Template:Short description Template:Infobox rail service Korea Train eXpress (Template:Korean), often known as KTX, is South Korea's high-speed rail system, operated by Korail. Construction began on the high-speed line from Seoul to Busan in 1992. KTX services were launched on April 1, 2004.
From Seoul Station the KTX lines radiate with stops at Seoul Station, Yongsan station towards Busan and Gwangju. A new line from Wonju to Gangneung was completed in December 2017 to serve the 2018 Winter Olympics in Pyeongchang.
The current maximum operating speed for trains in regular service is Template:Convert, though the infrastructure is designed for Template:Convert.
The initial rolling stock was based on Alstom's TGV Réseau, and was partly built in Korea. The domestically developed HSR-350x, which achieved Template:Convert in tests, resulted in a second type of high-speed trains now operated by Korail, the KTX-Sancheon, which entered into commercial service in 2010.
The next generation experimental electric multiple unit prototype, HEMU-430X, achieved Template:Convert in 2013, making South Korea the world's fourth country after Japan, France and China to develop a high-speed train running on conventional rail above Template:Convert. It was further developed into commercialised variants, namely KTX-Eum and KTX-Cheongryong, with respective maximum service speeds of Template:Convert and Template:Convert, which entered into KTX services in 2021 and 2024, respectively.
In June 2024, South Korea and Uzbekistan concluded a KRW 270 billion (approximately US$196 million) deal to apply KTX technology in Uzbekistan by supplying high-speed trains and Korail expertise.<ref>Template:Cite news</ref><ref>Template:Cite news</ref>
HistoryEdit
Origins of the projectEdit
The Seoul-Busan axis is Korea's main traffic corridor. In 1982, it represented 65.8% of South Korea's population, a number that grew to 73.3% by 1995, along with 70% of freight traffic and 66% of passenger traffic. With both the Gyeongbu Expressway and Korail's Gyeongbu Line congested as of the late 1970s, the government saw the pressing need for another form of transportation.Template:Sfn
The first proposals for a second Seoul-Busan railway line originated from a study prepared between 1972 and 1974 by experts from France's SNCF and the Japan Railway Technical Service on a request from the IBRD.Template:Sfn<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> A more detailed 1978-1981 study by KAIST, focusing on the needs of freight transport, also came to the conclusion that separating long-distance passenger traffic on a high-speed passenger railway would be advisable, and it was adopted in the following Korean Five Year Plan.Template:Sfn
During the following years, several feasibility studies were prepared for a high-speed line with a Seoul–Busan travel time of 1 hour 30 minutes, which gave positive results.Template:Sfn In 1989, following the go-ahead for the project, the institutions to manage its preparation were established: the Gyeongbu High Speed Electric Railway & New International Airport Committee, and the High Speed Electric Railway Planning Department (later renamed HSR Project Planning Board).Template:Sfn In 1990, the planned Seoul–Busan travel time was 1 hour 51 minutes, the project was to be completed by August 1998,Template:Sfn and costs were estimated at 5.85 trillion South Korean won (₩)Template:Sfn in 1988 prices, 4.6 trillion of which were to be spent on infrastructure, the remainder on rolling stock.Template:Sfn
As planning progressed, the Korea High Speed Rail Construction Authority (KHSRCA) was established in March 1992 as a separate body with its own budget responsible for the project.Template:Sfn In the 1993 reappraisal of the project, the completion date was pushed back to May 2002, and cost estimates grew to ₩10.74 trillion.Template:SfnTemplate:Sfn 82% of the cost increase was due to a 90% increase in unit costs in the construction sector, mostly labour costs but also material costs,Template:Sfn and the remainder due to alignment changes.Template:SfnTemplate:Sfn To finance the project, the option of a build-operate-transfer (BOT) franchise was rejected as too risky.Template:Sfn Funding included direct government grants (35%), government (10%) and foreign (18%) loans, domestic bond sales (31%) and private capital (6%).Template:Sfn
Creation of the systemEdit
Start of high-speed line constructionEdit
{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} KHSRCA started construction of the Seoul–Busan Gyeongbu high-speed railway (Gyeongbu HSR) on June 30, 1992, on the Template:Convert long section from Cheonan to Daejeon, which was intended for use as test track.Template:Sfn
Construction started before the choice of the main technology supplier, thus alignment design was set out to be compatible with all choices.Template:Sfn Of the planned Template:Convert line, Template:Convert would be laid on bridges, and another Template:Convert in tunnels.Template:Sfn However, plans were changed repeatedly,Template:Sfn in particular those for city sections, following disputes with local governments,Template:Sfn while construction work suffered from early quality problems.<ref name="tcibadquality">Template:Cite news</ref> Planned operating speed was also reduced from Template:Convert to the Template:Convert maximum of high-speed trains on the market.Template:Sfn Three competitors bid for the supply of the core system, which included the rolling stock, catenary and signalling:Template:Sfn consortia led by GEC-Alsthom, today Alstom, one of the builders of France's TGV trains; Siemens, one of the builders of Germany's ICE trains; and Mitsubishi Heavy Industries, one of the builders of Japan's Shinkansen trains.<ref name="ON2004">Template:Cite news</ref> In 1994, the alliance of GEC-Alsthom and its Korean subsidiary Eukorail were chosen as winner.<ref name="alstom2004">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
The technology was almost identical to that found on the high-speed lines of France's TGV system.<ref name="pandrolKTX">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Track-related design specifications included a design speed of Template:Convert and standard gauge.<ref name="irjMar2004">Template:Cite journal</ref>
Phase 1: Seoul–Daegu and conventional line upgradesEdit
Template:See also Following the 1997 Asian Financial Crisis, the government decided to realise the Gyeongbu HSR in two phases.Template:Sfn In a first phase, two-thirds of the high-speed line between the southwestern suburbs of Seoul and Daegu would be finished by 2004, with trains travelling along the parallel conventional line along the rest of the Seoul–Busan route.Template:Sfn The upgrade and electrification of these sections of the Gyeongbu Line was added to the project,Template:Sfn and also the upgrade and electrification of the Honam Line from Daejeon to Mokpo, providing a second route for KTX services.Template:Sfn The budget for the first phase was set at ₩12,737.7 billion, that for the entire project at ₩18,435.8 billion in 1998 prices.Template:Sfn While the share of government contributions remained unchanged, the share of foreign loans, domestic bond sales and private capital changed to 24%, 29% and 2%.Template:Sfn
The infrastructure and rolling stock were created in the framework of a technology transfer agreement, which paired up Korean companies with core system supplier Alstom and its European subcontractors for different subsystems.Template:Sfn<ref name="s2">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="SYSTRA-KTX">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Alstom's part of the project amounted to US$2.1 billion<ref name="irjMar2004"/> or €1.5 billion.<ref name="alstom2004"/>
Well ahead of the opening of the Gyeongbu HSR for regular service, in December 1999, Template:Convert of the test section, later extended to Template:Convert, was finished to enable trials with trains.Template:Sfn After further design changes, the high-speed tracks were finished over a length of Template:Convert, with Template:Convert of interconnections to the conventional Gyeongbu Line, including at a short interruption at Daejeon.<ref name="TCI_overview2005">Template:Cite newsTemplate:Dead link</ref> The high-speed section itself included Template:Convert of viaducts and Template:Convert of tunnels.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Conventional line electrification was finished over the Template:Convert across Daegu and on to Busan, the Template:Convert across Daejeon, and the Template:Convert from Daejeon to Mokpo and Gwangju.<ref name="electrification">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> After 12 years of construction and with a final cost of ₩12,737.7 billion,<ref name="han-phase2"/> the initial KTX system with the first phase of the Gyeongbu HSR went into service on April 1, 2004.<ref name="overview">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Phase 2: Daegu–Busan, extra stations, urban sectionsEdit
The Daegu–Busan section of the Gyeongbu HSR became a separate project with the July 1998 project revision, with a budget of ₩5,698.1 billion, with funding from the government and private sources by the same ratios as for phase 1.Template:Sfn In August 2006, the project was modified to again include the Daejeon and Daegu urban area passages, as well as additional stations along the phase 1 section. For these additions, the budget as well as the government's share of the funding was increased.Template:Sfn
Construction started in June 2002. The Template:Convert line, which follows a long curve to the northeast of the existing Gyeongbu Line, includes 54 viaducts with a total length of Template:Convert and 38 tunnels with a total length of Template:Convert.<ref name="han-phase2">Template:Cite news</ref> The two largest structures are the Template:Convert Geomjeung Tunnel, under Mount Geumjeong at the Busan end of the line;<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> and the Template:Convert Wonhyo Tunnel,<ref name="wonhyo-map-wetlands">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> under Mount Cheonseong south-west of Ulsan, which became the longest and second longest tunnels in Korea once the line opened.<ref name="tunnelcompl">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
A long dispute concerning the environmental impact assessment of the Wonhyo Tunnel, which passes under a wetland area,<ref name="wonhyo-map-wetlands"/> caused delays for the entire project.<ref>Template:Cite news</ref> The dispute gained nationwide and international attention due to the repeated hunger strikes of a Buddhist nun, led to a suspension of works in 2005,<ref>Template:Cite news</ref> and only ended with a supreme court ruling in June 2006.<ref name="tci-tunnelcourt">Template:Cite news</ref> With the exception of the sections across Daejeon and Daegu, the second phase went into service on November 1, 2010.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> By that time, ₩4,905.7 billion was spent out of a second phase budget, or ₩17,643.4 billion out of the total.<ref name="han-phase2"/>
The two sections across the urban areas of Daejeon and Daegu, altogether Template:Convert, will be finished by 2014.<ref name="han-phase2"/> As of October 2010, the total cost of the second phase was estimated at ₩7,945.4 billion, that for the entire project at ₩20,728.2 billion.<ref name="han-phase2"/> The last element of the original project that was shelved in 1998, separate underground tracks across the Seoul metropolitan area, was re-launched in June 2008, when an initial plan with a Template:Convert long alignment and two new stations was announced.<ref>Template:Cite news</ref>
Further upgrades of connecting conventional linesEdit
The electrification and the completion of the re-alignment and double-tracking of the Jeolla Line, which branches from the Honam Line at Iksan and continues to Suncheon and Yeosu, began in December 2003, with the aim to introduce KTX services in time for the Expo 2012 in Yeosu.<ref name="irjJan2007"/> The upgrade will allow to raise top speed from Template:Convert.<ref name="irjJul2008">Template:Cite journal</ref><ref name="rgi-korailplans">Template:Cite magazine</ref> The section of the perpendicular Gyeongjeon Line from Samnangjin, the junction with the Gyeongbu Line near Busan, to Suncheon is upgraded in a similar way, with track doubling, alignment modifications and electrification for Template:Convert.<ref name="irjJul2008"/><ref name="rgi-korailplans"/> The until Masan was opened on December 15, 2010.<ref name="Korail-15Dec2010">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The upgrade is to be complete until Jinju by 2012 and Suncheon by 2014.<ref name="irjJul2008"/><ref name="rgi-korailplans"/> The top speed of the AREX line, Seoul's airport link, is to be raised from Template:Convert for the KTX.<ref name="AREX-KTX">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
The Ulsan–Gyeongju–Pohang section of the Donghae Line is foreseen for an upgrade in a completely new alignment that circumvents downtown Gyeongju and connects to the Gyeongbu High Speed Railway at Singyeongju Station, allowing for direct KTX access to the two cities. On April 23, 2009, the project was approved by the government and a ground-breaking ceremony was held.<ref name="pohangstatus2010"/> The altogether Template:Convert line is slated to be opened in December 2014.<ref name="pohangstatus2010">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
On September 1, 2010, the South Korean government announced a strategic plan to reduce travel times from Seoul to 95% of the country to under 2 hours by 2020.<ref name="plans2020">Template:Cite news</ref> The main new element of the plan is to aim for top speeds of Template:Convert in upgrades of much of the mainline network with view to the introduction of KTX services.<ref name="plans2020"/> The conventional lines under the scope of the plan include the above, already on-going projects, and their extensions along the rest of the southern and eastern coasts of South Korea, lines along the western coast, lines north of Seoul, and the second, more easterly line between Seoul and Busan with some connecting lines.<ref name="plans2020"/>
Further high-speed linesEdit
Template:See also Template:Update section
Honam HSREdit
Until 2006,<ref name="tci-honam-money">Template:Cite news</ref> the first plans for a second, separate high-speed line from Seoul to Mokpo were developed into the project of a line branching from the Gyeongbu HSR and constructed in two stages, the Honam High Speed Railway (Honam HSR).<ref name="honamplans">Template:Cite journal</ref> The budget for the Template:Convert first stage, from the new Osong Station on the Gyongbu HSR to Gwangju·Songjeong Station, was set at ₩8,569.5 billion.<ref name="honamplans"/> The second stage, the Template:Convert remaining to Mokpo, was to be finished by 2017 with a budget of ₩2,002.2 billion.<ref name="honamplans"/> The Osong-Iksan section of the first phase is also intended for use as high-speed test track for rolling stock development, to be fitted with special catenary and instrumented track.<ref name="rgi-korailresearch">Template:Cite magazine</ref> The ground-breaking ceremony was held on December 4, 2009.<ref name="honam">Template:Cite news</ref> As of September 2010, progress was 9.6% of the project budget then estimated at ₩10,490.1 billion for the first phase, which was due for completion in 2014, while the estimate for the entire line stood at ₩12,101.7 billion.<ref name="KRNA_2010-H">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Suseo HSREdit
First plans for the Honam HSR foresaw a terminus in Suseo station, southeast Seoul.<ref name="honamplans"/> The branch to Suseo was re-launched as a separate project, the Suseo High Speed Railway (Suseo HSR),<ref name="suseoannounce">Template:Cite news</ref> in June 2008.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Detailed design of the Template:Convert line<ref>Template:Cite news</ref> is underway since September 2010, with opening planned by the end of 2014.<ref name="hk_design-tenders">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> For the longer term, new high-speed lines from Seoul to Sokcho on the eastern coast, and a direct branch from the Gyeongbu HSR south to Jinju and further to the coast are under consideration.<ref name="plans2020"/> In conjunction with the award of the 2018 Winter Olympics to PyeongChang in July 2011, KTX service via the eastern coast line was anticipated; the expected travel time there from Seoul is 50 minutes.
Jeju IslandEdit
In January 2009, the Korea Transport Institute also proposed a Template:Convert line from Mokpo to Jeju Island, putting Jeju 2 hours 26 minutes from Seoul.<ref name="jejuproposal">Template:Cite news</ref> The line would include a Template:Convert bridge from Haenam to Bogil Island and a Template:Convert undersea tunnel from Bogil Island to Jeju Island (with a drilling station on Chuja Island), for an estimated cost of US$10 billion.<ref name="jejuproposal"/> As the proposal was popular with lawmakers from South Jeolla Province, the government is conducting a feasibility study, but the Jeju governor expressed skepticism.<ref name="jejutunnelsceptic">Template:Cite news</ref> The Seoul-Jeju route is the world's busiest air route with 13.7 million passengers (2023). <ref name="oag-busiest">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> However, Jeju Gov. Won Hee-ryong opposed this plan since it would ruin the island's identity and make the Jeju economy more dependent on the mainland.<ref>Template:Cite news</ref>
TechnologyEdit
The shock absorption design absorbs 80 percent of the shock energy when the train crashes.<ref name="ktx-1">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Automatic ventilation is installed to prevent noise from occurring when trains enter and exit the tunnel.<ref name="ktx-1" /> Articulated bogies help increase ride comfort and driving safety.<ref name="ktx-1" />
On June 14, 2024, Uzbekistan and South Korea finalized a US$196 million deal for KTX technology to be applied in Uzbekistan. This was the first time KTX technology was exported.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="ktx-eum-UTY">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> As part of the deal, 42 train units capable of going up to Template:Convert were to be supplied for Template:Convert of rail in Uzbekistan. Operations were scheduled to begin in April 2027.<ref name="ktx-eum-UTY" />
Rolling stockEdit
KTX-IEdit
{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}
The initial KTX-I trainsets, also known as simply KTX or as TGV-K,<ref name="irj-kim">Template:Cite journal</ref> are based on the TGV Réseau, but with several differences.<ref name="s2"/> 46 trains were built - the initial twelve in France by Alstom, the remainder in South Korea by Rotem.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The 20-car electric multiple units consist of two traction heads, which are powered end cars without passenger compartments, and eighteen articulated passenger cars, of which the two extreme ones have one motorised bogie each.<ref name="al1">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> A KTX-I was built to carry up to 935 passengers at a regular top speed of Template:Convert,<ref name="al1"/> later increased to Template:Convert.<ref name="jai-305"/>
KTX-SancheonEdit
{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}
For less frequented relations and for operational flexibility, a 2001 study proposed a train created by scaling down the planned commercial version of the HSR-350x, by shortening the train, removing powered bogies from intermediate cars, and lowering top speed.<ref name="KRRI-G7-Honam">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Hyundai Rotem received orders for altogether 24 such trains, called KTX-II, in three batches from July 2006 to December 2008.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Design speed is Template:Convert, and revenue service speed is Template:Convert.<ref name="sbs">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The power electronics uses newer technology than the HSR-350x, and the front is a new design, too.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}Template:Dead linkTemplate:Cbignore</ref> The trainsets, of which two can be coupled together, consist of two traction heads and eight articulated passenger cars, and seat 363 passengers in two classes, with enhanced comfort relative to the KTX-I.<ref name="plans2010">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The domestic added value of the trains was increased to 87%, compared to 58% for the KTX-I.<ref name="RotemKTXIIrollout">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Imported parts include the pantographs,<ref name="panto">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> semiconductors in the power electronics,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> front design,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> couplers and final drives.<ref name="voith">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
The train was developed on the basis of the transferred TGV technology,Template:Sfn but more advanced technology was used for the new motors, power electronics and additional brake systems, while the passenger cars were made of aluminum to save weight,Template:Sfn and the nose was a new design with reduced aerodynamic drag.<ref name="jrtr-ng">Template:Citation</ref> Test runs were conducted between 2002 and 2008,<ref name="irj-kim"/> in the course of which HSR-350x achieved the South Korean rail speed record of Template:Convert on December 16, 2004.<ref>Template:Cite journal</ref>
The KTX-II was officially renamed as KTX-Sancheon (Template:Korean)<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> after the Korean name of the indigenous fish cherry salmon<ref name="TCI_sancheon">Template:Cite news</ref> before the first units started commercial service on March 2, 2010.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
However within weeks of its initial launch, mechanical and design flaws began to appear, in some cases causing trains to stop running and forcing passengers to leave the train and walk back to the station, and in one particular case derailing from the tracks on February 11, 2011. Although the trains were designed to be a domestically built replacement for the French built Alstrom trains, due to over 30 malfunctions since March 2, 2010, Korail asked manufacturer Hyundai-Rotem to recall all 19 of the trains in operation after finding cracks in two anchor bands in May 2011. <ref>KTX-Sancheon recalled after series of breakdowns. Koreatimes.co.kr (2011-05-11). Retrieved on 2013-07-12.</ref> Following the recall, the KTX-Sancheon trains were put back in service.
In addition to the 24 initial KTX-Sancheon trains, which form the KTX-Sancheon Class 11, new batches have been ordered and delivered since, to provide service on the new Honam, Suseo and Gyeonggang lines. For the opening of the Honam HSR line, 22 trainsets, named Class 12, were delivered ahead of the 2015 opening. In addition, 10 trainsets have been delivered to provide service on the Suseo line, scheduled to open in December 2016 (Class 13), and 15 trainsets (Class 14) have been ordered for the Gyeonggang Line, which opened in late 2017 ahead of the 2018 Winter Olympics.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
KTX-EumEdit
{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} Template:See also
KTX-Eum is South Korea's first high-speed electric multiple unit train, being a commercialised version of the experimental HEMU-430X previously tested by Korail. It has the maximum service speed of Template:Convert and is aimed for serving semi-high-speed railway lines.
The KTX-Eum entered service on Jungang Line on January 4, 2021, operating between electrified section of Cheongnyangni and Andong.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> It was also introduced on Gangneung Line since August 1, 2021, replacing KTX-Sancheon which would be redeployed to other KTX lines.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
A further order of 14 six-car units was placed in December 2016, both orders are to be delivered in 2020–2021.<ref name="railwayjournal2">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
KTX-CheongryongEdit
{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}
KTX-Cheongryong is a sister train of KTX-Eum, but a trainset consists of eight cars as opposed to six cars.<ref name="korailsurvey">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> It has the maximum service speed of Template:Convert and is aimed for supplementing trainsets for current high-speed rail services.
In 2016, a contract was concluded between Korail and Hyundai Rotem to build 2 pre-series sets of KTX-Cheongryong.<ref name="railwaygazette">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> These trainsets entered service on the Gyeongbu high-speed railway and Honam high-speed railway on May 1, 2024.<ref name="cheongryong1">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Another 17 trainsets ordered by Korail are scheduled to be delivered between April 2027 and March 2028.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
List of KTX linesEdit
Current linesEdit
Line | Section | Length | Opened | Operating speed | ||
---|---|---|---|---|---|---|
km | mi | kph | mph | |||
Gyeongbu HSR | Gwangmyeong – Sindong Interconnection | 223.6 | 138.9 | April 1, 2004 | 305 | 190 |
Dongdaegu – Busan | 122.8 | 76.3 | November 1, 2010 | |||
Daejeon South Interconnection – Okcheon Interconnection Sindong Interconnection – Daegu West Interconnection |
45.3 | 28.1 | August 1, 2015 | 130 | 80 | |
Gyeongui Line | Haengsin – Seoul | 14.9 | 9.3 | April 1, 2004 | 90 | 56 |
Gyeongbu Line | Seoul – Daejeon | 166.3 | 103.3 | 160 | 99 | |
Dongdaegu – Busan | 115.4 | 71.7 | ||||
Honam Line | Daejeon Interconnection – Seodaejeon – Iksan | 87.9 | 54.6 | 180 | 112 | |
Gwangju-Songjeong – Mokpo | 66.8 | 41.5 | ||||
Gyeongjeon Line | Mijeon Interconnection – Masan | 42.0 | 26.1 | December 15, 2010 | 160 | 99 |
Masan – Jinju | 49.3 | 30.6 | December 15, 2012 | |||
Jeolla Line | Iksan – Yeosu Expo | 180.4 | 112.1 | October 5, 2011 | 200 | 124 |
Honam HSR | Osong – Gwangju-Songjeong | 182.3 | 113.3 | April 2, 2015 | 305 | 190 |
Donghae Line | Geoncheon Interconnection – Pohang | 38.4 | 23.9 | 200 | 124 | |
Gyeongju – Bujeon | 106.6 | 66.2 | December 20, 2024 | 150 | 93.2 | |
Jungang Line | Cheongnyangni – Seowonju | 86.4 | 53.7 | December 22, 2017 | 230 | 143 |
Seowonju – Gyeongju | 253.4 | 157.5 | January 5, 2021 | 250 | 155 | |
Gyeonggang Line | Seowonju – Gangneung | 120.3 | 74.8 | December 22, 2017 | 250 | 155 |
Yeongdong Line | Namgangneung – Donghae | 43.2 | 26.8 | March 2, 2020 | 110 | 68 |
Jungbunaeryuk Line | Pangyo – Mungyeong | 136.4 | 84.7 | December 31, 2021 | 230 | 143 |
Future linesEdit
Line | Section | Length | Opening | Operating speed | ||
---|---|---|---|---|---|---|
km | mi | kph | mph | |||
Gyeongjeon Line | Masan – Bujeon | 50.8 | 31.6 | 2022 (Planned) | 200 | 124 |
Honam HSR | Gomagwon – Imseong-ri (via Muan International Airport) | 77.6 | 48.2 | 2023 (Planned) | rowspan="3" colspan="2" Template:TBA | |
Incheon KTX Line | Songdo – Maesong Interconnection | 44.6 | 27.7 | 2025 (Planned) | ||
Suwon KTX Line | Suwon – PyeongtaekJije | 29.8 | 18.5 | 2025 (Planned) | ||
Nambunaeryuk Line | Gimcheon – Geoje | 191.1 | 118.7 | 2028 (Planned) |
Defunct linesEdit
Line | Section | Length | Opened | Closed | Operating speed | ||
---|---|---|---|---|---|---|---|
km | mi | kph | mph | ||||
Gyeongbu Line | Daejeon – Dongdaegu | 160.0 | 99.4 | June 1, 2007 | November 1, 2010 | 160 | 99 |
Gwangju Line | Songjeong Interconnection – Gwangju | 13.7 | 8.5 | April 1, 2004 | April 1, 2015 | 100 | 62 |
Honam Line | Iksan – Gwangju-Songjeong | 97.8 | 60.8 | 180 | 112 | ||
AREX | Susaek Interconnection – Incheon Int'l Airport | 45.3 | 28.1 | June 30, 2014 | July 30, 2018 | 160 | 99 |
OperationEdit
Following a phase of test operation, regular KTX service started on April 1, 2004, with a maximum speed of Template:Convert achieved along the finished sections of the Gyeongbu HSR.<ref name="overview"/> In response to frequent passenger complaints regarding speeds on the video display staying just below the advertised 300 mark, operating top speed was raised to Template:Convert on November 26, 2007.<ref name="jai-305">Template:Cite news</ref>
ServicesEdit
Services | Train # | Daily Freq. (2021) |
Route | |
---|---|---|---|---|
Gyeongbu KTX | HSR route | 00x/18x | 39–48 | (Haengsin) – Seoul – Gwangmyeong – Daejeon – Dongdaegu – Ulsan – Busan |
via Gupo | 10x/16x | 6–8 | (HSR route until Dongdaegu) – Miryang – Gupo – Busan | |
via Suwon | 12x/17x | 4–6 | Seoul – Yeongdeungpo – Suwon – (HSR route toward Busan) | |
Gyeongjeon KTX | 20x/28x | 12–16 | (Gyeongbu HSR until Dongdaegu) – Miryang – Changwon – Masan – Jinju | |
Donghae KTX | 23x/29x | 14–15 | (Gyeongbu HSR until Dongdaegu) – Pohang | |
Honam KTX | HSR route | 40x/49x | 20–21 | (Haengsin) – Yongsan – Gwangmyeong – Gongju – Iksan – Gwangju-Songjeong – Mokpo |
via Seodaejeon | 47x/48x | 7 | (Gyeongbu HSR until Osong) – Seodaejeon – Gyeryong – Nonsan – Iksan (– Gimje – Mokpo / 2x daily) | |
Jeolla KTX | HSR route | 50x/54x | 12–14 | (Honam HSR route until Iksan) – Jeonju – Yeosu-Expo |
via Seodaejeon | 58x | 3–4 | (Honam route via Seodaejeon until Iksan) – Iksan – Jeonju (– Yeosu-Expo / 2x daily) | |
Jungang KTX | 70x | 7–8 | Cheongnyangni – Wonju – Jecheon – Yeongju – Andong | |
Gangneung KTX | Gyeonggang route | 80x/85x | 14–21 | (Seoul) – Cheongnyangni – Manjong – Pyeongchang – Jinbu – Gangneung |
Yeongdong route | 84x/88x | 4–7 | (Gyeonggang route until Jinbu) – Jeongdongjin – Donghae | |
Gyeongbu SRT | 3xx | 40 | Suseo – Daejeon – Dongdaegu – Ulsan – Busan | |
Honam SRT | 6xx | 20 | Suseo – Gongju – Iksan – Gwangju-Songjeong – Mokpo |
KTX services are grouped according to their route, and within the groups, the stopping pattern changes from train to train.<ref name="TTNov2010"/> KTX trains not deviating from the Seoul–Busan corridor are operated as the Gyeongbu KTX service.Template:Sfn In 2004, the new service cut the route length from Template:Convert,<ref name="TCI_overview2005"/> and the fastest trains, serving four stations only, cut the minimum Seoul–Busan travel time from the Saemaul's 4 hours 10 minutes to 2 hours 40 minutes.<ref name="overview"/> With the extension of the Gyeongbu HSR, from November 1, 2010, the minimum Seoul–Busan travel time reduced to 2 hours 18 minutes,<ref name="Korail-Nov2010">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> over a travel distance of Template:Convert.<ref name="KTXfare-Nov2010"/> From December 1, 2010, Korail added a pair of non-stop trains<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> with a travel time of 2 hours 8 minutes.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Once the sections across Daejeon and Daegu are completed, cutting the Seoul–Busan travel distance to Template:Convert,<ref name="han-phase2"/> plans foresee a further improvement of the four-stop travel time to 2 hours and 10 minutes.Template:Sfn
Because both KTX and conventional trains in South Korea share a rail gauge (unlike in Japan), KTX trains can run on both networks dramatically increasing the number of destinations served.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Some Gyeongbu KTX services use parts of the conventional line paralleling the high-speed line. From June 2007 until October 2010, some trains left the Gyeongbu HSR between Daejeon and Dongdaegu to serve Gimcheon and Gumi before the opening of an extra station for the two cities on the high-speed line.<ref name="GinGum">Template:Cite news</ref> From November 1, 2010, when most Gyeongbu KTX services began to use the new Daegu–Busan high-speed section, some trains remained on the Gyeongbu Line on that section, and additional trains began to use the Gyeongbu Line on the Seoul–Daejeon section to serve Suwon.<ref name="TTNov2010">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
KTX trains using the Gyeongbu HSR only from Seoul to Daejeon and continuing all along the Honam Line are operated as the Honam KTX service.Template:Sfn In 2004, the new service with a route length of Template:Convert between Yongsan in Seoul and MokpoTemplate:Sfn cut minimum travel time from 4 hours 42 minutes to 2 hours 58 minutes.<ref name="overview"/> By 2017, this time is to be cut further to 1 hours 46 minutes.Template:Sfn
On December 15, 2010, the new Gyeongjeon KTX service started<ref name="Korail-15Dec2010"/> with a minimum travel time of 2 hours 54 minutes<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> over the Template:Convert long route between Seoul and Masan.<ref name="KTXfare-Dec2010">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The service is to be extended to Jinju by 2012.<ref name="suseoannounce"/> A fourth line, the Jeolla KTX service will connect Seoul to Yeosu in 3 hours 7 minutes from September 2011.<ref>Template:Cite news</ref> From 2014, with the completion of the first phase of the Honam HSR, the travel time is reduced further to 2 hours 25 minutes.<ref name="KTX-2011">Template:Cite news</ref> From 2015, KTX trains are to reach Pohang from Seoul in 1 hour 50 minutes.<ref>Template:Cite news</ref>
Tickets and seatsEdit
Type of seatsEdit
KTX offers two classes: First Class and Standard Class. Tickets also specify whether a seat is forward-facing or backward-facing according to the direction of travel. First Class seats are arranged 2+1 across the train and Standard Class seats are configured 2+2. There are special reserved Family seats, which are grouped in four, including 2 forward-facing and 2 backward-facing seats. There are reserved seats and unassigned seats.<ref name="booking">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> KTX trains have no restaurant cars or bars, only seat service.<ref name="al1"/> From 2006, one car of selected KTX services functions as a moving cinema.<ref>Template:Cite news</ref>
Ticket pricesEdit
KTX fares were designed to be about halfway between those for conventional trains and airline tickets.Template:Sfn The fare system implemented at the start of service in April 2004 deviated from prices proportional with distance, to favour long-distance trips.Template:Sfn On April 25, 2005,<ref name="Korail_Apr2005">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> fares were selectively reduced for relations under-performing most.Template:Sfn
Service | Mon-Thu | Fri-Sat | |
---|---|---|---|
citation | CitationClass=web
}}</ref> |
51,800 won | 55,500 won |
KTX (via Miryang)<ref name="KTXfare-Nov2010"/> | 47,900 won | 51,200 won | |
KTX (via Suwon)<ref name="KTXfare-Nov2010"/> | 42,100 won | 45,000 won | |
citation | CitationClass=web
}}</ref> |
39,300 won | 41,100 won |
citation | CitationClass=web
}}</ref> |
26,500 won | 27,700 won |
From November 1, 2006, due to rising energy prices,<ref name="fares2006"/> Korail applied an 8-10% fare hike for various train services, including 9.5% for KTX.<ref name="donga-fares2006">Template:Cite news</ref> The price of a Seoul-Busan Standard Class ticket increased to 48,100 won.<ref name="fares2006">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> From July 1, 2007, KTX fares were hiked another 6.5%, while those for the slower Saemaeul and Mugunghwa services on the parallel conventional route were raised by 3.5 percent and 2.5 percent, respectively.<ref name="fares2007">Template:Cite news</ref> However, new reduced weekday and unassigned seat fares were also introduced.<ref name="fares2007"/>
After the November 1, 2010, start of service on the Daegu–Busan section of the Gyeongbu HSR, the fare for KTX trains using the new section was set about 8% higher than for the old route via Miryang, while that for the new services via Suwon was set lower.<ref name="Korail-Nov2010"/>
DiscountsEdit
Korail's standard discounts for children, disabled, seniors and groups apply on KTX trains, too.<ref name="KorailDiscounts">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> For frequent travellers, Korail's standard discount cards, which are categorised according to age group, apply with the double of the standard discount rates; while discount cards for business and government agency workers apply with the normal rate; both types of discounts are up to 30%.<ref name="KorailDiscounts"/> Season period tickets with discounts of up to 60% can also apply to KTX trains.<ref name="KorailDiscounts"/>
Discounts for family seats (37.5%) and backward facing seats (5%) are specific to the KTX.<ref name="KorailDiscounts"/> In addition to Korail's small general discounts for tickets purchased in a vending machine, via cell phone or the internet, discounts of 5–20% apply to a limited number of seats on KTX trains when purchased in advance.<ref name="KorailDiscounts"/> For travellers who transfer to other long-distance trains towards destinations beyond KTX stops, transfer tickets with 30% discount apply.<ref name="KorailDiscounts"/> Korail pays a refund for late KTX trains, which reaches 100% for trains with a delay above one hour.<ref name="irjJan2007"/>
Korea Rail Pass, a period ticket Korail offers to foreigners, also applies to KTX.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite news</ref> For passengers using the Korea-Japan Joint Rail Pass, a joint offer of Korail, Japanese railways and ferry services, the discount on KTX trains is 30%.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Passenger numbers and usageEdit
ForecastsEdit
Forecast made in... |
KTX opening year ridership forecast in passengers/day<ref name="irail_2004">Template:Cite journal</ref> | |||
---|---|---|---|---|
Gyeongbu | Honam | Total | ||
1991 | 196,402 | - | 196,402 | |
1995 | 190,203 | - | 190,203 | |
Dec 1998 Nov 1999 |
141,497 |
22,818 |
164,315 | |
Aug 2003 | 115,828 | 36,085 | 151,913 |
When the project was launched, KTX was expected to become one of the world's busiest high-speed lines. The first study in 1991 forecast around 200,000 passengers a day in the first year of operation, growing to 330,000 passengers a day twelve years later.<ref name="irjJan2007">Template:Cite journal</ref> In forecasts prepared after the decision to split the project into two phases, the expected first year ridership of Gyeongbu KTX services was reduced by about 40%. With the estimate for the Honam KTX services added to the plan, opening year forecasts ranged between 150,000 and 175,000 passengers a day.<ref name="irail_2004"/>Template:Sfn Actual initial ridership after the opening of the first phase in 2004 was well short of initial expectations at around half of the final forecast.Template:Sfn<ref name="tciexpect">Template:Cite news</ref>
In October 2010, before the opening of the second phase, Korail expected ridership to rise from the then current 106,000 to 135,000 passengers a day.<ref>Template:Cite news</ref>
Ridership evolutionEdit
KTX was introduced on 1 April 2004. In the first 100 days, daily passenger numbers averaged 70,250, generating an operational revenue of about 2.11 billion won per day, 54% of what was expected.<ref name="tciexpect"/> On January 14, 2005, Prime Minister Lee Hae Chan stated that "the launch of KTX was a classic policy failure" due to construction costs significantly above and passenger numbers well below forecasts.<ref>Template:Cite news</ref> However, ridership increased by over a third on the Gyeongbu KTX and over a half on the Honam KTX in two years.Template:Sfn Financial break-even was forecast at a ridership level of around 100,000 passengers a day, which was expected by the end of 2006.<ref>Template:Cite news</ref>
The 100 millionth rider was carried after 1116 days of operation on April 22, 2007, when cumulative income stood at 2.78 trillion won.<ref name="100mill_kr">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> KTX finances moved into the black in 2007.<ref>Template:Cite news</ref> The next year, with revenues equal to US$898 million and costs equal to US$654 million, KTX was Korail's most profitable branch.<ref name="KOTI2010">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
By the sixth anniversary in April 2010, KTX trains travelled a total 122.15 million kilometres, carrying 211.01 million passengers.<ref name="Sixyear">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Punctuality gradually improved from 86.7% of trains arriving within 5 minutes of schedule in 2004<ref name="5years">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> to 98.3% in 2009.<ref name="Sixyear"/> In 2009, the average daily ridership was 102,700.<ref name="Sixyear"/> As of April 2010, the single-day ridership record stood at 178,584 passengers, achieved on January 26, 2009, the Korean New Year.<ref name="5years"/>
By the tenth anniversary KTX had travelled a total 240 million kilometres, carrying 414 million passengers.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Edit
Template:Multiple image The introduction of high-speed services had the strongest effect on long-distance relations with a significant portion of the journey on the high-speed line, like Seoul–Busan: KTX took both the majority of the market and the bulk of rail passengers in the first year already, increasing the total share of rail from around two-fifths to a market dominating two-thirds by 2008. On long-distance relations with significant distances along conventional lines and resulting more modest travel time gains, that is along the Honam Line, the KTX and overall rail market share gain decreases with distance. On medium-distance relations like Seoul–Daejeon, KTX gained market share mostly at the expense of normal rail express services and air traffic, and helped to increase the total share of rail. On short-distance intercity relations line Seoul–Cheonan, due to the modest gains in time and the location of KTX stops outside city cores, KTX gains were at the expense of conventional rail, while intercity rail's modal share was little changed.<ref name="5years"/>Template:Sfn
By 2007, provincial airports suffered from deficits after a drop in the number of passengers attributed to the KTX.<ref name="ProvAirport2007">Template:Cite news</ref> With lower ticket prices, by 2008, KTX has swallowed up around half of the airlines' previous demand between Seoul and Busan (falling from 5.3 million passengers in 2003 to 2.4 million).<ref>Template:Cite news</ref> Though some low-cost carriers failed and withdrew from the route, others still planned to enter competition even at the end of 2008.<ref>Template:Cite news</ref> Budget airlines achieved a 5.6% growth in August 2009 over the same month a year earlier while KTX ridership decreased by 1.3%, a trend change credited to the opening of Seoul Subway Line 9, which improved Gimpo International Airport's connection to southern Seoul.<ref>Template:Cite news</ref>
In the first two months after the launch of the second phase of the Gyeongbu HSR, passenger numbers on flights between Gimpo and Ulsan Airports dropped 35.4% compared to the same period a year earlier, those between Gimpo and Pohang Airports 13.2%.<ref name="tci-p2air">Template:Cite news</ref> Between Gimpo Airport and Busan's Gimhae International Airport, airline passenger numbers remained stable (+0.2%), as a consequence of a budget airline competing with large discounts and aggressive marketing.<ref name="tci-p2air"/> In the first month of Gyeongjeon KTX service, express bus services between Seoul and Masan or Changwon experienced 30–40% drops in ridership.<ref>Template:Cite news</ref>
Technical and operational issuesEdit
State of infrastructureEdit
Lawmakers criticised the safety of Korail's tunnels after the Ministry of Construction and Transportation submitted data to the National Assembly on June 13, 2005. The ministry added fire prevention standards to high-speed line design standards only in November 2003, thus they weren't applied to the by then finished tunnels of the first phase of KTX. Consequently, few tunnels had emergency exits, and in high-speed railway tunnels, the average walking distance in case of an emergency was Template:Convert, with a maximum of Template:Convert, against a norm of emergency exits every Template:Convert in other countries.<ref>Template:Cite news</ref> A contingency plan for fires in KTX tunnels was incorporated into a national disaster manual in November 2005.<ref>Template:Cite news</ref>
On October 5, 2008, it was revealed by lawmakers that inside Hwanghak Tunnel, from December 2004, inspectors have monitored the progression of several cracks and minor track displacements, which continued after maintenance work in March–April 2007 and again in March 2008.<ref name="hwanghak-problem">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The operator claimed that a February 2007 on-site inspection found the problems not safety-relevant, but pledged further maintenance, and an investigation into the causes was launched.<ref name="hwanghak-action">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Tunnel reinforcement was under way in 2010.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Incidents and accidentsEdit
Operation irregularities mostly concerned the rolling stock, but also signalling, power glitches and track problems.Template:Sfn The number of incidents decreased from 28 in the first month to 8 in the fifth.Template:Sfn The failure rate decreased sharply by the fifth year of operation.<ref name="5years"/> Later, in the first eight months of regular service until October 2010, KTX-II trains broke down 12 times.<ref>Template:Cite news</ref> Causes for breakdowns in the first years of operation involved inexperienced staff and insufficient inspection during maintenance.<ref>Template:Cite news</ref><ref>Template:Cite news</ref>
Lawmakers from the Grand National Party published an investigation in October 2006 and expressed concern about the practice to use parts from other trains for spare parts,<ref name="pbj_parts">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> but Korail stated that that is standard practice in case of urgency with no safety effect, and the supply of spare parts is secured.<ref name="parts-repl-ok">{{#invoke:citation/CS1|citation |CitationClass=web }}Template:Dead link</ref> Korail is also conducting a localisation program to develop replacements for two dozen imported parts.<ref name="5years"/>
On June 13, 2007, near Cheongdo on the upgraded Daegu–Busan section, a damper acting between two cars of a KTX train got free at one end due to a loose screw and hit the trackbed, throwing up ballast that hit cars and caused bruises to two people on the parallel road, until the train was stopped when passengers noticed smoke.<ref name="ballastthrow">{{#invoke:citation/CS1|citation |CitationClass=web }}Template:Dead link</ref>
On November 3, 2007, an arriving KTX-I train collided with a parked KTX-I train inside Busan Station, resulting in material damage<ref name="head-on-collision">Template:Cite news</ref> of 10 billion won<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> and light injuries to two persons.<ref name="collision-union"/> The accident happened because the driver had fallen asleep and disabled the train protection system,<ref name="driverasleep">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> and led to the trial and conviction of the driver.<ref>Template:Cite news</ref> The railway union criticised single driver operation in conjunction with the two and a half hours rest time the driver had between shifts.<ref name="collision-union">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
On February 11, 2011, a KTX-Sancheon train<ref name="kt-derail"/> bound for Seoul from Busan derailed on a switch in a tunnel Template:Convert before Gwangmyeong Station,<ref name="jd-nut">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> when travelling at around Template:Convert.<ref name="tci-gm-acc">Template:Cite news</ref> No casualties were reported, only one passenger suffered slight injury, but KTX traffic was blocked for 29 hours while repairs were completed.<ref name="kt-derail">Template:Cite news</ref> Preliminary investigation indicated that the accident resulted from a series of human errors.<ref name="jd-nut"/> Because workers improperly repaired a point along the tracks.<ref name="dera"/> Investigators found that the derailment was caused by a switch malfunction triggered by a loose nut from track, and suspected that a repairman failed to tighten it during maintenance the previous night.<ref name="jd-nut"/> The switch's detectors signalled a problem earlier, however, a second maintenance crew failed to find the loose nut and didn't properly communicate the fact to the control center, which then allowed the train on the track.<ref name="jd-nut"/> The rail union criticised Korail's use of hired repairmen.<ref name="jd-nut"/> there were no problems with the train according to investigation.<ref name="dera">Template:Cite news</ref>
On July 15, 2011, 150 passengers were evacuated from a train when smoke started coming out of the train when it arrived at Miryang station at 11:30 AM.<ref name="3dis">Template:Cite news</ref> On July 17, 2011, at around 11 AM, a train stopped abruptly and stranded some 400 passengers in the Template:Convert Hwanghak Tunnel for over an hour.<ref name="3dis" /><ref>Template:Cite news</ref> The train resumed service after emergency repairs to a malfunctioning motor.<ref>Template:Cite news</ref> A Korail spokesperson stated that the reason for the stop was due to "faults in the motor block that supplies power to the wheels". The same day, the air conditioning broke down on another train leaving Busan at 1:45 PM. Over 800 passengers were transferred to another train at Daejeon when the problem could not be fixed.<ref name="3dis" />
On December 7, 2018, a KTX train carrying 198 passengers derailed about five minutes after leaving Gangneung for Seoul injuring 15 passengers. The train was traveling at about 103 km/h when almost all of its cars left the rails.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
On January 5, 2022, a KTX-Sancheon train bound for Busan from Seoul carrying 303 passengers and crew derailed at 12:58 PM while passing a tunnel in Yeongdong of North Chungcheong Province, about 215 kilometers south of Seoul, injuring 7 passengers.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The train was traveling at about 200 km/h when it partially derailed, resulting in a bogie wheel from car number 4 running off the track before being violently ejected from the train, throwing up ballast and causing structural damage to train cars.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Subsequent KTX traffic was rerouted via the standard line, resulting in severe delays.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Initially, it was believed that the derailment was caused by the train colliding with debris while passing Yeongdong Tunnel. However, evidence gathered from further investigation show that the missing bogie wheel was found inside Otan Tunnel, which is about 4 km before Yeongdong Tunnel, leading the investigating team to believe the train derailed due to faults within the wheel bogie assembly rather than from impact with debris.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Passenger comfort and convenienceEdit
Template:Multiple image Passenger surveys in the first months found that the limited capacity of bus connections<ref name="complaints">Template:Cite news</ref> and the lack of subway connections for intermediate stations, especially the newly built stations Gwangmyeong and Cheonan-Asan, was the problem mentioned most often.Template:Sfn A better connection to Cheonan-Asan Station was provided by an extension of Seoul Subway Line 1 along the Janghang Line, opened on December 14, 2008.<ref>Template:Cite news</ref> Gwangmyeong Station was linked to the same subway line by a shuttle service on December 15, 2006, but it made little impact<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}Template:Dead link</ref> due to the longtime differences between KTX and subway train schedules.<ref>Template:Cite news</ref>
The noise level in the trains during tunnel passages was also subject to passenger complaints.<ref name="mudflaps"/> This was referred to as a tunnel effect; it referred to both noise and vibration of the train when traveling through two specific tunnels.<ref name="dx.doi.org">Lee, J., Jin, B., & Ji, Y. (2009). Development of a Structural Equation Model for ride comfort of the Korean high-speed railway. International Journal of Industrial Ergonomics, 39(1), 7–14. https://dx.doi.org/10.1016/j.ergon.2008.09.003</ref> The tunnel effect was specifically noted as a reason for passenger dissatisfaction.<ref name="Lee, J. 2009">Lee, J., Jin, B., Ji, Y., & Yun, M. (2009). Cultural differences in conceptual models of ride comfort for high-speed trains. Human Factors and Ergonomics in Manufacturing, 19(2), 128–144. https://dx.doi.org/10.1002/hfm.20141</ref> Sound waves that are generally dispersed in an open environment are reflected against the tunnel walls, which causes the sound waves to come in contact with the passenger cabin and produces noise.<ref name="Choi, S. 2004">Choi, S., Lee, C., Kim, J., & Cho, J. (2004). Interior Noise of a Korean High-Speed Train in Tunnels. Proceedings of the Annual Conference of the Australian Acoustical Society, 2004. 415-416. Template:ISBN; ISSN 1446-0998.</ref>
A reduction by 3–4 dB was achieved by retrofitting all trains with longer mud flaps at car ends until May 2006 to smooth the airflow at the articulated car joints.<ref name="mudflaps">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> However, measurements in 2009 found significantly higher interior noise levels at some locations in two tunnels.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Window thickness and sound insulation was improved in the KTX-II.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}Template:Dead link</ref> The rails for high-speed trains like the KTX are welded together via a special techniques that make the rail a solid continuous rail; this method reduces the noise volume, which is produced by the wheels' contact with the rail, but it is not eliminated.<ref name="Choi, S. 2004"/>
The isolation of KTX-I trains against pressure variations during tunnel passages<ref name="al1"/> was insufficient for some passengers,Template:Sfn leading to efforts to reinforce pressurization in newer generations of trains.<ref name="jrtr-ng"/> Pressure variations have been known to cause passengers to experience ringing in their ears; the ventilation systems on the passenger cabins are sealed when the train enters a tunnel in order to reduce the pressure changes.<ref name="Choi, S. 2004"/> Pressure variations were not the only train cabin-associated complaint; KTX passengers were also known to have been negatively affected by inconsistent speeds of the trains.<ref name="dx.doi.org"/>
Some KTX passengers found high-speed travel in backwards facing seats dizzying.<ref name="complaints"/>Template:Sfn Along with dizziness, feelings of nausea, headache, and sleepiness could also be experienced.<ref name="dx.doi.org"/> Motion sickness was also noted as having had a minimal effect on KTX passengers; however, it still made an impact on passenger ride comfort.<ref name="dx.doi.org"/> When the original seats were selected for the KTX trains, the anthropometry of the main consumers, who were largely expected to be Korean, were not considered.<ref name="dx.doi.org"/> The seat design was found to have a significant effect on how passengers on the KTX trains rated the experience of their trip. Among the various factors that were considered to be vectors of discomfort were the angle of joints and specific areas of pressure, which were discovered to be present after an analysis of questionnaires that were completed by recent passengers.<ref name="dx.doi.org"/> The factors of the seats of concern to KTX passengers were the shape, pitch, width, and the amount of legroom between the rows of seats.<ref name="Lee, J. 2009"/> Swivel seats, which can be turned into the direction of travel, installed only on First Class in KTX-I trains,<ref name="al1"/> were made standard on both classes on newer generations of trains.<ref name="5yearJoong">Template:Cite news</ref>
Studies have shown that term "ride comfort" has been used as an all-encompassing term for the KTX passengers' over all experience on the trains.<ref name="dx.doi.org"/> While the KTX train is based on the French TGV model, it is considered to be more comfortable.<ref name="Lee, J. 2009"/> The passengers' overall experience with regards to over-all ride comfort has been looked at as a combination of their physical health and emotional state.<ref name="dx.doi.org"/> Fares were not included in the aforementioned questionnaires on ride comfort as there were variations in pricing due to seat arrangement, as well as weekday/weekend rates.<ref name="dx.doi.org"/>
See alsoEdit
- SRT
- High-speed rail in South Korea
- ITX-Saemaeul
- ITX-Maum
- Mugunghwa-ho
- Nuriro
- Rail transport in South Korea
- Transport in South Korea
- Train to Busan, a horror film in which the KTX and its train feature heavily in the plot
ReferencesEdit
- Citations
- Bibliography
External linksEdit
Template:Sister project Template:Wikivoyage
Template:Korail passenger train services Template:Korail Lines Template:KTX lines and services Template:High-speed rail Template:Authority control