite book</ref>

DevelopmentEdit

In 1843, the Template:Abbr directors were approached with a proposal to build a line from Stratford to the River Thames with the intention of sending out agricultural produce by rail with coal forming the bulk of the traffic the other way. A bill came before Parliament sponsored by the Eastern Counties, Stratford and Thames Junction Railway Company and it was the Template:Abbr that built the line through to Template:Rws opening on 14 June 1847.<ref name="Allen 1955 8">Template:Harvnb</ref>

As mentioned, the Template:Abbr had built a line from Stratford – Broxbourne and shared the Template:Abbr Shoreditch terminus. This railway had extended to Template:Rws in 1842 and Template:Rws in 1843 and was in the process of extending its line towards Template:Rws. Following on from negotiations in 1843, the Template:Abbr took over operation of the Template:Abbr from 1 January 1844 paying rent and dividing the profits until this railway was finally acquired by the Great Eastern Railway in 1902.<ref name="Allen 1955 9">Template:Harvnb</ref>

Template:Infobox UK legislation Following the acquisition of the Template:Abbr the Template:Abbr concentrated on building the line towards Newport (Essex) and on 4 July 1844, Parliament passed the Template:Visible anchor (7 & 8 Vict. c. lxii) authorising the Template:Abbr to extend to Cambridge and Brandon in Norfolk where an end on connection with the Norfolk Railway would offer a through route to Template:Rws. This route opened on 29 July 1845.<ref name="Allen 1955 10">Template:Harvnb</ref>

In 1845, the Template:Abbr was surveying towards Ardleigh with the intention of extending to Harwich although this scheme failed to get parliamentary backing.

Template:Infobox UK legislation Late in 1845, George Hudson was invited by the Template:Abbr shareholders to become chairman and an upswing in the lines finances resulted. Hudson then proposed various schemes designed to take the Template:Abbr towards York and Lincoln joining up with his North Midland Railway at South Milford. One scheme that came to fruition was the line from Peterborough via March to Ely which opened on 14 January 1847. Increasing passenger numbers at Bishopsgate (renamed from Shoreditch in 1846) saw that station extended in the same year.<ref name="Allen 1955 11">Template:Harvnb</ref>

The refusal of the Template:Abbr to extend northwards towards Ipswich led to the formation of the Eastern Union Railway, who opened their line between Colchester and Ipswich in 1846.

Template:Infobox UK legislation Template:Infobox UK legislation Template:Infobox UK legislation Template:Infobox UK legislation Other Template:Abbr openings in 1847 included to Wisbech East on 3 May and on 17 August, Cambridge to St Ives where a junction with the East Anglian Railway's (EAR) St Ives to Huntingdon line was created. In fact the Template:Abbr operated the Template:Rws to Template:Rws line on behalf of the Template:Abbr, but it proved so unprofitable that they threatened to withdraw from the arrangement in October 1849. In the end operation by the Template:Abbr restarted with them paying the Template:Abbr 25 shillings per day to do so.<ref name="Allen 1955 12">Template:Harvnb</ref>

The financial depression of 1847–48 saw the Template:Abbr rein back some of its ambitions although the loop line from St Ives to Template:Rws was opened on 1 February 1848 and the Template:Abbr took over the working of the Norfolk Railway on 2 May which extended the Template:Abbr empire to Fakenham, Lowestoft and Great Yarmouth. Construction also started on a branch to Template:Rws in March 1847 and the first goods trains ran in August 1848 followed by the opening to passenger trains on 2 October of the same year.<ref name="Allen 1955 13">Template:Harvnb</ref>

By 1849, things were going poorly for Template:Abbr chairman George Hudson, and following his non-attendance at the AGM the shareholders, who had received a very small dividend, set up a committee to look into his financial management of the company.<ref name="Allen 1955 14">Template:Harvnb</ref>

A short branch to Enfield was opened on 1 March 1849. This linked to Template:Rws station (then called Edmonton). Later the same month the Template:Rws to Fakenham line, the building of which had been started by the Norfolk Railway, was opened by the Template:Abbr on 20 March 1849.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The Template:Abbr did not enjoy good relations with the London and Blackwall Railway (L&BR). They had built the London and Blackwall Extension Railway from Stepney East which was supposed to have a junction with the Template:Abbr at Bow Junction. This was not connected and an ill-served interchange station called Victoria Park & Bow lasted until 1850. Both the Template:Abbr and the Template:Abbr had been promoting railways to Tilbury and it was in September 1851 that the Template:Abbr directors asked George Parker Bidder to approach the Template:Abbr with regard to a joint bill.<ref>Template:Cite book</ref>

There were no additions to the Template:Abbr network in 1850, and in 1851 a short branch from what is now Shepreth Branch Junction near Shelford to Shepreth was built. Back in 1848 Parliament granted authority to the Royston and Hitchin Railway to extend their line from Royston. Although Cambridge was its goal, Parliament sanctioned only an extension as far as Shepreth (as the Eastern Counties Railway had opposed the extension to Cambridge). The line was completed in 1851 and initially the Great Northern Railway (GNR), who had leased the Royston and Hitchin Railway in the interim, ran a connecting horse-drawn omnibus service. This proved unsuccessful so the new line and the line to Hitchin were leased to the Eastern Counties Railway for 14 years, with a connection at Shepreth to enable the Template:Abbr to run trains from Cambridge to Hitchin.<ref>Template:Cite book</ref>

In 1852, the Template:Abbr took over operation of the East Anglian Railway (EAR). The company's property had been taken over by the receiver in June 1850 and the Template:Abbr was leased to the GNR. The Template:Abbr had running powers over the Template:Abbr line between Peterborough, March and Wisbech (opened 1847). Unfortunately, they had not applied for running rights over the line that linked the Template:Abbr and Template:Abbr stations at Wisbech and the Template:Abbr refused access so that the passengers had to change stations by horse-bus. However, shareholder opposition within the Template:Abbr and Template:Abbr were the real reason why the Template:Abbr withdrew from the arrangement allowing the Template:Abbr to take over operation of the Template:Abbr.<ref name="Allen 1955 15">Template:Harvnb</ref>

In 1853, the Eastern Union Railway (EUR) was in serious financial trouble having built lines to Norwich, Bury St Edmunds (as the Ipswich and Bury Railway), Sudbury and had a branch to Harwich under construction. Negotiations began between the Template:Abbr and Template:Abbr and on 1 January 1854 the Template:Abbr took over the working of the Template:Abbr although this was not formally ratified until the Eastern Counties and the Norfolk and Eastern Union, the East Anglian, and the Newmarket Railways Act 1854 (17 & 18 Vict. c. ccxx) of 7 August 1854. The two companies did not formally merge until they amalgamated with other railways to form the Great Eastern Railway in 1862.<ref>Template:Cite book</ref>

The Harwich branch whilst built by the Template:Abbr was opened by the Template:Abbr, the following week on 15 August.

The Template:Abbr also took over the Newmarket Railway in 1854 which linked Cambridge with Ipswich Bury St Edmunds.<ref name="Allen 1955 16">Template:Harvnb</ref>

In 1854, the Template:Abbr/Template:Abbr owned London Tilbury and Southend Railway started operating over the Forest Gate Junction to Bow Junction and onto Template:Rws. Early trains split at Stratford with a portion of the train to Bishopsgate station. A third line between Stratford and Bow Junction was built to help accommodate this traffic and Template:Abbr services had running rights into Fenchurch Street via the London and Blackwall Railway extension route.<ref>Template:Cite book</ref>

A line was also provided linking Victoria Park station on the North London Railway with Stratford Low Level and Stratford Market stations which was primarily for goods traffic.<ref>Template:Cite book</ref> The Loughton branch of the Template:Abbr was opened on 22 August 1856 with a junction just north of Stratford on the Cambridge line.

In 1859, the East Suffolk Railway (ESR) finished building a series of lines in Suffolk and south east Norfolk. These were all taken over by the Template:Abbr on opening day 1 June 1859. The Template:Abbr line from Ipswich (East Suffolk Junction) to Woodbridge (at the south end of the Template:Abbr) also opened on this day giving a through route between Ipswich, Lowestoft and Great Yarmouth (South Town).

The final railway opened by the Template:Abbr before the incorporation of the Great Eastern Railway (GER) in 1862 took place on 12 April 1860, when the Leiston branch in East Suffolk was extended to Aldeburgh.<ref name="Allen 1955 17">Template:Harvnb</ref>

OperationsEdit

Accidents and incidentsEdit

  • In September 1840, a train was in a rear-end collision with a passenger train at Old Ford, Middlesex. One person was killed.<ref name=Hall>Template:Cite book</ref>
  • On 8 May 1846, Elizabeth Ingham was killed whilst operating at Little Thetford Crossing. Her 3-year-old had followed onto the tracks and into the path of an oncoming train. She successfully rushed to save her child, but was hit by the train and killed instantly.<ref>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref>

  • In November 1846, an Inquest was held at the New Inn, Roydon, yesterday week,Template:Clarify on the body of Elizabeth Coleman, aged eleven years, who was killed upon the above line. The deceased was, it appeared, endeavouring to cross the line at a point near the Roydon station where the Lockroad crosses the line on a level, when she was struck by the buffer of a Cambridge train, and killed upon the spot. The jury returned a verdict of "Accidental death". The inquest would have taken place on Wednesday, 25 November 1846 <ref name=Journal>Template:Cite book</ref>
  • In September 1853, a freight train came to a halt near Template:Rws, Suffolk, due to a defect on the locomotive. The driver of a second freight train ignored a red signal and consequently his train was in a rear-end collision with the first. Time interval working was in force.<ref name=Vaughan>Template:Cite book</ref>
  • On 20 February 1860, a passenger train derailed at Tottenham, Middlesex, when a tyre broke on the locomotive hauling it. Seven people were killed.<ref name=Trevena>Template:Cite book</ref>

Engine sheds and worksEdit

The first engine shed was located at Whalebone Lane, Chadwell Heath opening in 1839 with the railway. Following the extension of the ECR to Brentwood in 1840, a "railway factory" at Romford (between the current stations of Chadwell Heath and Template:Rws (on the east side of the line) was built being fully operational by 1842. The most significant task the factory undertook was the gauge conversion of the ECR stock in 1844.<ref name="Taylor 28, 29">Template:Cite magazine</ref>

As the ECR, grew it became apparent that a new site would be needed and land was acquired at Stratford between the ECR Colchester line and the N&ER line to Cambridge. The N&ER had already established an engine shed at this location when their line to Broxbourne had opened in 1840.

At this stage, Stratford was a largely rural location with plenty of land being available and in connection with this move the ECR built 300 new houses for the work force.

Stratford engine shed and Stratford Works initially shared this site and it was not until the 1860s that the GER moved the engine sheds to the other side of the Cambridge line.<ref>Template:Cite book</ref>

Various other engine sheds grew up around the expanding ECR network either being constructed by the ECR or the railways it took over; for example Ipswich engine shed which was built by the Eastern Union Railway.

LocomotivesEdit

Early Eastern Counties locomotivesEdit

In order to build the line, the ECR purchased four 0-4-0 ballast locomotives delivered in late 1838 and named Suffolk, Norfolk, Essex and Middlesex. These and the next six engines ordered were built by Braithwaite, Milner and Co. Six 2-2-0 locomotives (original numbers 1 to 6) were the first ECR passenger engines and had a poor reputation with regard to derailments. Braithwaite, Milner and Co supplied another similar locomotive in 1839 which was number 7. Two 0-4-0 goods engines (8 and 9) were also ordered from Braithwaite, Milner and Co in 1840 lasting until 1849 when they were sold.

In 1841 Lancashire firm Jones, Turner and Evans supplied four 2-2-0 locomotives (Nos 12 to 15) which lasted until 1850. Later the same year Burys supplied two 0-4-2 passenger locomotives (Nos 10 and 11) to the ECR.

Numbers 16 and 17 were 2-2-0 passenger singles ordered from Bury and Co and were in service in early 1842. Later in 1842 The ECR board ordered eight more Bury singles (Nos 18 to 26). Some of these engines survived until 1859–60. Template:Sfn <ref name="Brooks 10">Template:Cite magazine</ref> These were all the locomotives purchased before the acquisition of the Northern and Eastern Railway in 1844 and the gauge conversion of late 1844 when many of these engines were converted to UK standard gauge at the Romford factory.<ref name="Taylor 28, 29"/>

Locomotive fleet as at 1856Edit

As described above, the ECR grew up in piecemeal fashion at times ordering its own locomotives, and then acquiring other companies' locomotives when the firms were taken over. This makes the history quite complex and the table below is an overview of the company's locomotives in 1856.<ref>Template:Cite magazine</ref><ref>Template:Cite book</ref>

Running number Builder Number in class Notes
1–3 Wilson & Co 3 Small tank engines purchased from contractor Samuel Morton PetoTemplate:Sfn
4–6 Longridge 3 built 1851–52 J V Gooch 2-2-2WT A Class
7–12 ECR 5 built 1853–54 J V Gooch 2-2-2WT B Class
13–16 Sharp & Co 4 ex Eastern Union Railway Nos 27, 29, 30 and 31 respectively 2-2-2WT built 1846–47
17 Kitson & Co 1 ex Eastern Union Railway No 28 Ariel's Girdle 2-2-0WT
18–19 Wilson & Co 2 Rebuilt by ECR to 2-4-0ST for shunting at Bishopsgate Goods Depot
20–25 ECR 6 built 1852 J V Gooch 2-2-2WT A Class. No 20 was the first locomotive built at Stratford Works
26 Longridge 1 Former Northern & Eastern Railway single — 2-2-2 built 1840.Template:Sfn
27 ECR 1 New Gooch designed C Class 2-2-2 introduced in October 1856.Template:Sfn
28–30 Stephenson/Longridge 3 Former Northern & Eastern Railway singles — 2-2-2 built 1840.Template:Sfn The previous number 27 (in this particular numbering scheme) was also one of these locomotives.
31–36 Gilkes 6 Ex Newmarket and Chesterford Railway 2-4-0s built 1848 added to stock 1851.Template:Sfn<ref>Template:Cite magazine</ref>
37–41 Wilson & Co 4 Originally part of a cancelled order for the East Lancashire Railway. built 1846 2-4-0 ?Template:Sfn
42 Tayleur & Co 1 Ex Norfolk Railway no 13Template:Sfn
43–44 Jones & Potts 2 built 1845 2-2-2 Template:Sfn
45–48 Stephenson 4 ex Norfolk Railway nos 4, 6, 7, 8.Template:Sfn
51–67 Stothert & Slaughter 17 51–60 built 1845, 61–67 built 1846–47. Two of the earlier examples were involved in derailments, forcing later modifications. Built for the opening of the ECR's Brandon extension and used on passenger trains.Template:Sfn Despite the inauspicious start, the locomotives lasted until the 1870s and several were based at Cambridge engine shed.<ref>Template:Cite magazine</ref>
68–77 Stephenson 10 built 1846–47 2-4-0 goods engines. Nos 98–102 were part of same order.
78–81 Jones & Potts 6 2-4-0 Goods engines built 1846–47 – Nos 182–187 were part of the same order (originally numbered 82–87).Template:Sfn
82–87 Stephenson 5 Built 1847–48 2-4-0.Template:Sfn
88–93, 96–97 Jones & Potts 8 Note non sequential numbers being withdrawn at this time. Built 1846–47 2-2-2-0.<ref name="Brooks 10"/>
94 ECR 1 A Gooch C class 2-2-2 under construction at Stratford
95 Stephenson 1 Ex Midland Railway no 70 purchased 1847
98–102 Stephenson 5 built 1846 4-2-0 passenger engines but all rebuilt as 2-2-2 by 1852Template:Sfn
103–107 Wilson & Co 5 103–105 built 1847, 106 and 107 built 1848 Jenny Lind type engines.Template:Sfn
108–117 Sharp & Co 10 Former East Anglian Railway locomotives built 1846.<ref name="Brooks 13">Template:Cite magazine</ref>
118–119 Wilson & Co? 2 4-2-0 built 1846
120 Hawthorn 1 Built 1843 but to ECR 1845. Little known about this engine apart from it was ordered by George Hudson.Template:Sfn
122–123 Bury & Co 2 4-2-0 built 1846
124 Jones & Potts 1 Ex Norfolk Railway no 12 – possibly rebuilt as a 2-4-0.Template:Sfn
125–128 Bury & Co 3 One not in service? Further 4-2-0 types built 1846?
129 Stephenson 10 Former ECR ballast engine built 1838 rebuilt as 0-4-0T.Template:Sfn
130–139 Stephenson 10 Ex Norfolk Railway 0-6-0 built 1846–47 — rebuilt by Sinclair 1861.<ref name="Brooks 13"/>
141–144 Tayleur & Co 4 ex Norfolk Railway nos. 10, 11, 14, 15. 0-6-0?Template:Sfn
145–146 Longridge 2 built 1846 as 0-4-2 but rebuilt by Kitsons as 2-4-0 in 1849.Template:Sfn
147–149 Kitson & Co 3 built 1846–47 0-6-0
151–152 Jones & Potts 1 built 1846 0-6-0. Rebuilt 1849 Tayleur & Co. Goods engines for Brandon extensionTemplate:Sfn
154 Stephenson 1 built 1847 0-6-0 Goods engineTemplate:Sfn
155–161 Stothert & Slaughter 7 built 1846–47 0-6-0 goods engines Template:Sfn
162–164 Sharp Brothers 3 Two were former East Anglian Railway 0-4-2 goods locomotives.<ref>Template:Cite magazine</ref>
163–168 Stothert & Slaughter 6 built 1847–48 0-6-0 goods engines Template:Sfn
170–171 Jones & Potts 2 2-4-0 built 1846. Goods engines for the Brandon extension.<ref>Template:Cite magazine</ref>Template:Sfn
172–181 Tayleur & Co 10 citation CitationClass=web

}}</ref>

182–187 Jones & Potts 4 See Nos. 78–81 — these built 1847–48
184–187 Tayleur & Co 2 Being introduced
188 Bury & Co 1 Bury type 0-4-2 goods locomotive.Template:Sfn
189–192 Stephenson 4 0-4-2? goods locomotives. 189 built in 1847, 190–192 built in 1849 and fitted with solid wrought iron wheels.Template:Sfn
193–200 Wilson & Co 8 2-4-0 Goods engines 193–195 built 1847. 196–200 built 1849Template:Sfn
201–204 Jones & Potts 4 Originally built as 2-2-2 locomotives and nicknamed Jumpers because of their propensity to derail. 201–203 were rebuilt as 2-4-0 goods engines by Gooch Template:Circa. 204 was an identical locomotive but former Norfolk Railway No 12
205–213 Stothert & Slaughter 9 ex Eastern Union Railway Nos. 7, 8 (2-2-2) 9, 10 (0-4-2) 19–21 (2-2-2) and 22–26 (0-4-2) respectively built 1846–48
214–219 Canada Works 6 J V Gooch C Class 2-2-2 Built 1855–56 — ordered at same time as 274–279 and known as Butterflies.Template:Sfn
220–223 Tayleur & Co 4 Ex Norfolk Railway Nos 16–19.Template:Sfn
224–227 Stephenson 4 Ex Norfolk Railway Nos 20–23.Template:Sfn
228, 231, 232 Tayleur & Co 3 Ex Norfolk Railway Nos 25, 28 and 29.Template:Sfn
233–237 Wilson & Co 4 Gooch 1854–55 rebuilds of ECR Cramptons as 0-6-0 goods engines. Nicknamed floating batteries.Template:Sfn
238–243 Sharp Brothers 6 Further orders of the Butterflies (see nos 214–219 above). These and nos 244–249 were ordered at the same time and delivered during 1855. The tenders were built at Stratford Works.Template:Sfn
244–249 Kitson & Co 6 See above
250–259 ECR 10 built 1854–55 J V Gooch 2-2-2WT A Class for operation on the LTSR.Template:Sfn
260–270 Sharp Brothers 11 ex Eastern Union Railway Nos. 1–6, 14–19 respectively 2-2-2 built 1846–47
271–273 Hawthorn 3 ex Eastern Union Railway Nos. 11, 12, 13 respectively 2-2-2 built 1846–47
274–279 Canada Works 6 Express 2-2-2 locomotives delivered in 1856.Template:Sfn
280–283 ECR 3 further Gooch designed 2-2-2 express locomotives delivered in 1856–57

Robert SinclairEdit

Robert Sinclair took over as Locomotive Superintendent after Gooch’s departure. In 1858, he designed a small class of 2-4-0 (known as Z class) built by Rothwell and Co. These were locomotives numbered 301 to 306.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

As can be seen from the table above, he inherited a mixed bag of locomotives and set out on a road of standardisation. Perhaps the best example of this was his Y class 2-4-0 introduced in 1859, which when finished (in Great Eastern days and after Sinclair had departed the company) numbered 110 locomotives. Although the general design was the same the locomotives were built by a number of different companies including Kitsons, Vulcan and in 1865 (in GER days) the French railway firm Schneider at cie.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The ECR sent the first Y class No 327 (an example built by Stephenson) to the 1862 International Exhibition where it caught the eye of the Egyptian government who ordered 11 similar locomotives.<ref>Template:Cite magazine</ref>

Sinclair’s only other design (for the ECR) was the five strong X class 2-4-0WT introduced in 1862 and built at Stratford Works. Numbered 120 to 124 (noting the similarly numbered locomotives in the above table had been renumbered or withdrawn) these were deployed on the line to North Woolwich.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

CarriagesEdit

The Railway Act 1844 laid down standards for third-class carriages. Facilities were very spartan with wooden benches seating 46 passengers who could access the three compartments through three doors. The middle compartment seated 18 passengers whilst the end compartments seated 14 each.<ref>Template:Cite magazine</ref>

It is known that carriages were built at Stratford Works and Fairfield Works in Bow.<ref>Template:Cite magazine</ref>

An ECR first class carriage has survived and is part of the UK national collection.

File:Eastern Counties Railway 1st Class carriage (6871499195).jpg
Eastern Counties Railway 1st Class carriage

Goods trafficEdit

Goods traffic on the ECR was largely agricultural in nature. The table below shows a breakdown of the traffic carried week ending 6 May 1849.<ref>Template:Cite magazine</ref>

Type Amount
Cattle 1,537
Sheep 3,540
Pigs 254
Grain 17,431 sacks
Flour 6,874 sacks
Wool 65 tons
Fresh meat 209 tons
Poultry 51 tons
Fresh fish 219 tons
Fruit and vegetables 274 tons
Ale 246 tons
Wine and spirits 80 tons
Milk 20,672 quarts
Bread 63 quatern (4 lb) loaves
General merchandise 2,433 tons

InnovationsEdit

Use of steam excavating machineEdit

Railways in the UK were generally built by pick, shovel and large numbers of railway navvies. Engineer John Braithwaite deployed the first steam excavating machine used on a UK railway at Brentwood (exact date unknown but working in 1843).<ref>Template:Cite magazine</ref>

Two wheel pony truckEdit

The ECR was the first railway company to use a two-wheel pony truck, in 1859, using the design of American inventor Levi Bissell. This innovation was patented in the USA on 2 November 1858 and on 1 December 1858 in Great Britain. In the summer of 1859 the ECR fitted the truck to locomotive 248, a Kitsons built 2-4-0 of 1855, and it was reported that the ride of the locomotive was improved and wheel flange wear noticeably reduced. <ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

An early steam coachEdit

In 1849 the ECR introduced a steam rail motor called Enfield which worked on the Enfield Branch Line. This locomotive was a 2-2-0 locomotive and 36-seat four-compartment coach on one frame and was built by William Bridges Adams in 1849 at Fairfield Works, Bow. It proved reasonably successful and in fact not long after delivery covered the Template:Convert route from Bishopsgate to Norwich via Cambridge in a creditable (for the time) 3 hours 35 minutes.

Enfield was later converted to a 2-2-2T locomotive as the difficulty of a combined locomotive/carriage (presumably too long for early turntables?) became apparent.<ref>Template:Cite book</ref><ref>Template:Cite magazine</ref>

Track gaugeEdit

At the time of the railway's construction, there was no legislation dictating the choice of gauge. The ECR directors favoured the Great Western Railway's broad gauge of Template:Track gauge but, mainly on the grounds of cost, construction engineer John Braithwaite recommended a gauge of Template:Track gauge. The N&ER, which was planning to use the ECR between Stratford and Bishopsgate, was forced to adopt the same gauge.<ref>Template:Cite journal</ref>

With the extension of the ECR in the early 1840s, it became apparent that Template:Track gauge was a better choice, and in September and October 1844 gauge conversion was carried out, along with the N&ER, which had merged with the ECR on 1 January 1844.

PeopleEdit

Railway organisation (1830s and 1840s)Edit

The directors were responsible for appointing staff whilst a finance committee decided the wages. The engineer was responsible for rolling stock and permanent way whilst the traffic manager dealt with operations. Stations were run by a police sergeant who had ticket clerks under them and they reported to a number of inspectors and an overall manager. Other policemen were responsible for the operation of points and signals as well as more familiar duties. Conductors were in charge of trains assisted by guards and a small number of porters.Template:Sfn

Locomotive superintendentsEdit

  • John Hunter 1846–1850
  • John Viret Gooch 1850–1856 was dismissed for financial irregularities (details on that entry).
  • Robert Sinclair 1856–1863 was the first Locomotive Superintendent of the Great Eastern Railway.

ChairmenEdit

Hudson was appointed chairman of the ailing Eastern Counties Railway in 1845 and one of his first actions was to appoint David Waddington as his vice chairman.<ref name="Dalling 20">Template:Cite journal</ref> Hudson was interested in the ECR as he felt it offered an opportunity for an alternative route from York to London although the truth was the ECR had an appalling reputation for time keeping and safety at this time; Hudson immediately ordered the payment of a generous dividend for the shareholders.
Later investigation showed that whilst Hudson decided the levels of dividends to be paid to shareholders it was Waddington's job to doctor the traffic accounts to make it appear legally earned. Waddington also siphoned off £8,000 of the ECR's money into a parliamentary slush fund which strained relations between Hudson and Waddington.<ref name="Dalling 20"/>
Hudson cut costs in a similar way on the North Midland Railway and an accident at Romford on 18 July 1846 led the satirical magazine Punch to petition Hudson to the effect that:
"by reason of the misconduct, negligence and insobriety of drivers and sundry stokers, engineers, policemen, and others, your Majesty's subjects, various and several collisions, explosions and oversettings are continually taking place on the railways, your Majesty's dominion".

Woolwich FerryEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} Following the opening of the line to North Woolwich the ECR ordered two ferries called Essex and Kent from Blyth & Co of Barking. The two wooden paddle steamers weighed 65 tons (gross), Template:Cvt long, Template:Cvt beam and Template:Cvt depth. The cost for each boat was £3,250.

Between June and August 1854, 113,315 passengers used the ferry, whilst a year later this had risen to 141,025. In 1856 the two ferries were overhauled at Blyth & Co and continued in use on the ferry for a number of years after the 1862 merger with the Great Eastern.<ref>Template:Cite magazine</ref>

Merger into the Great Eastern RailwayEdit

Between 1851 and 1854 the ECR had under the chairmanship of David Waddington negotiated arrangements to work most of the other railways in East Anglia resulting in a network of lines totalling Template:Convert. Whilst Parliament favoured competition it was also aware that the ECR was constantly at war with its neighbours and whilst these working arrangements were approved there was a condition that a bill for full amalgamation was to be presented to Parliament by 1861.

Waddington departed under a cloud in 1856 and was replaced by Horatio Love. By 1860 many shareholders were unhappy listing several grievances they saw as getting in the way of their dividend payments. These included, continual conflict over the working of other lines, suspicion and distrust of the joint committee, inadequate services to and from London, ongoing litigation and legal costs and a lack of progress on amalgamation.

By February 1862 the bill had its second reading and was then followed by a lengthy committee process where various parties petitioned against the bill. On 7 August 1862 the bill passed and the Great Eastern Railway was formed by the amalgamation of the Eastern Counties Railway and a number of smaller railways.<ref>Template:Cite journal</ref>

ReferencesEdit

Template:Reflist

BibliographyEdit

|CitationClass=web }}

Further readingEdit

Template:Authority control