Four Seasons Centre
Template:Short description Template:Use dmy dates Template:Infobox venue The Four Seasons Centre for the Performing Arts is a 2,071-seat theatre in Toronto, Ontario, Canada, located at the southeast corner of University Avenue and Queen Street West, across from Osgoode Hall. The land on which it is located was a gift from the Government of Ontario. It is the home of the Canadian Opera Company (COC) and the National Ballet of Canada.<ref>Crabb, Michael (27 November 2016). "Xiao Nan Yu is heart-wrenching in National Ballet's Onegin: review". Toronto Star.</ref> The building's modernist design by was created by Canadian firm Diamond Schmitt Architects, headed by Jack Diamond. It was completed in 2006, and the interior design includes an unusual glass staircase.<ref>Template:Cite conference</ref>
HistoryEdit
In the 1980s, the Canadian Opera Company and financier Hal Jackman, president of the Ballet Opera House Corporation, had begun lobbying for a new building to replace the O'Keefe Centre (now known as Meridian Hall). This building had housed the opera company for about 40 years. The company had also previously been housed in the Royal Alexandra Theatre on King Street and the Elgin Theatre on Yonge Street.<ref>Template:Cite journal</ref> Earlier in the city's history, the Grand Opera House stood at Bay and Adelaide until it was demolished in 1927.
Bay Street proposalEdit
In 1984, Ontario premier Bill Davis promised that a piece of provincially owned land at Bay Street and Wellesley Street would be the home for the new opera house. The lot was estimated to be worth some Template:CAD million.<ref>Template:Cite news</ref>
A design competition was won by the postmodern project of Moshe Safdie.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In 1988, the project was approved and the existing stores and government offices on the site were demolished.
After a new Ontario New Democratic Party (NDP) provincial government under Bob Rae was elected in 1990, inheriting a large deficit because of a recession, the Template:CAD million project was deemed excessively costly. The province was also dealing with the unexpectedly high Template:CAD million cost of the SkyDome project. When the opera house corporation refused to modify the design to lower costs, the government withdrew its funding commitment two months after the election.<ref>Template:Cite news</ref> In 1992, the province cancelled the project and the land was sold to developers. Two towers in the "Opera Place I and II" development have been built on Bay Street (1998), but as of June 2011, the rest of the property remained vacant until the Teahouse Condo was completed in 2020.Template:Needs update
University Avenue projectEdit
In 1997, the province allocated a parking lot, which previously housed offices for the Supreme Court of Ontario at Queen and University, for the project. The lot was valued at Template:CAD million, and the federal and provincial governments also pledged funding for a new more modest project that would cost about Template:CAD million. The original plan called for a Template:Convert tower of offices and condominiums to be built by Olympia and York which would help fund the project. It would be further supplemented by a Template:CAD million donation by Christopher Ondaatje. However, both Olympia and York and Ondaatje developed concerns about the project and withdrew. More importantly, the municipal government of Toronto refused to provide any municipal funding.<ref>Template:Cite news</ref> The project collapsed again in 2000.
In 2002, the opera company under Richard Bradshaw issued an invitation in 2002 for designs. The company had secured a Template:CAD million donation from the Four Seasons hotel chain in exchange for perpetual naming rights to the complex. Ten architectural firms submitted proposals and the modernist design by Canadian company Diamond Schmitt Architects, headed by Jack Diamond, was selected.
The complex took three years to construct at an estimated cost of Template:CAD million. To provide wheelchair accessibility, elevator access to the concourse level of Osgoode subway station was integrated into the construction of the centre.<ref>Template:Cite press release</ref> The centre had its grand opening on 14 June 2006, with regularly scheduled performances commencing on 12 September 2006 with the inaugural production in the new opera house being Richard Wagner's epic tetralogy Der Ring des Nibelungen (The Ring of the Nibelung). Governor General Michaëlle Jean and other prominent Canadians attended the event. Three complete Ring Cycles were performed in September 2006.
R. Fraser Elliott Hall designEdit
The five-tiered, horseshoe-shaped auditorium was modelled after European opera houses. Collaborating with Diamond Schmitt, New York-based theatre planning and design specialists Fisher Dachs Associates <ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> arranged the room's geometry and seating configuration to bring each of the 2,000 seats, including tiered balconies, as close to the stage as possible while maintaining an unobstructed view.<ref>Template:Cite journal</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
The acoustics were designed by Bob Essert of Sound Space Design<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> and a team that included Aercoustics Engineering,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Wilson Ihrig <ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> and Engineering Harmonics.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The undulating back walls of the venue, which diffuse the sound throughout the auditorium by reflecting the sound waves back to the stage, account for about 90 percent of the audible sound for the audience. To prevent audience members from detecting specific sounds and vibrations including traffic noise, the rumble from the adjacent Line 1 Yonge–University subway line and 501 Queen streetcar line, and even the sirens of the emergency vehicles rushing to the nearby hospitals, the theatre sits on 489 rubber insulating pads.<ref>Template:Cite journal</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Other design elements reflect historic performance halls, including the Roman Amphitheatre.
ExteriorEdit
The hall was constructed on a limited budget, using contrasting materials. The City Room glass walls, curtain walls held by steel fixtures, look out on University Ave and Queen Street. The east, south and north sides are clad in dark brick. Windows on the north side have a view of Osgoode Hall, but the exterior on that side is unadorned.<ref>Template:Cite book</ref>
On the west is the sidewalk extension City Room, which is transparent and which illuminates the street. The solid, massive eastern facade broken only by horizontal windows, in contrast, blends into its office building and brick surroundings, towards York Street. John Bentley Mays states in his 2006 Canadian Architect article that East wall is "unresponsive to the need of vitality on the street." The southern, Richmond Street facade, also plain brick punctuated by dressing room windows, is opposite the Hilton Hotel. Architect Diamond defends his rather plain design, stating, "You do not make a city out of iconic pieces."<ref>Template:Cite journal</ref>
Richard Bradshaw AmphitheatreEdit
The Richard Bradshaw Amphitheatre in the City Room links Rings 3 and 4. It provides seating for 100 patrons. During the season several concerts per week in a variety of genres are presented here.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Operatic and other production historyEdit
Outside of the standard opera repertory, some of the less-often performed, new works, or national premieres performed by the Canadian Opera Company include:
- 2006: R. Wagner: Der Ring des Nibelungen (Canadian premiere)
- 2007: Shostakovich: Lady Macbeth of Mtsensk
- 2008: Janáček: From the House of the Dead
- 2010: Donizetti: Maria Stuarda
- 2011: Iphigenia in TaurisTemplate:Clarify
- 2012: Kaija Saariaho: Love from Afar
- 2012: Zemlinski: A Florentine Tragedy / Puccini: Gianni Schicchi
- 2012: SemeleTemplate:Clarify
- 2018: Rufus Wainwright: Hadrian
Dancap Productions has also given presentations of musicals at the Four Seasons Centre, including:
- 2010: Schönberg/Boublil/Maltby Jr: Miss Saigon
- 2010: Rodgers/Hammerstein: South Pacific
- 2011: Tom Kitt/Brian Yorkey: Next to Normal
- 2011: Colm Wilkinson in Concert
- 2011: Twyla Tharp: Come Fly Away
See alsoEdit
Other performing arts venues in the city include: Template:Div col
ReferencesEdit
External linksEdit
- Template:Official
- "Four Seasons Centre" by Sarah Church, 15 December 2013, The Canadian Encyclopedia
- Review construction progress
Template:Theatres in Toronto Template:Portal bar Template:Authority control