The Pingtung Line (Template:Zh) is part of the West Coast line of Taiwan Railway.
It is Template:Cvt long, of which Template:Cvt is double track.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
The section between Nanzhou and Linbian railway stations will be upgraded from a single-track railway to a double-track railway in December 2019 while the section between Chaozhou and Nanzhou, and the section between Linbian and Fangliao is expected to remain in single-track.<ref name="Taipei Times 2019">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Taiwanese government stated in 2007 that it reserved the possibility to upgrade the entire section to dual-track railway when the number of travelers through Pingtung Line reaches a certain level <ref name="96 年 11 月 23 日 2007">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
HistoryEdit
The line was completed in 1941. The section between Kaohsiung and Pingtung was electrified on July 10, 1996.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The section between Pingtung and Chaozhou was electrified on August 23, 2015, when the elevated tracks between the two stations opened.<ref>Template:Cite news</ref>
Chaozhou–Fangliao upgradesEdit
Immediately following the completion of the elevated tracks between Pingtung and Chaozhou, the TRA began planning for the electrification of the last section of the line between Chaozhou and Fangliao. The plan was approved by the Ministry of the Interior on June 3, 2013, and construction began on November 16, 2014.<ref name="rn243">Template:Cite magazine</ref>
Aside from electrifying the tracks, the following upgrades were carried out simultaneously:<ref name="rn243"/>
- Extending and raising platforms at all stations to cater to low-floor trains
- Adding a second track between Nanzhou and Linbian
- Adding a second platform at Zhen'an and Jiadong
The infrastructure was completed in October 2019, and beginning on November 8, test runs using electric trains were carried out on the line. The electrified tracks officially entered service on December 23, 2019.<ref name="rn243"/><ref>Template:Cite news</ref>