Template:Short description Template:Good article Template:Use dmy dates Template:Infobox rail line Template:Marshlink Line RDT The Marshlink line is a railway line in South East England. It runs from Ashford, Kent via Romney Marsh, Rye and the Ore Tunnel to Hastings where it connects to the East Coastway line towards Eastbourne and Brighton.

The line was constructed by the South Eastern Railway (SER) in the late 1840s as a priority for military traffic. The SER clashed with the rival London, Brighton and South Coast Railway, leading to disputes over the route, planning and operation. After delays, the line opened in February 1851, followed by branch lines to Rye Harbour in 1854, Dungeness in 1881 and New Romney in 1884. The line struggled to be profitable and it seemed likely that it would close as recommended by the Beeching Report. All branch lines were closed to passengers by 1967 but the main line was kept open because of poor road connections in the area, and the branch to Dungeness remained open for freight. Though the line has been partially single-tracked and was slow to be modernised, it has survived into the 21st century.

The Marshlink line is one of the few in South East England that has not been electrified, despite regular proposals to do so, and uses British Rail Class 171 DMUs.

NameEdit

The name "Marshlink" was first used in the 1970s by the Southern region of British Rail in an attempt to improve marketing. Some trains had the name painted on the side. The line from Template:Rws to Template:Rws was branded the "1066 line" at the same time.Template:Sfn

RouteEdit

The line starts at Template:Rws, a major interchange in Kent connecting it to High Speed 1 and the South Eastern Main Line. Services run southwards from Platforms 1 and 2. Following a brief section of single-track immediately after a branch from the South Eastern Main Line, the line is then double-track. After Template:Convert, it descends on a Template:Railway gradient gradient towards Template:Rws (previously Ham Street & Orlsetone), crossing the Royal Military Canal and entering Romney Marsh towards Template:Rws.Template:SfnTemplate:SfnTemplate:Efn The next 13 miles through Romney Marsh and the Brede Valley are level track, aside from a handful of river crossings.Template:Sfn

South of Appledore, a freight-only branch line diverges to serve Dungeness nuclear power station. The branch originally served New Romney, Template:Rws, Template:Rws, Template:Rws, Template:Rws, Template:Rws and Dungeness.Template:SfnTemplate:Sfn

Beyond Appledore, the line reduces to single-track and crosses the River Rother to Template:Rws where there is a disused branch to Rye Harbour.Template:Sfn The mainline continues to Template:Rws along the Brede Valley, then climbs uphill at Template:Railway gradient.Template:Sfn It passes through the former Template:Rws (closed in 1959),Template:Sfn Template:Rws and Template:Rws before entering the Template:Convert Ore Tunnel.Template:Sfn

After the tunnel, the line is double-track and electrified (originally for access to the carriage sidings at Ore but since their removal the lines are used by scheduled trains). After Template:Rws, the line enters the Template:Convert Mount Pleasant Tunnel before a Template:Railway gradient descent towards Hastings.Template:SfnTemplate:Sfn From here, the track becomes the East Coastway line.Template:Sfn Throughout, the line does not follow any particular main vehicle route.Template:Sfn

ServicesEdit

File:Doleham railway station 1.jpg
Doleham railway station has a very limited service on the Marshlink line.

Passenger services are operated by Southern,<ref>Template:Cite magazine</ref> while freight services to Dungeness are run by Direct Rail Services.<ref>Template:Cite magazine</ref> Trains run hourly between Ashford International and Hastings, stopping at Ham Street, Appledore, Rye, Winchelsea and Three Oaks.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The latter two stations were served every two hours alternately until a timetable upgrade in May 2023.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Doleham (between Winchelsea and Three Oaks) is served by just three or four trains per day each way.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Trains then stop at Ore and Hastings before continuing on the East Coastway line towards Template:Rws.<ref name="eastbourneherald.co.uk">Template:Cite news</ref><ref name="sussexexpress.co.uk">Template:Cite news</ref> Ore station, in addition to Ashford-Eastbourne services, receives services to Brighton and London (hourly to each), which start or terminate there.<ref name=377s>Template:Cite news</ref>

Ham Street, Appledore and Rye have staggered platforms; passengers could originally cross the line between them, but this was disallowed for safety reasons.<ref>Template:Cite magazine</ref>Template:Efn Platforms at Three Oaks and Doleham can only accommodate a single carriage and passengers wishing to alight must travel in a particular carriage of the train.<ref name=rus>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

HistoryEdit

ConstructionEdit

File:171 725 Marshlink line.jpg
The Marshlink line passing through countryside near Template:Rws

The line was proposed by the Brighton, Lewes and Hastings Railway (BLHR), founded in June 1844 to construct a link between those three towns in association with the London and Brighton Railway (LBR). The South Eastern Railway (SER) wanted to construct a line between Headcorn, Rye and Hastings, but the Parliamentary Select Committee thought there would be insufficient traffic. After an Act of Parliament was passed to construct the Brighton–Hastings line (now the East Coastway line), the LBR thought it would be useful to extend it towards Rye and Ashford, an area otherwise dominated by SER plans.Template:Sfn The SER conducted their own survey from Ashford to Rye in the hope that they would be allowed to construct and own the line instead.Template:Sfn

During the 1844–45 parliamentary session, the Board of Trade decided to approve the BLHR's plans. The SER were unhappy about this arrangement and during the summer of 1845 abandoned their Headcorn–Rye–Hastings scheme, focusing on Hastings–Rye–Ashford instead.Template:Sfn The two companies reached a compromise, by which the BLHR were authorised to build the line from Hastings to Ashford, with a caveat that the SER could take over operation if they wished. The proposed line passed through countryside with only Rye as a significant settlement, so the SER easily persuaded the BLHR to hand over construction rights.Template:Sfn

Parliament deemed that the line was of strategic military importance and ordered that it was to be completed before the extension of the Hastings line from Tunbridge Wells to Hastings.Template:SfnTemplate:Sfn As part of the contract, the SER had to pay £10,000 towards refurbishing Rye Harbour, and took responsibility for drainage of the Royal Military Canal which ran close to the line along Romney Marsh.Template:Sfn

On 27 July 1846, the LBR and BLHR amalgamated with several other lines to form the London, Brighton and South Coast Railway (LB&SCR).Template:SfnTemplate:Sfn They became rivals with the SER and complained about a lack of progress.Template:Sfn The SER were unhappy about the proposed line from Rye to Hastings via Ore, which they viewed as too expensive compared to the alternative route via Whatlington. The LB&SCR objected to this route as it was longer, and consequently the SER dropped their proposals that November.Template:Sfn

In July 1847, George Robert Stephenson designed a bridge across the Royal Military Canal near Warehorne, while Peter W. Barlow designed a swing bridge over the Rother at Rye. However, the specific route continued to be debated by the SER throughout early 1848.Template:Sfn Work from the Ashford–Rye section started in earnest that summer, but subsequent heavy rain slowed construction. Workers propped the line up with hand spikes to prevent rails sinking, and test trains heeled over in the wind.Template:Sfn The line was planned as single-track, though this was changed to double-track in June 1850.Template:Sfn

The line was planned to be opened on 28 October 1850 by Thomas Farncombe, Lord Mayor of London, who inserted the last brick in both the Ore and Mount Pleasant tunnels. Work on the line was not complete owing to a lack of locally available ballast, so the full ceremony was postponed.Template:Sfn<ref>Template:Cite newsTemplate:Subscription required</ref> The opening date was moved to 1 January 1851, but this was cancelled following signalling problems.Template:Sfn The line eventually opened on 13 February 1851, though this was hampered by the rivalries between the companies. The SER blocked LB&SCR trains entering Hastings, not recognising them as the legal successors to the BLH.Template:Sfn After a court case the two companies agreed to share the station's facilities for both lines.Template:SfnTemplate:Efn Even after opening, there were complaints in early 1852 that the line was not completely finished, and it was still marked "nearly complete" in March 1853.Template:Sfn The dispute between the SER and the LB&SCR was not fully resolved until 5 December 1870, when the former was allowed to run trains to Template:Rws.Template:Sfn

The railway opened with four intermediate stations between Ashford and Hastings at Ham Street, Appledore, Rye and Winchelsea.Template:Sfn There were almost no other places of significance along the line.Template:Sfn Some stations were not near the settlement they served; for example, Appledore station is around Template:Convert from the village itself.Template:Sfn Four trains per day ran each way on the line, reducing to two on Sundays.Template:Sfn Few changes were made to the railway during the 19th century, aside from minor signalling work and some additional buildings.Template:Sfn It was not declared profitable by the SER until 1895.Template:Sfn

To make money and boost traffic on the line, the SER agreed to hold unlicensed boxing matches on Romney Marsh. On 29 January 1856, a special train ran from Template:Rws to Appledore for a prize fight between Tom Sayers and Harry Poulson. Sayers won the fight, which was reportedly rigged by the SER for £1,000. The company was accused of "aiding and abetting a breach of the peace".Template:Sfn

Branches from RyeEdit

In 1846, a short branch was proposed from Rye station towards Rye Harbour. It was Template:Convert long and only used for freight, ending by the River Rother at a pier.Template:Sfn The line opened in March 1854.Template:Sfn It was almost derelict by 1955, and closed on 29 January 1960.Template:SfnTemplate:Sfn

The Rye and Camber Tramway was a separate Template:Convert gauge line the other side of the river. It was proposed in 1895 with an initial budget of £2,800.Template:Sfn A Template:Convert section from Rye to Golf Links Halt opened on 13 July 1895, followed by a Template:Convert extension to Camber Sands, opening on 13 July 1908. The line was closed in 1939 following competition from bus services and was temporarily part-converted to road during the war. It was returned to railway after hostilities ended, but the line was impractical to repair to full use and hence closed permanently.Template:Sfn

In 1901, the East Sussex Light Railway proposed a connection from Template:Rws on the Kent and East Sussex Railway to Rye. The SECR objected, and it was abandoned.Template:Sfn

Branch to Dungeness and New RomneyEdit

File:Footpath crosses a dismantled railway near Lade (geograph 2248026).jpg
An obsolete stile over the former 1937 realignment of the line from Lydd to New Romney, closed since 1967

The SER had tenuous plans to build a cross-channel passenger ferry terminal at Dungeness, which would provide a dedicated route from London to Paris.Template:Sfn In 1859, the Town Clerk of New Romney suggested a line should be built from Folkestone to Rye via Dymchurch and Lydd, but the SER was not interested. However, in 1866 they became favourable about a branch line from Appledore, as it could support their international train proposals. An Act of Parliament to build the line was obtained on 30 July that year, which included a branch to Denge Beach. On 5 August 1873, the SER were authorised to extend the line to Dungeness with a Template:Convert pier and landing stage. Progress stalled on the line in the 1870s and the SER were in danger of a rival railway taking over construction.Template:Sfn

Template:Infobox UK legislation Template:Infobox UK legislation Template:Infobox UK legislation Template:Infobox UK legislation The development of the artillery range at Lydd increased the potential for traffic, so the newly formed Template:Visible anchor proposed their own bill to work on the Appledore–Lydd branch line, which was passed as the Template:Visible anchor (44 & 45 Vict. c. v). The Lydd Railway Company was promoted by Robert William Perks. Construction began on 8 April 1881, with Thomas Andrew Walker as the Contractor for the work, and the line opened to Dungeness on 7 December that year.Template:Efn Most trains ran through to Ashford, though a few services terminated at Appledore.Template:Sfn An act for the northward branch to New Romney was granted on 24 July 1882, the line opening on 19 June 1884.Template:SfnTemplate:Sfn The line was not a financial success, and the Lydd Railway was absorbed into the SER in 1895.Template:Sfn

By the early 20th century, trains were running direct from Charing Cross to New Romney via Ashford and Appledore on summer Sundays.Template:Sfn The branch line became important during World War I, when camps were established on the shingle wasteland between Lydd and Dungeness. During this time, the line catered for both infantry and horse traffic.Template:Sfn A passing loop past Appledore was removed in 1920. At the New Romney end, one of the sidings adjoining the station was extended to serve the Romney, Hythe and Dymchurch Railway.Template:Sfn

The line was realigned to be closer to the coast in the 1930s, to attract holiday traffic along the coast between Dungeness and New Romney. The rerouted line opened on 4 July 1937, and included new stations at Lydd-on-Sea and Greatstone-on-Sea.Template:Sfn At the same time, the branch to Dungeness was closed to passengers.Template:Sfn By 1952, nine trains a day were serving New Romney from Appledore, with two further through trains from Ashford. After electrification of the South East main line in 1962, direct services from Charing Cross were discontinued, and the remaining services were run on diesel-electric stock.Template:Sfn

Later improvementsEdit

Hastings was poorly served by the railway, as many of the residential areas to the east of the town centre were some distance from the station. In 1872, the SER considered building a new station, but progress stalled until July 1886, when a local landowner offered £1,000 (£Template:Inflation in Template:Inflation-year) to build a station near Ore Tunnel. Ore railway station opened on 1 January 1888.Template:Sfn

The original swing bridge over the River Rother east of Rye was proposed to be replaced by a fixed bridge in 1881. The SER were amenable to this as the Monk Bretton Bridge (that now carries the A259 east of Rye) was in planning stages, though the replacement bridge did not open until 1903.Template:Sfn In 1899, the SER and the London, Chatham and Dover Railway created the South Eastern and Chatham Railway (SE&CR) as a joint operation.Template:Sfn

In 1907, a steam railcar service was introduced on the line in an attempt to increase local traffic. Three additional halts were constructed between Winchelsea and Hastings; Three Oaks, Guestling (later renamed Doleham) and Snailham, all of which opened on 1 July.Template:SfnTemplate:Sfn Snailham Halt was inaccessible by public road, and could only be reached by a rough track. The station was never modernised, and retained its original wooden platforms.Template:Sfn Steam railcar services were withdrawn in February 1920 and replaced with tank engines.Template:SfnTemplate:Sfn Snailham Halt closed on 2 February 1959.Template:SfnTemplate:Sfn

Following World War I, plans were put forward to construct a chord linking the line eastwards at Ashford towards Template:Rws. This would allow trains to run between Hastings and Dover without having to reverse. The plans stalled at the design stage and the link was never constructed.Template:Sfn

At the start of 1923, the SER, LCDR and SE&CR amalgamated with other railways to form the Southern Railway as part of the Railways Act 1921.Template:Sfn The line was electrified from Hastings to Ore in 1935, and electric services began on 7 July. This was done in order that trains could be serviced in a siding away from the centre of Hastings. The siding closed in May 1986.Template:Sfn It was revived for the Kent electrification scheme Phase 2 of the British Railways Modernisation Plan in the early 1960s, which included some preparatory work such as a footbridge at Rye. The plans were later dropped.Template:Sfn

A regular hourly service was introduced in 1959, with additional peak services. This schedule has been largely unchanged.Template:Sfn

Threatened closureEdit

File:Winchelsea Railway Station.jpg
Since the Marshlink line was single-tracked in 1979, Winchelsea railway station has only used one platform.

The line was recommended for closure by Dr. Richard Beeching in the 1963 Beeching Report as it attracted less than 10,000 passengers a week.Template:SfnTemplate:Sfn Like other lines threatened with closure, there was strong opposition, and the route survived because the nearby road network made it impractical to run a replacement bus service.<ref>Template:Cite news</ref> The parallel A259 from Hastings to Brenzett had several level crossings over the line and a hairpin bend at Winchelsea, all of which remain as of the 21st century.<ref name=mag/>

The local member of parliament for Rye, Bryant Godman Irvine, made a significant Commons speech complaining about the decision to close the line. As well as the A259, he complained that a lack of rail service would cause problems for holidaymakers, children getting to school, and freight. He also discovered a bus took an hour to travel Template:Convert between Rye and Ashford.<ref name=rbo_beeching>Template:Cite news</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> To save money and prevent closure, the main line was temporarily single-tracked between Appledore and Ore from June 1965, which lasted until September 1966.<ref>Template:Cite newsTemplate:Subscription required</ref>

On 23 February 1966, the Ministry of Transport confirmed the branch to New Romney would close to passengers, which happened on 6 March 1967.Template:Sfn It was kept open for freight as far as a nuclear flask loading and unloading point just outside Dungeness.Template:Sfn This branch continues to run a regular service for this purpose, and occasional special passenger trains have been run for rail enthusiasts.Template:SfnTemplate:Sfn Shortly afterwards, John Morris, Parliamentary Under-Secretary of State for the Ministry of Transport, said that the remaining line was under review and would not close without further advice.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Transport minister Michael Heseltine said a condition of the line closing would be improvements to buses from Ashford to Ore.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

File:Railway Track - geograph.org.uk - 522685.jpg
The Marshlink line is mostly single-track between Template:Rws and Template:Rws. At the River Tillingham bridge in Rye shown, it is clear where the second track once ran.

In 1969, Railway Magazine wrote that the line would close completely at the end of the year. In 1971, the Kent Messenger stated the same,Template:Sfn as did The Times, which also reported the railway was losing around £130,000 a year.<ref>Template:Cite newsTemplate:Subscription required</ref> The Mayors of Rye and Winchelsea disputed these figures and pointed out that the line was the fastest connection between the Channel ports and the Sussex coast, and the figures did not include passengers buying tickets at other stations and using the line for part of their journey.<ref>Template:Cite newsTemplate:Subscription required</ref>

In December 1973, the Secretary of State for the Environment, John Peyton said the line's future was being discussed with the local county councils.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> On 31 July the following year, the ministry recommended the line for closure but stated that services would run indefinitely for the foreseeable future.Template:Sfn

The line was single-tracked between Appledore and Ore on 1 October 1979, leaving a passing loop at Rye, in order to reduce maintenance and operational costs. At Winchelsea, the down platform was removed; trains in both directions now stop on the former up platform.Template:Sfn The overall line speed was reduced from 85 mph to 60 mph.<ref>Template:Cite news</ref> Long-term speed restrictions were put in place, including 40 mph between Doleham and Ore<ref name=marshlink_future/> and 20 mph across a half barrier level crossing at Winchelsea.Template:Sfn The restrictions mean that services along the Marshlink line do not make optimum use of the rolling stock, which has a top speed of Template:Convert.Template:Sfn

The construction of the Channel Tunnel reopened discussions about electrification. In 1990, Network Southeast hoped to have work complete within four years.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In January 1992, the Minister for Public Transport, Roger Freeman, announced plans for British Rail to start electrification by 1995.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

PrivatisationEdit

Following the privatisation of British Rail, the line was operated by Connex South Eastern from 1996, later transferring to Connex South Central.<ref name=connex/><ref>Template:Cite report</ref> After Eurostar services began stopping at Ashford International in 1996, direct services were introduced on the Marshlink line beyond Hastings to Eastbourne and Brighton for the first time in 60 years.Template:Sfn

By 1998, traffic on the line had improved by around 17–20%.<ref name="connex">Template:Cite news</ref> In 2000, Connex lost its rail franchise following criticism of its management and performance.<ref>Template:Cite news</ref> Norman Baker, MP for Lewes described a Marshlink service as "a 1954 diesel train, which shunts along like Thomas the Tank Engine at about 10 mph from Ashford to Hastings."<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The franchise was awarded to Govia, taking over operations in 2001, and rebranding as Southern two years later.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The line closed for nine weeks between January and March 2012 for essential repair work to Ore tunnel, which was at risk of seeping water. The embankment between Ashford International and Ham Street was repaired, and the bridges next to Doleham and Three Oaks were rebuilt. There was also maintenance to signals to increase train speeds along the line. Network Rail planned to complete the work before patronage increased during the summer.<ref>Template:Cite news</ref><ref>Template:Cite news</ref> The closure was criticised by MPs whose constituencies the line ran through, who questioned why the entire line had to close in one go as opposed to individual sections at a time.<ref>Template:Cite news</ref> A peak-time shuttle service between Ashford and Rye was cancelled in 2020.<ref>Template:Cite news</ref><ref>Template:Cite news</ref>

From 2001, there were proposals to build an additional station at Template:Rws, between Ashford International and Ham Street. These were strengthened by the development of the new Finberry estate to the southeast of Ashford.<ref>Template:Cite news</ref> In December 2018, Ashford Borough Council concluded it was not economically viable or practical to build the station.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

In May 2018, Southern announced that services to Brighton would terminate instead at Eastbourne. The company said it would improve capacity between Eastbourne and Hastings, and remove a two-carriage diesel service from the electrified and often overcrowded Brighton – Eastbourne line, but it was criticised by various councillors whose wards lay on the route.<ref name="eastbourneherald.co.uk"/><ref name="sussexexpress.co.uk"/>

Listed buildingsEdit

The Marshlink line contains several listed buildings along its route, which show architectural or historical merit. The original station buildings were designed by William Tress for the SER and constructed in an Italianate style.<ref name=nhle1252164/><ref name=he/><ref name=nhle1391381/> As Rye was planned to be a main stop, its station is larger than others along the line.Template:Sfn

Location Grade Date listed Notes
File:Queens Road railway bridge, Hastings (geograph 6043878).jpg Queen's Road Bridge, Hastings II 14 September 1976<ref>Template:NHLE</ref> citation CitationClass=web

}}</ref>

File:Rye Station 01.jpg Rye railway station II 11 April 1980<ref name=nhle1252164>Template:NHLE</ref>
File:Gatekeepers Cottage Rye.jpg Gatekeeper's cottage, Rye II 22 September 1987 The cottage is to the northwest of the Rope Walk level crossing, east of Rye railway station.<ref>Template:NHLE</ref>
File:AppledoreRailwayStation.jpg Appledore railway station and goods shed II 2 July 2001 At the time of listing, the main station building had been boarded up and was largely architecturally unchanged since its original 1851 build.<ref name=he>Template:NHLE</ref><ref>Template:NHLE</ref>
File:Ham Street station. - geograph.org.uk - 934043.jpg Ham Street railway station II 9 May 2005<ref name=nhle1391381>Template:NHLE</ref>
File:Rye Station 05.JPG Rye signal box II 18 July 2013 One of only two Saxby & Farmer Type 12 signal boxes still standing (the other is at Template:Rws)<ref>Template:NHLE</ref>

Accidents and incidentsEdit

Accidents occurring at Ashford and Hastings stations are not covered.
  • On 30 April 1852, driver John Hadley was killed at Ham Street station when he went to inspect a locomotive boiler which exploded as he approached it.Template:Sfn
  • On 27 December 1898, eight passengers were injured when a horse box was roughly shunted and collided with the passenger train it was to be attached to at Appledore.<ref name=Appledore1898>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref>

  • On 14 March 1980, an empty stock train comprising five Hastings Unit vehicles derailed at Appledore due to excessive speed through a set of points. The driver was killed. A motor coach was consequently withdrawn from service due to extensive damage.Template:Sfn
  • On 26 April 1984, a train carrying a nuclear flask on the Dungeness goods branch hit a car on an open level crossing close to Brookland. The line had a speed limit of Template:Convert and no damage was done to the flask, though the carrying locomotive was slightly damaged. The occupants of the car did not suffer any serious injuries.<ref>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref>

Rolling stockEdit

File:Winchelsea 8 82 copy.jpg
A Template:Brc at Winchelsea station in 1982

Since the Marshlink line is not electrified from Ashford to Ore, it uses different rolling stock from most of the nearby rail network. The line was originally operated by 4-4-0 locomotives. When the railmotor service was introduced, it used stock from Kitson and Company; following the failure of this service, the line switched to using a variety of tank engines.Template:Sfn By 1962, "Thumper" diesel units had been introduced, replacing steam services.Template:SfnTemplate:Sfn By the late 1970s, British Rail Class 206 units were running on the line.Template:Sfn

Southern planned to withdraw this rolling stock after completing electrification of its remaining diesel lines, but the Strategic Rail Authority rejected the £150 million cost as prohibitive.<ref>Template:Cite newsTemplate:Subscription required</ref> Instead, the company introduced Class 171 "Turbostar" Diesel Multiple Units.Template:Sfn<ref name=RouteMapA>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The short section from Ore to Hastings is electrified, and in addition to the Class 171s, sees services using electric multiple units such as Class 377s.<ref name=377s/>

The mostly diesel-only line prevents other rolling stock being used, including the Class 375 trains used elsewhere on the South East Mainline, and the Class 395 "Javelin" trains on High Speed 1.Template:Sfn In the event of a breakdown, the lack of available Class 171s can mean disruption or cancellation of services.<ref>Template:Cite news</ref> The Class 171s are maintained at Southern's depot in Selhurst, some distance away from the line.<ref name=mag/> In November 2017, the Chief Operating Officer of Hitachi Rail Europe suggested the line could use British Rail Class 802 electro-diesel multiple unit trains, allowing direct running between HS1 and Hastings.<ref>Template:Cite journal</ref>

FutureEdit

In 2015, Amber Rudd, Member of Parliament for Hastings, campaigned for electrification to start within the next two years, which planned to reduce times to London from Hastings to 68 minutes, and from Rye to under an hour.<ref>Template:Cite news</ref><ref>Template:Cite news</ref> This would require remodelling Ashford International to connect the Marshlink line to HS1, installing power systems, and adding a grade-separated diversion from Rye to the west, in addition to new trains.<ref name=rbo>Template:Cite news</ref> An alternative proposal was put forward in 2016 that involved bi-modal trains which would not require electrification on the Marshlink line.<ref>Template:Cite news</ref> The two level crossings with the A259 have been criticised as being inadequate, and a decision would be required with the Highways Agency, who manage the road, as to what work is required to make the upgrades go ahead.<ref>Template:Cite news</ref>

The Marshlink Action Group is a volunteer group set up in 2003 in the interests of passengers using the line.<ref name=marshlink_future>Template:Cite news</ref> The group are concerned about the line's future, particularly the use of Class 171 DMUs. They have reported that a high proportion of children and the elderly use the line compared to others in the south east, and a lack of additional rolling stock.<ref name=mag>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In 2016, Rudd chaired a working group to look at short and long-term plans for upgrading the Marshlink line, including the potential accommodation of Class 395 rolling stock.<ref>Template:Cite news</ref> A report from Network Rail in 2016 suggested that third-rail electrification would cost around £100–250 million, and overhead electrification would cost between £250 and £500 million.Template:Sfn

In May 2018, the Department for Transport allocated £200,000 for further electrification design, with the possibility of completion in 2022 when the existing track life-expires. This provided the possibility of travelling from Ashford to Hastings in 20 minutes.<ref>Template:Cite news</ref>

In early 2021, Kent County Council wrote a strategic outline business case (SOBC) to the government for electrifying the line and track changes at Ashford.<ref>Template:Cite report</ref> Later that year, Network Rail made two proposals; one with diesel bi-mode trains estimated at £153m – £198m, the other recommending third-rail electrification costed at £434m – £557m. An extra platform at Ashford International, 2a, was included in these plans. Both proposals required closing the Ore Tunnel for six months.<ref>Template:Cite report</ref>

ReferencesEdit

Notes Template:Notelist Citations Template:Reflist Sources Template:Refbegin

Template:Refend

External linksEdit

Template:Railway lines in South East England