Template:Expand Chinese Template:Primary sources Template:Short description Template:Use dmy dates Template:Infobox rail line

The Pingtung Line (Template:Zh) is part of the West Coast line of Taiwan Railway.

It is Template:Cvt long, of which Template:Cvt is double track.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The section between Nanzhou and Linbian railway stations will be upgraded from a single-track railway to a double-track railway in December 2019 while the section between Chaozhou and Nanzhou, and the section between Linbian and Fangliao is expected to remain in single-track.<ref name="Taipei Times 2019">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Taiwanese government stated in 2007 that it reserved the possibility to upgrade the entire section to dual-track railway when the number of travelers through Pingtung Line reaches a certain level <ref name="96 年 11 月 23 日 2007">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

HistoryEdit

The line was completed in 1941. The section between Kaohsiung and Pingtung was electrified on July 10, 1996.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The section between Pingtung and Chaozhou was electrified on August 23, 2015, when the elevated tracks between the two stations opened.<ref>Template:Cite news</ref>

Chaozhou–Fangliao upgradesEdit

Immediately following the completion of the elevated tracks between Pingtung and Chaozhou, the TRA began planning for the electrification of the last section of the line between Chaozhou and Fangliao. The plan was approved by the Ministry of the Interior on June 3, 2013, and construction began on November 16, 2014.<ref name="rn243">Template:Cite magazine</ref>

Aside from electrifying the tracks, the following upgrades were carried out simultaneously:<ref name="rn243"/>

  • Extending and raising platforms at all stations to cater to low-floor trains
  • Adding a second track between Nanzhou and Linbian
  • Adding a second platform at Zhen'an and Jiadong

The infrastructure was completed in October 2019, and beginning on November 8, test runs using electric trains were carried out on the line. The electrified tracks officially entered service on December 23, 2019.<ref name="rn243"/><ref>Template:Cite news</ref>

StationsEdit

Name Chinese Taiwanese Hakka Transfers and Notes Location
Kaohsiung Template:Large Ko-hiông Kô-hiùng Template:Rint West Coast line
File:AB-Kreuz.svg Template:RintTemplate:Rint Template:STN
Sanmin Kaohsiung
Minzu Template:Large Bîn-cho̍k Mìn-chhu̍k
Science and
Technology Museum
Template:Large Kho-kang-koán Khô-kûng-kón
Zhengyi Template:Large Chèng-gī Chang-ngi
Fengshan Template:Large Hōng-soaⁿ Fung-sân File:AB-Kreuz.svg Template:RintTemplate:Rint Template:MRT station Fengshan
Houzhuang Template:Large Āu-chng Heu-chông Daliao
Jiuqutang Template:Large Kiú-khiok-tông Kiú-khiuk-thòng Dashu
Liukuaicuo Template:Large La̍k-tè-chhù Liuk-khoài-chhṳ̀ Pingtung Pingtung
County
Pingtung Template:Large Pîn-tong Phìn-tûng
Guilai Template:Large Kui-lâi Kûi-lòi
Linluo Template:Large Lîn-lo̍k Lìm-lo̍k Linluo
Xishi Template:Large Sai-sì Sî-sṳ Zhutian
Zhutian Template:Large Tek-chhân Chuk-thièn
Chaozhou Template:Large Tiô-chiu Chheù-chû Chaozhou
Kanding Template:Large Khàm-téng Kham-táng Kanding
Nanzhou Template:Large Lâm-chiu Nàm-chû Nanzhou
Zhen'an Template:Large Tìn-an Chṳ́n-ôn Linbian
Linbian Template:Large Nâ-piⁿ Lìm-piên
Jiadong Template:Large Ka-tang Kâ-tûng Jiadong
Donghai Template:Large Tang-hái Tûng-hói Fangliao
Fangliao Template:Large Pang-liâu Piông-liàu Template:Rint South-link line

See alsoEdit

ReferencesEdit

Template:Sister project Template:Reflist Template:Taiwan Railways Administration Template:Pingtung Line