Template:Short description Template:Distinguish Template:For-multi Template:Use Australian English Template:Use dmy dates {{#invoke:Infobox|infobox}}Template:Template otherTemplate:Main other{{#invoke:Check for clobbered parameters|check|nested=1|template=Infobox company|cat=Template:Main other|name; company_name|logo; company_logo|logo_alt; alt|trade_name; trading_name|former_names; former_name|type; company_type|predecessors; predecessor|successors; successor|foundation; founded|founders; founder|defunct; dissolved|hq_location; location|hq_location_city; location_city|hq_location_country; location_country|num_locations; locations|areas_served; area_served|net_income; profit|net_income_year; profit_year|owners; owner |homepage; website }}{{#invoke:Check for unknown parameters|check|unknown=Template:Main other|preview=Page using Template:Infobox company with unknown parameter "_VALUE_" | ignoreblank=y | alt | area_served | areas_served | assets | assets_year | aum | brands | company_logo | company_name | company_type | defunct | dissolved | divisions | embed | equity | equity_year | fate | footnotes | former_name | former_names | foundation | founded | founder | founders | genre | homepage | hq_location | hq_location_city | hq_location_country | incorporated | image | image_alt | image_caption | image_size | image_upright | income_year | industry | ISIN | key_people | location | location_city | location_country | locations | logo | logo_alt | logo_caption | logo_class | logo_size | logo_upright | members | members_year | module | name | native_name | native_name_lang | net_income | net_income_year | num_employees | num_employees_year | num_locations | num_locations_year | operating_income | owner | owners | parent | predecessor | predecessors | production | production_year | products | profit | profit_year | rating | ratio | revenue | revenue_year | romanized_name | services | subsid | successor | successors | traded_as | trade_name | trading_name | type | website| qid | fetchwikidata | suppressfields | noicon | nocat | demo | categories }} Queensland Rail (QR) is a railway operator in Queensland, Australia. Queensland Rail is owned by the Queensland Government, and operates both suburban and interurban rail services in South East Queensland, as well as long-distance passenger train services connecting Brisbane to regional Queensland. Queensland Rail also owns and maintains rolling stock, in addition to approximately Template:Convert of track and related infrastructure.

HistoryEdit

File:2498 - 060288 - Corinda.jpeg
2470 class at Corinda in the original diesel livery in February 1998

Early historyEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} Queensland Railways was the first operator in the world to adopt a narrow gauge (in this case Template:Track gauge) for a main line,<ref>Kerr J 'Triumph of Narrow Gauge', Boolarong Publications 1990</ref> and this remains the system-wide gauge in Queensland.

The colony of Queensland separated from New South Wales in 1859, and the new government was keen to facilitate development and immigration. Improved transport to the fertile Darling Downs region situated west of Toowoomba was seen as a priority. As adequate river transport was already established between the capital Brisbane and the then separate settlement of Ipswich, the railway commenced from the latter locality and the initial section, built over the relatively flat, easy country opened to Bigge's Camp, at the eastern base of the Little Liverpool Range, on 31 July 1865. Called the Main Line, the only significant engineering work on that section was the bridge over the Bremer River to North Ipswich.

Tunneling excavation through the Little Liverpool Range delayed the opening of the next section to Gatton by 10 months, but the line was opened to Toowoomba in 1867, the ascent of the Main Range being the reason for the adoption of narrow gauge.

Built by the Queensland Government to the unusual (for the time) gauge of Template:Track gauge, the line largely followed the alignment surveyed by a private company, the Moreton Bay Tramway Company, which had proposed to build a Template:Track gauge horse-drawn tramway but had been unable to raise funds to do so beyond an initial start on earthworks.

The adoption of a narrow gauge was controversial at the time and was largely predicated by the government's desire for the fastest possible construction timeframe at the least cost.<ref>Template:Cite news</ref> This resulted in the adoption of sharper curves and a lower axle load than was considered possible using the standard gauge, and an assessment at the time put the cost of a narrow gauge line from Ipswich to Toowoomba at 25% of the cost of a standard gauge line. In a colony with a non-indigenous population of 30,000 when the decision was made, it is understandable.

The network evolved as a series of isolated networks. It wasn't until the completion of the North Coast line in December 1924 that all were joined.<ref>The North Coast Line Template:Webarchive The Telegraph 9 December 1924 page 8</ref> The exception was the Normanton to Croydon line which always remained isolated. At its peak in 1932, the network totaled Template:Convert.

Changing transport patterns resulted in the closure of many development branch lines from 1948 onwards, but at the same time the main lines were upgraded to provide contemporary services, and from the 1970s an extensive network of new lines was developed, particularly to service export coal mines.

ElectrificationEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}

File:QREMU03.jpg
EMU03 at Sunshine in October 2016

Commencing in November 1979, the Brisbane suburban network was electrified.

In 1978, discussions were commenced on the possible electrification of the Blackwater and Goonyella coal networks. This was due to an expected increase in coal traffic across the networks, an ageing diesel-electric locomotive fleet and the increase in diesel fuel costs. By early 1983, a decision had been made to electrify the networks and by early 1984, contracts were already starting to be let for the new locomotives and other works for the project. The decision was made to electrify with the 25 kV AC railway electrification system as used on the Brisbane suburban network. This would allow future connection of the Brisbane network with the coal networks via the North Coast line.

The project was to be carried out in four stages:<ref>Template:Cite book</ref>

  • Stage 1: Electrification of the main line from Gladstone to Rockhampton, including parts of Rockhampton marshalling yard, then west to Blackwater and the coal mines in the area. This was a total of Template:Convert of the track.
  • Stage 2: Electrification of the coal lines south of Dalrymple Bay and Hay Point, then west through the Goonyella system, southwest to Blair Athol and south to Gregory – linking the Goonyella system to the Blackwater system. This was a total of Template:Convert of the track.
  • Stage 3: Electrification of the main western line from Burngrove to Emerald. This would allow electric freight from Rockhampton to Emerald.
  • Stage 4: Electrification of the line from Newlands coal mine to Collinsville and northeast to Abbott Point. This stage never went ahead. In 1986, it was decided to electrify the North Coast line between Brisbane and Gladstone instead and this became known as Stage 4.<ref>Template:Cite book</ref><ref>Template:Cite book</ref>

Interstate freight expansionEdit

In September 1999, Queensland Rail was rebranded as QR.<ref>"Queensland Rail Becomes QR and Looks Beyond its Borders" Railway Digest November 1999 page 9</ref> In March 2002, Queensland Rail purchased Northern Rivers Railroad and rebranded it Interail, fulfilling a long-held ambition of expanding beyond its state borders.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

In March 2003, Queensland Rail entered the Hunter Valley coal market when Interail commenced a contract from Duralie Colliery to Stratford Mine. Another coal contract was won in late 2003 for the haulage of coal from Newstan Colliery, Fassifern to Vales Point Power Station. In 2004, Interail began running Brisbane to Melbourne and Sydney to Melbourne intermodal services. In June 2005, Queensland Rail acquired the CRT Group.<ref>Queensland Rail sorts logistics for acquisition Template:Webarchive The Age 25 June 2005</ref>

In June 2006, the Western Australian business of the Australian Railroad Group was purchased.<ref>Sale of Australian Railroad Group Template:Webarchive Wesfarmers 14 February 2006</ref><ref>ARG on board Queensland Rail Template:Webarchive The Age 31 March 2006</ref><ref>QR closes national rail freight deal QR National 2 June 2006</ref>

Privatisation and the current eraEdit

QR was responsible for all Queensland freight services, and from 2002 operated interstate services under the Australian Railroad Group, Interail and QR National brands. These were all spun out into a separate entity in July 2010, and later privatised as Aurizon.

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} In June 2009, the Queensland Government announced the privatisation of Queensland Rail's freight business.<ref>Queensland asset sales to reap $15 billion Template:Webarchive Brisbane Times 2 June 2009</ref><ref>Premier announces QR Privatisation Plan Template:Webarchive Railway Gazette International 4 June 2009</ref> This resulted in Queensland Rail's freight assets being transferred to QR National (now Aurizon) from 1 July 2010.

In April 2013, the Queensland Parliament passed the Queensland Rail Transit Authority Bill 2013 that restructured Queensland Rail.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The explanatory notes published for the bill outlined that the existing Queensland Rail Limited entity would remain although no longer be a government-owned corporation and that entity would become a subsidiary of a new Queensland Rail Transit Authority (QRTA), in effect creating a Queensland Rail group. Under the revised arrangements Queensland Rail Limited retained assets and liabilities and staff were transferred to the QRTA.<ref name="TA">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> As a result of transferring the staff to the QRTA, the government moved those employees from the federal industrial relations system to the state-based industrial relations system, giving the state more control over industrial arrangements.<ref name="TA" /><ref name="FW">Template:Cite news</ref> In November 2013, five labour unions commenced legal proceedings in the High Court of Australia alleging that the QRTA was subject to the federal industrial jurisdiction rather than the state system.<ref name="FW" /> In April 2015, the court ruled the QRTA was subject to the Fair Work Act 2009 and the federal industrial relations jurisdiction.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Company LeadersEdit

CommissionersEdit

File:Abram Fitzgibbon circa 1863.JPG
Abram Fitzgibbon, circa 1863

The Commissioners of the Queensland Railways were:

|CitationClass=web }}</ref>

Note: from 29 April 1869 to 15 July 1870, the Secretary for Public Works was appointed Commissioner for Railways.<ref name="QG" /><ref name="GG">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Note: from 29 July 1889 a Board of three Commissioners was appointed to reduce political influence.<ref>Template:Cite book</ref> This was reduced back to a single Commissioner in September 1895.<ref>Template:Cite news</ref>

Note: from 1 July 1991 the position of Commissioner for Railways ceased to exist, replaced by a Chief Executive Officer, reporting to a board of Directors.<ref>Template:Cite book</ref>

Chief Executive OfficersEdit

Name Tenure Notes
Vincent John O'Rourke July 1991 – December 2000
Bob Scheuber December 2000 – April 2007
Stephen Cantwell April 2007 – November 2007
citation CitationClass=web

}}</ref>

November 2007 – 30 June 2010
Paul Scurrah citation CitationClass=web

}}</ref>

From formation of revised Queensland Rail entity following Public float of QR National. Previously Executive General Manager of QR Passenger subsidiary.<ref name="LA" />
James Benstead December 2011 – August 2013
Glen Dawe citation CitationClass=web

}}</ref>– January 2014<ref>Template:Cite news</ref>

Helen Gluer citation CitationClass=web

}}</ref>

Neil Scales October 2016 – March 2017
Nick Easy citation CitationClass=web

}}</ref>– December 2021<ref>{{#invoke:citation/CS1|citation

CitationClass=web

}}</ref>

Katarzyna (Kat) Stapleton citation CitationClass=web

}}</ref>

ServicesEdit

South East QueenslandEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}

QR operates urban and interurban rail services throughout South East Queensland as part of the Translink network. Rail services operate on twelve lines: Airport, Beenleigh, Caboolture, Cleveland, Doomben, Ferny Grove, Gold Coast, Ipswich/Rosewood, Redcliffe Peninsula, Shorncliffe, Springfield and Sunshine Coast. QR operate these with the Electric Multiple Units (EMU), Suburban Multiple Units (SMU), Interurban Multiple Units (IMU) and New Generation Rollingstock (NGR) class electric multiple units.<ref>Citytrain fleet Template:Webarchive Queensland Rail</ref>

Long-distance trainsEdit

Queensland Rail operate five long-distance passenger rail services, under the brand name Queensland Rail Traveltrain:<ref name=QRTravel>Network Map Template:Webarchive Queensland Rail Travel</ref>

Connecting road coach services are operated.<ref>Connections Template:Webarchive Queensland Rail Travel</ref>

Annual patronage all travel and tourism servies in 2022–23 was 690,000.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In 2007/08, the subsidy for the Brisbane–Cairns route (NCL) was $130 million, or $900 per passenger. In 2001/02 it was $270 million.<ref>Template:Cite news</ref><ref>Template:Cite news</ref>

Tourist trainsEdit

Queensland Rail also operate two tourist services:<ref name=QRTravel />

Former servicesEdit

Queensland Rail operated many named trains including:

Rolling stockEdit

QR sourced steam locomotives from many manufacturers including Armstrong Whitworth, Avonside Engine Company, Beyer, Peacock & Company, Dübs & Co, Kitson & Co, Nasmyth, Wilson & Co, Neilson and Company, North British Locomotive Company, Vulcan Foundry and Yorkshire Engine Company all of the United Kingdom, Baldwin Locomotive Works of the United States, as well as Australian manufacturers Clyde Engineering, Evans, Anderson, Phelan & Co, Islington Railway Workshops, Newport Workshops, Phoenix Engine Company, Toowoomba Foundry and Walkers Limited. It also built some in-house at North Ipswich Railway Workshops.<ref>Template:Cite book</ref>

In 1936, the company owned 750 locomotives, 67 railcars, 998 coaches, 94 mail cars, 177 brake vans and 18.699 goods wagons.<ref>Template:Cite book</ref>

Dieselisation commenced in 1952 with early purchases being imported from GE Transportation and English Electric, before standardising on locally made products from A Goninan & Co, Clyde Engineering, English Electric and Walkers Limited. Electric locomotives were purchased from Clyde Engineering, Walkers Limited and Siemens. Electric multiple units have been purchased from Walkers Limited, Downer Rail and Bombardier Transportation, the latter of two which are still present in Queensland to this day.

With the closure of many rural branch lines in the 1990s there was excess motive power on the QR and it was chosen to standardise by using Clyde based diesel locomotives. Most, if not all of the English Electric locomotives were withdrawn by 2000.

In June 2021 QR announced that it had shortlisted 3 applicants (Alstom, CAF and Downer Rail) to manufacture 20 (later expanded to 65) new electric multiple units.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}Template:Dead link</ref> In 2023, it was confirmed that 65 new six-car units would be built by Downer Rail at a new state facility in Torbanlea, near Maryborough.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> These will allow for expansion of the fleet and retiring of the remaining EMU and ICE units.

Class Image (if applicable) Type Top speed (km/h) Built Number of units Routes operated Notes
City network fleet
EMU File:Electricmultipleunit 42.jpg Electric multiple unit 100 1979–1986 10 (March 2025) City network (except Interurban services) Currently being progressively retired since July 2018. Most of the fleet (including units 01–43, 48, 49, 52, 54, 57, 58, and 60–88) has been withdrawn.
SMU200 File:208Springfield.jpg Electric multiple unit 100 1994–1995 12 City network (except Interurban services) Units numbered 201–212

All units have been refurbished from 2019 - 2024.<ref name="TT">{{#invoke:citation/CS1|citation

CitationClass=web

}}</ref>

IMU100 File:IMU103105.jpg Electric multiple unit 140 1996–1997 10 City network Units numbered 101–110

All units are to be refurbished from 2019 - present.<ref name="TT" />

SMU220 File:224Gailes.jpg Electric multiple unit 100 1999–2001 30 City network (except Interurban services) Units numbered 221–250
IMU120 File:IMU122123.jpg Electric multiple unit 140 2001 4 City network Units numbered 121–124
IMU160 File:IMU 184.jpg Electric multiple unit 130 2006–2011 28 City network Units numbered 161–188

All units are to be refurbished from 2022 - present,<ref name="QT">{{#invoke:citation/CS1|citation

CitationClass=web

}}</ref> and fitted with ETCS equipment.<ref name="ER">{{#invoke:citation/CS1|citation

CitationClass=web

}}</ref>

SMU260 File:266Corinda.jpg Electric multiple unit 130 2008–2011 36 City network Units numbered 261–296

All units are to be refurbished from 2022 - present,<ref name="QT" /> and fitted with ETCS equipment.<ref name="ER" />

NGR700 File:NewGeneration710.jpg Electric multiple unit 140 2015–2019 75 City network (except Ferny Grove, Beenleigh & Rosewood<ref>{{#invoke:citation/CS1|citation CitationClass=web

}}</ref><ref>{{#invoke:citation/CS1|citation

CitationClass=web

}}</ref>)

Units numbered 701–775
Former City Network fleet
ICE File:156COOROY.jpg Electric multiple unit 120 1988–1989 0 (November 2021) City network As of November 2021, all ICE Units have been retired from the City Network Fleet. They previously operated between Roma Street and Gympie North stations. It is not yet known what will happen to these units after retirement.
Traveltrain fleet
Electric Tilt Train File:City of Maryborough Platform 10 Roma Street Station Brisbane P1280919 (cropped).jpg Tilting electric multiple unit 160 1997 2 North Coast line (as far as Rockhampton)
Diesel Tilt Train File:Spirit Of Queensland - Diesel Tilt Train.jpg Tilting push-pull train 160 2003–2014 3 North Coast line
Locomotive fleetTemplate:Note label
1720 class File:Kuranda Scenic Railway Cairns.JPG Diesel locomotive 100 1966–1970 8 Operational

4 Stored

1 Under overhaul

Kuranda Scenic Railway, Traveltrain services and infrastructure trains. The most common use for the 1720 Class is as secondary motive power on the Spirit of the Outback and the Westlander as well as the main motive power on the Kuranda Scenic Railway, the locomotives also see regular use on Infrastructure Trains.

QR owned locomotives include 1724, 1725 (stored), 1732, 1734 (overhaul)*, 1738, 1744*, 1746, 1751 (stored)*, 1752 (stored), 1754 (stored), 1764*, 1771* and 1774*

*Locomotives in Kuranda Scenic Railway livery

2150 class Diesel locomotive 100 1978–1979 1 Operational

2 Rebuilt

Traveltrain services and infrastructure trains. QR owned locomotives include 2152 (rebuilt to 2902), 2158 and 2163 (rebuilt to 2903).
2170 class File:QR 2170 Class 2174D.jpg Diesel locomotive 100 1982–1984 1 Traveltrain services and infrastructure trains. 2195A is the only QR owned 2170 class.
2400 class File:2414 Diesel At Charleville.jpg Diesel locomotive 100 1977–1978 4 Operational

1 Rebuilt

Traveltrain services and infrastructure trains. QR owned locomotives include 2410, 2411, 2413 (rebuilt to 2901), 2414 and 2415.
2470 class File:2485H SOTO Roma St.jpg Diesel locomotive 100 1980–1983 5 Operational

1 Stored

Traveltrain services and infrastructure trains. QR owned locomotives include 2471 (stored), 2472, 2473, 2474, 2485H and 2490H.
2900 class Diesel locomotive 100 2022-current 4 Operational

1 Under construction

1 Planned

Traveltrain services and infrastructure trains. Converisons from other classes of 90 ton Clyde locomotives ongoing. Converted locomotives include 2413, 2152, 2163 and 2495.
Tourist train fleet
DL class File:DL4 at Ipswich.jpg Diesel locomotive 50 1961 1 Gulflander DL4 based at Normanton, used as backup for the Gulflander's RM 93. Underwent major maintenance at North Ipswich Railway Workshops in 2019.
45 hp rail motor File:Railmotor60.jpg Railmotor 40 1931 1 Gulflander RM60 based at Normanton, used for charters.
102 hp rail motor File:Railmotor93.jpg Railmotor 50 1950 1 Gulflander RM93 based at Normanton, used for weekly Gulflander service. RM93 was converted to the General Manager's Inspection Car for the Central Division in 1972. It was then modified back to full railmotor seating capacity in 1981, and arrived in Normanton in 1982. 
1800 class File:Norman River Bed - panoramio.jpg Railmotor (trailers) 50 1952–1954 2 Gulflander TP1809 is used on the Gulflander tourist railway as a trailer car. TP1811 was originally designated as RM1811, meaning it was a power car. It was formerly used as the commissioner's car and still has its upgraded suspension to this day.
Heritage fleet
A10 class File:A10 No.6 Workshops Rail Museum.JPG Steam locomotive 40 1865–1866 2 No. 6 operational, Australia's oldest operational steam locomotive. Usually placed on display at the Workshops Rail Museum when not required for special trains. No. 3 lasted in service until 1914, and has been retained for preservation and displayed at several locations; it is currently being restored to operation at the North Ipswich Railway Workshops.
B13 class Steam locomotive 50 1883–1895 1 No. 48 located in a storage shed at the North Ipswich Railway Workshops and awaits removal of boiler lagging and repainting before it can be publicly displayed.
B15 class Steam locomotive 65 1889–1899 1 No. 290 located in a storage shed at the North Ipswich Railway Workshops and is awaiting removal of boiler lagging and repainting before it can be publicly displayed.
PB15 class File:PB15 732 Workshops Rail Museum.JPG Steam locomotive 65 1899–1926 2 No. 732 stored. No. 444 now displayed at the entrance to the Workshops Rail Museum.
B13 1/2 class File:Pompey B13 1-2 Ipswich.jpg Steam locomotive 50 1904–1905 1 No. 398 known as 'Pompey' is stored in bogie shop after being displayed outside at the Workshops Rail Museum.
C17 class File:C17 974 During Minor Maintenance .jpg Steam locomotive 80 1920–1953 3 No. 974 stored pending overhaul. No. 1000 being restored to working order. Unfortunately this effort had apparently stalled due to the need for a new welded boiler (similar to 971/974's). No. 2 located in a storage shed at the North Ipswich Railway Workshops awaiting removal of boiler lagging and repainting before it can be publicly displayed.
C19 class Steam locomotive 80 1922–1935 1 No. 700 located in a storage shed at the North Ipswich Railway Workshops awaiting removal of boiler lagging and repainting before it can be publicly displayed.
B18¼ class File:StateLibQld 1 78558 Steam locomotive known as the Pacific built from 1926 - 1950.jpg Steam locomotive 80 1926–1947 1 No. 771 located in a storage shed at the North Ipswich Railway Workshops awaiting removal of boiler lagging and repainting before it can be publicly displayed.
DL class File:DL1 Workshops Rail Museum.JPG Diesel locomotive 50 1939 1 On display at the North Ipswich Railway Workshops. Queensland's first diesel locomotive. Currently not operational.
AC16 class File:AC16 221A Ipswich Workshops.jpg Steam locomotive 80 1943 1 No. 221A operational. (USATC S118 Class)
DD17 class File:DD17 1051 Workshops Rail Museum.JPG Steam locomotive 80 1948–1952 1 No. 1051 is still awaiting reassembly and repainting after undertaking heavy overhaul including brakes, a welded boiler and cabin.
Beyer-Garratt File:Garratt 1009 at Ipswich.jpg Steam locomotive 80 1950–1951 1 No. 1009 on loan to the adjacent Workshops Rail Museum. As a permanent exhibition in the museum. Previous restoration attempts aborted due to insufficient parts, tools, workers and money.
BB18¼ class File:Queensland BB18¼ class locomotive.jpg Steam locomotive 80 1950–1958 2 No. 1079 operational. No. 1089 undergoing motion overhaul.
1150 class Diesel locomotive 80 1952 1 1159 stored pending restoration.
1400 class Diesel locomotive 80 1955 1 1407 sold to Mackay Steam Railway.
1170 class File:1170 - Redbank - 17 August 1988.jpg Diesel locomotive 80 1956 1 1170 stored pending restoration.
1900 class File:QR 1900 class railmotor passing thru Darra during the opening of the electrification of the railway line.jpg Railmotor 80 1956 1 1901 operational, also used as inspection and hired tourist vehicles.
2000 class File:RM2036 Ipswich.jpg Railmotor 80 1956–1971 6 2034 and 2036 operational, on lease to Longreach based Outback Rail Adventure. 2057 stored due to a lack of engine despite some new internal modifications; including Disabled Access and Toilet facilities. 2005are currently stored.
1450 class Diesel locomotive 80 1957 3 1450, 1455 and 1459 sold to Mackay Steam Railway.
1200 class Diesel locomotive 80 1953–1954 1 1200 stored pending restoration.
1250 class File:1262 Workshops Rail Museum.JPG Diesel locomotive 80 1959 2 1262 on display at Workshops Rail Museum.

1263 donated by ARHS(QLD). Stored in Townsville pending transport.

SX carriages File:SX 38 Ipswich.jpg Passenger car 80 1961–1962 7 City network (Formerly) Set 45 formed into one 7-car set. Currently stored awaiting underframe work. A second set is also on site.

SXV from Set 38 stored in bogie shop.

1600 class File:Dia 0186.jpg Diesel locomotive 80 1962 1 1603 on display at Bundaberg Railway Museum
1700 class Diesel locomotive 80 1963 1 1710s cab used as a driving simulator at the Workshops Rail Museum.
1460 class File:1461 Ipswich.jpg Diesel locomotive 80 1964 1 1461 awaiting completion of mechanical restoration.
1270 class File:1281 Workshops Rail Museum.JPG Diesel locomotive 80 1964 2 1270 stored pending restoration. 1281 is on display, in good mechanical condition, at the Workshops Rail Museum.
DH class File:DH 8 - 280586 - Innisfail.jpg Diesel locomotive 50 1966 2 DH2 disassembled from previous restoration attempt. DH71 stored.
1620 class File:QR Locomotive 1650 Redbank - panoramio.jpg Diesel locomotive 80 1967 3 1620 stored indefinitely after major failure requiring rewiring and engine work.

1650 donated by ARHS(QLD). Stored in good condition after partial restoration initiated by the previous custodian.

1651 donated by ARHS(QLD). Stored pending restoration.

Special cars
Vice-Regal Car 80 1903 1 Car 445 is a special saloon retained for use by the Governor of Queensland and is still considered a working item of rollingstock in the QR fleet, however it is on permanent loan to Workshops Rail Museum.<ref>{{#invoke:citation/CS1|citation CitationClass=web

}}</ref>

Template:Note label This table only includes locomotives owned by Queensland Rail. QR also hires locomotives from Aurizon as required.

WorkshopsEdit

From its inception, QR's primary workshops were the North Ipswich Railway Workshops. It was replaced by the Redbank Railway Workshops in the 1960s. The Mayne Yard rail precinct is now the forefront for the repairs and maintenance of the fleet.Template:Citation needed

IncidentsEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} Notable incidents involving Queensland Rail include:

  • On 9 June 1925, 9 people were killed in an accident near Traveston, atop a timber trestle bridge aboard the Rockhampton Mail service. The train was reported to have derailed, causing 2 cars (1 Passenger Car, and 1 Baggage Car) to fall into the Traveston Creek. The incident overall caused 9 fatalities and over 50 injuries.<ref>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref>

  • On 5 May 1947, a crowded charter train de-railed and crashed near Camp Mountain due to excessive speeds down a hill and a bend with 16 deaths.<ref>Camp Mountain Train Smash Template:Webarchive The Morning Bulletin 2 July 1947 page 1</ref> This accident is still the worst "loss of life" accident in Qld Rail history.
  • On 25 February 1960, the East Bound Midlander derailed and crashed 1.5 km away from Bogantungan (Located Between Emerald and Barcaldine) on what is now called Spirit of the Outback Service. Floodwaters, had washed away a tree which hit some pylons holding the Medway Creek Bridge up. The east bound train hauled by two C17 locomotives, at the time had 120 passengers on-board. When the service arrived at the bridge at 2:32am, it plunged 7 – 1/2M into the creek bed after the bridge gave way. Floodwater quickly filled carriages. Both locomotives ended up in the water, as well as three passenger cars. Overall, seven People lost their lives and 43 people were injured. The Medway Creek disaster is seen as the worst in QR's History.<ref>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref>

  • On 23 March 1985, two passenger trains collided head-on near Trinder Park station on the Beenleigh line. Two people died (one of whom was the driver of the south-bound train), and 31 people sustained injuries. Affected units EMU11 and EMU27 were both travelling concurrently on the single track section of the line, despite several "fail-safe" measures and the use of RCS (remote control signalling).<ref>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref><ref>Template:Cite news</ref>

  • On 21 September 2001, EMU units 05 and 60 collided with a cattle train near Petrie, causing two carriages of Unit 05 and one carriage of Unit 60 to be scrapped, with the three remaining carriages merged to form EMU 60.<ref>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref>

|CitationClass=web }}</ref>

  • On 14 September 2012, EMU41 collided with a heavy vehicle that became grounded on the level crossing at St Vincent's Road, Banyo, on the Shorncliffe line. The train driver performed all necessary braking measures, however they were not alerted in time and the train collided with the vehicle, causing extensive damage to the vehicle and the train (along with another train that was in the stationary near the crash). Injuries were sustained by both drivers.<ref>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref>

  • On 31 January 2013, IMU173 failed to stop at Cleveland station and collided with the station toilet block resulting in major damage to the train and minor injuries to several commuters and staff.<ref>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref>

  • On 18 June 2021, A Queensland Rail operated Train – at the time being used for driver training collided with a Loaded Aurizon Coal Train, at Westwood, West of Rockhampton. The incident occurred at 11:26am on an Aurizon operated trainline, while the locomotive was travelling to Bluff. The Queensland Rail Locomotive had three drivers onboard, two of whom suffered injuries. There was one fatality. The QR locomotive 2471 sustained severe damage, with the Aurizon locomotive sustaining less substantial damage. A report of the incident is due in Q2 2022.<ref>{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref>

Criticism and controversyEdit

Sunlander 14Edit

In December 2014, the Queensland Audit Office published a report about QR's Sunlander 14 project. The Sunlander 14 project had a scope to acquire a total of 25 carriages to replace The Sunlander passenger train with a new Diesel Tilt Train, purchase additional luxury cars, for the two existing Diesel Tilt Trains and refurbish their existing carriages.

The project was initially costed at $195 million and allowed for the operation of five services a week. However, costs had risen by 2012, and the Queensland Auditor-General reported that the eventual cost would be from $358 to $404 million, because QR had failed to take into account the requirement for upgraded maintenance facilities, as well as en route provisioning.<ref name="SL">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The Auditor-General also believed, due to issues with the business case that QR had overestimated how popular the new service would be, and had a mistaken belief that the 'luxury' component of the train would attract more high-paying customers.<ref>Chris O'Brien and Kym Agius (9 December 2014). "Auditor-General delivers scathing report on project to replace the Sunlander train" Template:Webarchive. ABC News. Retrieved 28 December 2014.</ref>

In 2013, the project was scaled back, with the train length being reduced to nine cars by removing the luxury sleepers and restaurant cars. That resulted in a revised project cost of $204 million. The Auditor-General's report in particular highlighted that due to the fixed-price construction contract the cost per train car increased and that opportunities were missed to pursue broader long distance train fleet renewal.<ref name="SL" />

Redcliffe Peninsula railway line and subsequent driver shortagesEdit

Template:Overly detailed The Redcliffe Peninsula railway line opened on 4 October 2016 and created a revised timetable that resulted in a 9% increase in services across the network.<ref name="IF">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Queensland Rail did not have sufficient traincrew to operate the increased services. On 21 October a substantial interruption of service occurred involving the cancellation without notice of 167 services (12% of the scheduled services for the day) due to compulsory rest periods required for the train crew (a break of at least 32 hours required when a crew member has worked 11 consecutive days or 14 consecutive shifts).<ref name="IF" />

Following the service interruptions, the head of the train service delivery unit was stood down.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> and an interim timetable implemented that reversed the increase in services and demand for traincrew.<ref name="IF" /> Several weeks after the service interruptions, Queensland Rail CEO Helen Gluer announced her resignation from the company, along with chairman Michael Klug.<ref>Template:Cite news</ref> It was announced on 27 October 2016, that the Director-General of the Department of Transport and Main Roads, Neil Scales, would replace Helen Gluer and that an inquiry known as the Queensland Rail Train Crewing Practices Investigation would be led by Phillip Strachan into the events.<ref>Template:Cite news</ref>

On 25 December 2016, another substantial service cancellation event occurred due to a lack of available traincrew to operate the services.<ref>Template:Cite news</ref><ref name="CO">Template:Cite news</ref> On that day, 261 services, or 36% of scheduled services did not operate.<ref name="IF" /> The underlying reason for the cancellations was a lack of available drivers to operate services. Queensland Rail's Chief Operating Officer resigned several days later.<ref name="CO" />

The inquiry into Queensland Rail's train crewing conducted by Phillip Strachan was completed in February 2017. The report made a number of findings and provided 36 recommendations that the Queensland Government accepted. The findings included that Queensland Rail had experienced a 9% increase in demand for traincrew due to the revised timetable while also experiencing a 7% decrease in traincrew productivity as a result of revised industrial arrangements, had intentionally operated for a number of years with an under-supply of traincrew and utilised the shortfall to provide paid overtime opportunities, had reduced train crew intake during 2014–15 in the lead-up to the opening of the new line, had restrictions on external recruitment and had a longer driver training period than like organisations.<ref name="IF" /> The report also highlighted unclear governance arrangements and a short term focus within the operations section that relied on intuition rather than accurate forecasting and a reluctance to share bad news as contributing factors.<ref>Template:Cite news</ref><ref name="IF" /> The recommendations from the report centred around demand management, supply management, people and process management and governance arrangements.<ref name="IF" />

Following the completion of the Strachan inquiry, Philip Strachan was appointed as Chair of the Queensland Rail Board replacing Acting Chair Nicole Hollows,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> who had been appointed following the resignation Michael Klug.<ref>Template:Cite news</ref> A Citytrain Response Unit was established within the Department of Transport and Main Roads to oversee the implementation of the recommendations from the Strachan inquiry.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The Citytrain Response Unit subsequently commissioned a whole of business review into the organisation that was conducted by Deutsche Bahn and delivered in July 2017<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> and published reports tracking the progress of the implementation of the recommendations.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Executive bonus payments were also suspended for 2017.<ref>Template:Cite news</ref>

See alsoEdit

Template:Portal

ReferencesEdit

Template:Reflist

External linksEdit

Template:Public transport in Queensland Template:Authority control