Template:Short description Template:Use dmy dates Template:Main other{{#invoke:Infobox|infobox}}Template:Template other{{#invoke:Check for unknown parameters|check|unknown=Template:Main other|preview=Page using Template:Infobox bridge with unknown parameter "_VALUE_"|ignoreblank = 1| also_known_as | alt | aqueduct_name | architect | begin | below | bridge_name | builder | built | capacity | caption | carries | child | clearance | clearance_above | clearance_below | closed | collapsed | demolished | complete | contracted_designer | coord_format | coordinates | cost | crosses | dedicated | depth | design | designer | destroyed | diameter | downstream | electrification | embed | embedded | ends | engineering | extra | fabricator | fetchwikidata |first_length | first_diameter | followed | gauge | height | heritage | id | id_type | image | image_caption | image_size | image_upright | inaugurated | lanes | length | life | load | locale | location | mainspan | maint | maintained | mapframe | mapframe-caption | mapframe-custom | mapframe-id | mapframe-coord | mapframe-wikidata | mapframe-point | mapframe-shape | mapframe-frame-width | mapframe-frame-height | mapframe-shape-fill | mapframe-shape-fill-opacity | mapframe-stroke-color | mapframe-stroke-colour | mapframe-stroke-width | mapframe-marker | mapframe-marker-color | mapframe-marker-colour | mapframe-geomask | mapframe-geomask-stroke-color | mapframe-geomask-stroke-colour | mapframe-geomask-stroke-width | mapframe-geomask-fill | mapframe-geomask-fill-opacity | mapframe-zoom | mapframe-length_km | mapframe-length_mi | mapframe-area_km2 | mapframe-area_mi2 | mapframe-frame-coordinates | mapframe-frame-coord | mapframe-switcher | material | material1 | material2 | name | named_for | native_name | native_name_lang | notrack | num_track | number_spans | official_name | onlysourced | open | opened | opening | os_grid_reference | other_name | owner | passable | piers_in_water | pierswater | preceded | qid | rebuilt | references | refs | replaced_by | replaces | second_length | second_diameter | spans | starts | structure_gauge | third_length | third_diameter | toll | towpath | track_gauge | traffic | traversable | upstream | website | width | winner }}Template:Main other

The First Thai–Lao Friendship BridgeTemplate:Efn is a bridge over the Mekong, connecting Nong Khai Province and the city of Nong Khai in Thailand with Vientiane Prefecture in Laos. The Lao capital city Vientiane is approximately Template:Convert from the bridge.

The bridge is 1,170 meters (0.73 mi) long. It has two Template:Convert-wide road lanes, two Template:Convert-wide footpaths and a single Template:RailGauge gauge railway line in the middle, straddling the narrow central reservation.

HistoryEdit

File:Thai-Laos border. (3720324366).jpg
A plaque in Laos, in Lao and English, commemorating the First Thai-Lao Friendship Bridge.

Opened on 8 April 1994, it was the first bridge across the lower Mekong, and the second on the full course of the Mekong.Template:Citation needed

The cost was about A$42 million, funded by the Government of Australia as development aid for Laos.<ref name="AE-Bridge">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The bridge was designed and built by Australian companies as a demonstration of their ability to complete major infrastructure projects in Southeast Asia. The concept design of a balanced cantilever bridge was proposed by Bruce Ramsay of VSL with the final design carried out by Maunsell consulting engineers.Template:CN It was built by John Holland.<ref>Template:Cite book</ref>

The official name of the bridge was changed, with the addition of "First" after the opening of the Second Thai–Lao Friendship Bridge further south at Savannakhet in January 2007.

Road trafficEdit

File:Fari-Wechsel.jpg
A sign for the road rules change at the Thai–Lao Friendship Bridge.

Traffic on the bridge drives on the left, as in Thailand. Traffic in Laos drives on the right. The changeover at the Lao end, just before the border post, is controlled by traffic lights.

A shuttle bus service operates across the bridge, between the Lao and Thai border posts.

Bicycles and tricycles can travel on either the road or the footpath, while pedestrians can walk directly on the footpath.

The bridge is part of AH12 of the Asian Highway Network.

RailwayEdit

A meter gauge rail track from Nong Khai station runs along the central reservation of the bridge. Road traffic is stopped when a train is crossing.

In March 2004, an agreement between the Thai and Lao governments was signed to extend the railway to Thanaleng Railway Station in Laos, about Template:Convert from the bridge. This was the first modern railway link to Laos, as a short portage line once existed. The Thai government agreed to finance the line through a combination of grant and loan.<ref name=testing /> Construction began in January 2007.<ref>Template:Cite news</ref> Test trains began running in July 2008.<ref name=testing>Template:Cite news</ref> The formal inauguration occurred on 5 March 2009.<ref name=inaguration>Template:Cite newsTemplate:Dead link</ref>

In February 2006, approval of funding for the rail line from Thanaleng Railway Station to Vientiane, was announced by the French Development Agency.<ref>Saeung, Sopaporn (23 February 2006). "France okays Thai-Laos railway link" Template:Webarchive, The Nation.</ref>

A US$50 million loan was reportedly received from the Thai government for the extension. Construction was originally slated to begin in December 2010. Lao railway officials confirmed as late as September 2010 that plans would go ahead. The extension, which would have taken an estimated three years to complete, would have stretched Template:Convert from Thanaleng to a new main Khamsavath Station.<ref>Laos and Thailand set to begin building railway extension into Vientiane</ref> The station will be completed by June 2022, and open 2023.

Since February 2010, the Eastern and Oriental Express crosses the Mekong via the bridge into Laos.<ref>Template:Cite news</ref> There is currently no connection to the China-Laos Railway. The standard gauge line circles the north east of Vientiane, to a depot just 2 km from the Friendship Bridge. A new bridge is proposed from this point, to join the proposed Thai High speed line at Nong Khai station just south of the Mekong.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

See alsoEdit

NotesEdit

Template:Notelist

ReferencesEdit

Template:Reflist

External linksEdit

Template:Sister project

Template:Coord