Southern California Edison
Template:Use mdy dates Template:Short description {{#invoke:Infobox|infobox}}Template:Template otherTemplate:Main other{{#invoke:Check for clobbered parameters|check|nested=1|template=Infobox company|cat=Template:Main other|name; company_name|logo; company_logo|logo_alt; alt|trade_name; trading_name|former_names; former_name|type; company_type|predecessors; predecessor|successors; successor|foundation; founded|founders; founder|defunct; dissolved|hq_location; location|hq_location_city; location_city|hq_location_country; location_country|num_locations; locations|areas_served; area_served|net_income; profit|net_income_year; profit_year|owners; owner |homepage; website }}{{#invoke:Check for unknown parameters|check|unknown=Template:Main other|preview=Page using Template:Infobox company with unknown parameter "_VALUE_" | ignoreblank=y | alt | area_served | areas_served | assets | assets_year | aum | brands | company_logo | company_name | company_type | defunct | dissolved | divisions | embed | equity | equity_year | fate | footnotes | former_name | former_names | foundation | founded | founder | founders | genre | homepage | hq_location | hq_location_city | hq_location_country | incorporated | image | image_alt | image_caption | image_size | image_upright | income_year | industry | ISIN | key_people | location | location_city | location_country | locations | logo | logo_alt | logo_caption | logo_class | logo_size | logo_upright | members | members_year | module | name | native_name | native_name_lang | net_income | net_income_year | num_employees | num_employees_year | num_locations | num_locations_year | operating_income | owner | owners | parent | predecessor | predecessors | production | production_year | products | profit | profit_year | rating | ratio | revenue | revenue_year | romanized_name | services | subsid | successor | successors | traded_as | trade_name | trading_name | type | website| qid | fetchwikidata | suppressfields | noicon | nocat | demo | categories }}
Southern California Edison (SCE), the largest subsidiary of Edison International, is the primary electric utility company for much of Southern California. It provides 15 million people with electricity across a service territory of approximately 50,000 square miles.Template:Efn
SCE owns all of its electrical transmission facilities and equipment. Deregulation of California's electricity market in the late 1990s forced the company to sell many of its power plants, though some were probably sold by choice.Template:Cn SCE retained its hydroelectric plants, totaling about 1,200 MW, and its 75% share of the 2,150-MW San Onofre Nuclear Generating Station. The plant, which hasn't produced power since 2012, is being decommissioned.<ref>Template:Cite news</ref><ref>Template:Cite news</ref>
In addition to its electric business, SCE operates the sole gas utility and water utility on Santa Catalina Island, under the names Catalina Island Gas Company and Catalina Island Water Company.
HistoryEdit
The origins of the company lie with the grand scheme of business magnate Henry E. Huntington and hydraulic engineer John S. Eastwood, developed around 1908, for a vast complex of reservoirs to be constructed in the Sierra Nevada Mountains of central California. Huntington founded Pacific Light and Power, one of the roughly two dozen companies he controlled at the time,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> to execute what would eventually become one of the largest hydropower systems in the United States, the Big Creek Hydroelectric Project. Pacific Light and Power was one of the predecessor companies to SCE, along with Edison Electric, Mt. Whitney Power & Electric Co., California Electric Power Co., Southern California Power Co.,<ref>Staff, "Historic Redlands Lighting System Today 50 Years Old - Street Illumination Proved Feasibility Of World's First Long Transmission Line", The San Bernardino Daily Sun, San Bernardino, California, Friday 6 August 1943, Volume 49, page 12.</ref> and others.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
In 2011, a shooting occurred when an employee of Southern California Edison opened fire at an office building in Irwindale.
Energy SourcesEdit
Renewable energyEdit
Southern California Edison allows its customer to obtain their electricity entirely from renewable sources by subscribing to a "green rate".<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
In 2006, Southern California Edison planned to secure 1,500 megawatts or more of power generated from new projects to be built in the Tehachapi Pass Wind Farm area. The contract, which more than doubles SCE's wind energy portfolio, envisions more than Template:Convert of wind parks in the Tehachapi region, which is triple the size of any existing U.S. wind farm.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
In March 2008, Southern California Edison announced a $875 million project to build a network of 250 megawatts of photovoltaic solar power generation, making it the biggest solar cell project in the nation. The photovoltaic cells will cover Template:Convert of rooftops in southern California and will generate enough power to serve 162,000 homes.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
In 2009, Southern California Edison entered into a contract with Solar Millennium to purchase solar thermal power up to 726 MW.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Southern California Edison also entered into a contract with Stirling Energy Systems to buy electricity from a 500 megawatt, 4,600 acre (19 km2), solar power plant which was due to open in 2009.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The purchase was canceled in late 2010, as changes in technology reduced the cost of photovoltaic-based solar power to below that of solar Stirling generated power.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> This would have been the first commercial application of the dish stirling system. A different technology from the more familiar solar panel, the dish concentrates solar energy by the use of reflective surfaces and by the use of the Stirling heat engine to convert the heat into electricity.
In 2014, Southern California Edison installed the Tehachapi Energy Storage Project, which is composed of more than 600,000 lithium-ion battery cells at Monolith Substation in Tehachapi, California in order to test storing power generated from an area that currently has 5,000 wind turbines.<ref>Template:Cite news</ref>
In 2014 SCE had a renewables mix of 23%.<ref>Biennial RPS Program Update Template:Webarchive Section 913.6 Report | January 2016 | Page 5. California Public Utilities Commission</ref> By 2016, 28.2% of SCE's power sources were renewable.<ref>Template:Cite news</ref>
Natural gas and energy storageEdit
In 2017, the company opened two new hybrid electric gas turbine (EGT) units called peaker plants, that combine gas turbines and storage batteries at the same site. Each plant delivers around 50-megawatts; the batteries can provide 10-megawatts and four megawatt-hours of power. Both the turbines and the batteries are designed and manufactured by General Electric’s Power Division.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
The plant runs the battery first in a series of short bursts, saving gas usage for longer power demand. The combination of a 30-minute duration battery improves the environmental impact of the gas turbine. The SCE setup (the first of its kind) cut greenhouse gas emissions by 60%, reduced annual water usage by 2 million gallons and lowered the number of gas starts by 50%.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
InterconnectionsEdit
Southern California Edison's power grid is linked to other California ISO resources by the Path 26 transmission lines that generally follow Interstate 5 over Tejon Pass. The interconnection takes place at a large substation at Buttonwillow. CAISO's and WAPA's Path 15 and Path 66, respectively, from Buttonwillow north eventually connect to BPA's grid in the Pacific Northwest. There are several other interconnections with local and out-of-state utilities, such as Path 46.
Policies and PracticesEdit
Electric vehiclesEdit
Southern California Edison has a number of resources and a rate designed specifically for electric vehicle users.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
As of July 2018, Southern California Edison planned to add thousands of new charging stations for passenger electric vehicles (EV). This addition is a component of the company's "Charge Ready" program, a pilot program with the aim of increasing the availability of charging ports for EVs.
Since 2016, Southern California Edison has installed 1,000 charging stations throughout their Southern and Central California service area.<ref>Template:Cite news</ref>
The company also runs a rebate program for electric vehicle purchases.
Energy research and policyEdit
Southern California Edison has a long history of research in the energy arena. Often this includes working with other companies and government entities. One example is the SOLARII feasibility generator, which was a solar-powered energy plant that could produce electricity 24 hours a day. This was done by heating molten salts that would hold the heat during the day and would be used to generate power at night.Template:Citation needed
Dr. John Jurewitz served as Director of Regulatory Policy for Southern California Edison for 15 years until his retirement in July 2007. His major areas of research are in oil, gas, and electricity policy and greenhouse gas regulation. He has testified and participated in government-sponsored proceedings addressing electric industry restructuring and energy policy at the state, federal, and international levels.<ref>Lutz Mez, Mycle Schneider and Steve Thomas (Eds.) (2009). International Perspectives of Energy Policy and the Role of Nuclear Power, Multi-Science Publishing Co. Ltd, p. 591.</ref><ref>Template:Cite journal</ref><ref>Template:Cite book</ref>
In November, 2014, SCE announced a partnership with Ice Energy to provide more efficient energy storage by freezing water at night when electricity is cheaper.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> (Ice Energy filed for Chapter 7 bankruptcy in December 2019.)<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Labor practice controversyEdit
In 2015, Southern California Edison laid off about 400 IT employees, with an additional 100 IT workers leaving voluntarily.<ref>Template:Cite news</ref> Meanwhile, the utility company hired immigrants from India through Infosys, based in Bangalore, and Tata Consultancy Services in Mumbai, which are among the largest users of H-1B visas.<ref>Template:Cite news</ref><ref name=cw>Template:Cite news</ref> SCE was subsequently investigated by the US Department of Labor for potential H1-B visa abuse.<ref name=scpr1>Template:Cite news</ref>
Disasters and LitigationEdit
Wildfires are an ongoing issue in California, and some major wildfires have been caused by Southern California Edison’s equipment.
LiabilityEdit
California law follows the principle of inverse condemnation, meaning that if a fire is caused by a utility’s electrical equipment, then the utility is responsible for damages even if they were not negligent in causing the fire.<ref>Template:Cite news</ref> In July 2019, the state of California created a $21 billion wildfire trust fund to pay for damage from future wildfires. Half of the $21 billion was obtained from customers, and the other half was obtained through shareholders. The fund also shifted the burden of proof for negligence in favor of utilities, so outside parties would need to prove that a wildfire was caused by a utility’s negligence (as opposed to just their equipment) to make the utility have to repay costs to the wildfire fund (up to a certain cap).<ref>Template:Cite news</ref>
1996 Calabasas FireEdit
The Calabasas Fire was a wildfire that burned in October 1996, destroying six structures, burning 13,010 acres, and threatening the campus of Pepperdine University.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> During the subsequent investigation, Edison refused to provide certain documents to Cal Fire investigators. Suspecting that these documents might reveal more information, Cal Fire had one of their investigators pose as an architecture student to gain entry to Edison’s office and develop floor plans for a raid.<ref name=“GoldbergMarch2025”>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Investigators ultimately found that Edison’s equipment had started the fire. The Los Angeles County District Attorney’s office investigated the possibility of criminal conduct and concluded that while Edison had not been diligent in monitoring the trees near its power lines and that it had destroyed evidence during the investigation into the cause of the fire, its conduct did not rise to the level of criminality.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Following the raid, Edison and the government also entered an agreement on future procedures for investigations on wildfire causes.<ref name=“GoldbergMarch2025” />
Creek Fire (2017)Edit
{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} Template:For
The Creek Fire was a wildfire that burned in Los Angeles from December 5, 2017 to January 9, 2018. It destroyed 123 structures.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Initially, scrutiny fell on the Los Angeles Department of Water and Power (LADWP) for causing the fire, and they were sued by over 300 fire victims and the federal government.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> However, it was discovered during the litigation process that at the time of the initial investigation, SCE had provided incomplete data. Specifically, SCE had provided data for its equipment on December 4 but not December 5 (the day the fire started), and the new data for December 5 revealed that an electrical fault had taken place at the time that the Creek Fire started. In light of this new data, a federal investigator concluded that the Creek Fire had been caused by SCE’s equipment. The federal government is currently suing SCE for both causing the fire and withholding evidence. The government also alleges that SCE violated the agreement they made following the 1996 Calabasas fire and intentionally pinned the blame on the LADWP. SCE denies all of these allegations, including that they started the fire, claiming that the only reason they provided data for the wrong day was because of a mistake made by one of their employees early in the process.<ref name=“GoldbergMarch2025” />
Thomas FireEdit
{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}
The Thomas FireTemplate:Efn was a wildfire that burned in Ventura County and Santa Barbara from December 2017 to January 2018. It destroyed over 1,000 structures and killed two people, as well as destabilized the soil, which led to mudflows in Montecito that killed 23 people and destroyed over 100 homes.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite news</ref><ref>Template:Cite news</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> An official investigation concluded that Edison’s equipment was responsible for starting both the Koenigstein Fire and the Thomas Fire.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Edison paid over $2.7 billion in settlements related to the fire and mudslides.<ref name=“PetersenRateHike”>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
On January 30, 2025, the California Public Utilities Commission (CPUC) unanimously approved SCE’s request to raise their rates to cover over $1.6 billion in payments made to Thomas Fire victims. This was opposed by numerous residents of Los Angeles, who argued that customers who had already been affected by wildfires should not have to bear responsibility for Edison’s mistakes, and that the decision would fail to hold Edison accountable and lead to further inaction on their part. Seven state legislatorsTemplate:Efn also wrote a letter to the head of the CPUC expressing opposition to the rate hike. In return, Edison asserted that while the fire had been caused by their equipment, they had not been negligent in causing the fire, and they would spread the costs over 30 years to minimize the financial impact on customers.<ref name=“PetersenRateHike” />
Woolsey FireEdit
{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}
The Woolsey Fire was a wildfire that burned in Los Angeles County and Ventura County in November 2018, destroying 1,643 structures and killing three people.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In 2020, the CPUC released a report concluding that the fire was caused by Edison’s electrical equipment. Edison later paid $2.2 billion in settlements related to the fire.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
The California Department of Justice investigated the possibility of filing criminal charges against SCE but ultimately decided not to, finding that while SCE’s equipment and poor vegetation control had led to the fire, their conduct did not rise to the level of criminality.<ref name=“ChildsDiskin”>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The decision not to prosecute was praised by SCE, which emphasized its ongoing commitment to reducing wildfire risk, but was criticized by attorneys representing fire victims.<ref name=“ChildsDiskin” /> Politico later reported that just days before this announcement, California Attorney General Rob Bonta had received a $72,500 donation from SCE. A spokesperson for Bonta said that this was caused by a miscommunication and that Bonta would return the money.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Eaton FireEdit
{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}
The Eaton Fire was a wildfire that burned in the Eaton Canyon of the San Gabriel Mountains in January 2025 and spread into nearby foothill communities, most notably Altadena. It killed 18 people and destroyed over 9,000 buildings, making it the second most destructive wildfire in California history.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite news</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
The cause of the Eaton Fire is still under investigation, but witness reports and video evidence have connected it to transmission lines owned by Edison in the Eaton Canyon, and Edison has reported that a fault on its lines occurred at around the time the fire started.<ref name=“Kimball”>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The Los Angeles Times reported that several months prior, regulators had criticized Edison for falling behind in inspecting transmission lines in high-risk areas and for failing to find dangerous problems in inspections.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Furthermore, in the three years leading up to the fire, regulators had criticized Edison’s practice of checking wind speed every ten minutes, arguing that this could fail to capture the severity of a situation and miss high gusts, in contrast to other nearby utilities that check wind speed every thirty seconds.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In response, Edison has highlighted the existing work they have done to reduce wildfire risk, cautioned against jumping to conclusions, and suggested that a nearby homeless encampment may have been responsible for starting the fire.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> They also stated that they believe they acted prudently even if their lines were responsible for the fire.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Lawyers representing fire victims have also criticized Edison for re-energizing the power lines under suspicion in mid-January; they argued that this was done to destroy physical evidence linking their equipment to the fire, while Edison argued that it was a necessary step to return power to customers.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Some victims of the fire, including people who lost homes and families of people who died in the fire, have sued SCE. Four lawsuits were filed on January 13, alleging that the company had “violated public safety and utility codes and was negligent in its handling of power safety shut-offs”.<ref>Template:Cite news</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> On January 16, the family of a person who died in the fire sued SCE for wrongful death, also alleging negligence in SCE's failure to deactivate utilities despite a red flag warning being issued due to fast Santa Ana winds.<ref>Template:Cite news</ref> Los Angeles County, Pasadena, and Sierra Madre also announced plans to sue Edison.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
NPR has reported that while the fire was ongoing, Edison reactivated power lines despite firefighters requesting they keep them off. This resulted in downed power lines sparking new fires.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>
Other FiresEdit
Edison’s equipment has also been found to be the cause of other fires, including the 2007 Malibu Canyon Fire,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Liberty Fire,<ref name=“Smith2021”>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Meyers Fire,<ref name=“Smith2021” /> Rye Fire,<ref name=“Smith2021” /> Easy Fire,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Bobcat Fire,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Silverado Fire,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Coastal Fire,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> the Fairview Fire,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> and possibly also the Hurst Fire.<ref name=“Kimball” />
See alsoEdit
- Energy use in California
- Solar power plants in the Mojave Desert
- Wind power in California
- List of articles associated with nuclear issues in California
NotesEdit
ReferencesEdit
External linksEdit
- Southern California Edison website
- SCE Launches 250-MW Solar Project
- Southern California Edison’s Electric Vehicle (EV) Technical Center Template:Webarchive in Pomona, California
- Template:HABS
- Template:HAER
- Template:HAER
- Template:HAER
Template:Authority control Template:Electric Utilities in CA