Template:Short description Template:Use dmy dates Template:Use British English Template:Heritage Railway Template:Llangollen Railway diagram The Llangollen Railway (Template:Langx) is a volunteer-run heritage railway in Denbighshire, North Wales, which operates between Llangollen and Corwen. The standard gauge line, which is Template:Convert long, runs on part of the former Ruabon – Barmouth GWR route that closed in 1965. It operates daily services in the summer as well as weekends throughout the winter months, using a variety of mainly ex-GWR steam locomotives as well as several diesel engines and diesel multiple units. A Template:Convert extension of the railway has been built to complete the line to Corwen.<ref name="guide">Template:Citation</ref>

In March 2021, the railway company announced that, having made a loss in three consecutive years, they had invited their bank to appoint receivers.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Operation of the railway was handed over to the Llangollen Railway Trust, and the line reopened July 2021.<ref name="railadvent">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

HistoryEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}

Commercial service: 1865–1962Edit

Llangollen was already a popular place for tourists by the 1840s. Travel up to this time had been by horse-drawn carriage, but by the 1840s, the Shrewsbury to Chester line had been completed, which allowed passengers to alight at Template:Stnlnk (later known as Whitehurst Halt), and then take a coach towards Holyhead.<ref>Clinker, C.R., (1979) GWR Register of Halts & Platforms, Avon Anglia Template:ISBN</ref>

However, the commercial development of the local mining industry meant that the development of a railway became essential to the region's economic development. A number of schemes were proposed, including one by the LNWR, but it was not until 1 August 1859 that a scheme engineered by Henry Robertson received Royal Assent. The Template:Convert Vale of Llangollen Railway left the Shrewsbury to Chester main line Template:Convert south of Template:Stnlnk, and proceeded as a single track line on a double track route via Template:Stnlnk to the new station at Llangollen. The line opened to freight on 1 December 1861 and to passengers on 2 June 1862 at a temporary terminus on the town's eastern outskirts.<ref name="hist1">Template:Citation</ref>

The extension to Template:Stnlnk was undertaken by the associated but separate Llangollen and Corwen Railway company, and involved constructing a long tunnel under the Berwyn Mountains. It, together with the new centrally positioned and larger station in Llangollen, opened for service on 1 May 1865.<ref name="hist1"/>

ClosureEdit

Designated for closure under the Beeching cuts, the railway closed to passenger services on Monday 18 January 1965.<ref name="Butt146"/> The section between Ruabon and Llangollen Goods Yard remained open for freight traffic until April 1968, but immediately after the cessation of operations the track was removed from the whole line between Ruabon and Barmouth.<ref name="Butt146">Butt (1995), page 146</ref>

PreservationEdit

Reopening: 1972–1975Edit

The Flint and Deeside Railway Preservation Society was founded in 1972 with the aim of re-opening a closed railway. At first, the society was interested in the Dyserth to Prestatyn line, but that line was deemed unsuitable because a small amount of freight traffic was still using it.<ref>Template:Citation</ref> The society moved its attention to the Llangollen to Corwen section of the Ruabon to Barmouth line. The local council granted a lease of the Llangollen railway station building and Template:Convert of track to the society, with the hope that the railway would improve the local economy and bring more tourists to Llangollen. The station reopened on 13 September 1975, with just Template:Convert of track.<ref name="guide"/>

Rebuilding and resurrection: 1975–1996Edit

Early progress was slow due to a lack of funding, though in 1977 Shell Oil donated a mile of unused track. Volunteers started laying the track with the aim of reaching Pentrefelin, Template:Convert from Llangollen. Work finished in July 1981 with the remaining quarter mile of track used to lay sidings at the old Llangollen Goods Junction to house the railway's growing fleet of rolling stock.

The working railway attracted the interest of many private companies. The local council renewed the lease of the land to the railway for a further 21 years. The Llangollen Railway Trust was donated significant amounts of track, allowing the next extension of the line to Template:Rws. This involved a £30,000 refurbishment by the local council of the Dee Bridge, which had fallen into disrepair since the commercial closure of the line. The first trains operated over the newly extended 1.75 mile (2.8 km) line to Berwyn in March 1986.<ref name="guide"/> As rebuilding work progressed train services were extended (via the 689 yard long Berwyn Tunnel) to Deeside Halt (in 1990), Glyndyfrdwy (in 1993) and finally into Carrog on 2 May 1996.

Extension to CorwenEdit

File:Llangollen-railway-3802.jpg
GWR 2884 Class number 3802 pulling a goods train during the Llangollen Railway steam gala weekend in 2011.

In 2011, work (including reconstruction work) started on the Template:Convert section of track past the site of the closed Template:Stnlnk to Corwen. Because the former Corwen railway station site has been in private use as an Ifor Williams Trailers showroom since 1990, and the track bed in between is sub-divided, a temporary station was built on the eastern side of the town.

The first stage of the project was completed in late 2014, with special trains running on 22 October 2014 to the new station at Template:Stnlnk for those who had contributed to the project. Regular passenger services to Corwen East started on 27 October 2014. The official opening, on 1 March 2015, was marked by a special train.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The final stage at Corwen to a new station with permanent facilities and a run round loop opened on 2 June 2023.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> It is uncertain if the trust can extend eastwards towards Ruabon or westwards to Cynwyd as the trackbed was not fully safeguarded against modern development.

Financial issues and receivershipEdit

In March 2020, the railway announced that a financial crisis had been averted due to £125,000 in donations from supporters, enabling it to avoid a Company Voluntary Arrangement after making pre-tax losses of £330,601 in 2018, £329,175 in 2019 and £258,804 in 2020.<ref>Financial crisis at Llangollen Railway averted thanks to substantial cash donations from supporters www.dailypost.co.uk, accessed 17 April 2021</ref><ref>£125k donations help Llangollen Railway avoid financial crisis www.denbighshirefreepress.co.uk, accessed 17 April 2021</ref><ref>"Great regret" as Llangollen Railway to enter receivership 2 March 2021 www.deeside.com, accessed 17 April 2021</ref> In April 2020 the company announced that it was at risk of closure due to the effects of the COVID-19 pandemic, which forced the cancellation of services.<ref>SOS: Llangollen Railway warns it’s at risk of closure 14 April 2020 www.therailwayhub.co.uk, accessed 17 April 2021</ref> In May 2020, Prime Minister Boris Johnson stated that the line would have a "glorious future" after raising £75,000 in share purchases and donations.<ref>Boris Johnson predicts "glorious future" for Llangollen Railway 13 May 2020 www.therailwayhub.co.uk, accessed 17 April 2021</ref>

The line was awarded £161,000 from the National Lottery Heritage Fund in August 2020 to help deal with financial pressures caused by the closure of the line,<ref>Llangollen Railway receives £161k National Lottery Heritage fund 28 August 2020 www.therailwayhub.co.uk, accessed 17 April 2021</ref> but then had to launch an emergency appeal for funds in November 2020, when urgent repairs were found to be required on the Dee Bridge.<ref>Urgent repairs needed to Dee Bridge on the line of Llangollen Railway 2 November 2020 www.leaderlive.co.uk, accessed 17 April 2021</ref> In December 2020 the line reported that the extension to Corwen was still progressing, despite the pandemic making funding an issue.<ref>Corwen railway station still on track despite pandemic 7 December 2020 www.denbighshirefreepress.co.uk, accessed 17 April 2021</ref>

On 1 March 2021, the Llangollen Railway PLC announced that it was going into receivership, with debts of about £350,000 and "no prospect" of meeting its liabilities.<ref>Llangollen heritage railway operator goes into receivership 1 March 2021 www.bbc.co.uk, accessed 17 April 2021</ref> Operation of the railway was handed over to the Llangollen Railway Trust, and the line reopened in July 2021.<ref name="railadvent"/>

Locomotives and rolling stockEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} As of August 2021, many services are operated by 1950s-built diesel multiple units, offering a splendid view of the local scenery. At that time, there was only one operational steam locomotive based on the line: former GWR 2-8-0 No.3802.

See alsoEdit

ReferencesEdit

Template:Reflist

Further readingEdit

External linksEdit

Template:Sister project

Template:Heritage railways in Wales