Taiwan High Speed Rail (THSR) is the high-speed railway network in Taiwan, which consists of a single line that runs approximately Template:Convert along the western coast of the island, from the capital Taipei in the north to the southern city of Kaohsiung. With construction and operations managed by a private company, Taiwan High Speed Rail Corporation (THSRC), which also operates the line, the total cost of the project was Template:Ntd billion in 1998.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The system's technology is based primarily on Japan's Shinkansen.

The railway opened for service on 5 January 2007, with trains running at a top speed of Template:Convert, currently running from Nangang to Zuoying in as little as 1 hour and 45 minutes, reaching almost 90% of Taiwan's population. Most intermediate stations on the line lie outside the cities served; however, a variety of transfer options, such as free shuttle buses, conventional rail, and metros have been constructed to facilitate transport connections.

Ridership initially fell short of forecasts, but grew from fewer than 40,000 passengers per day in the first few months of operation to over 129,000 passengers per day in June 2013.<ref name="tt-1stdr">Template:Cite news</ref> Daily passenger traffic reached 130,000 in 2014, well below the forecast of 240,000 daily passengers for 2008.<ref name=NAR>Template:Cite news</ref> The system carried its first 100 million passengers by August 2010 and over 200 million passengers had taken the system by December 2012,<ref>Template:Cite press release</ref> followed by 400 million by December 2016.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> THSR, or railways in general, is only located on the main island of Taiwan. Outer islands under the control of the ROC government including Penghu, Kinmen, and Matsu do not have railways.

In the initial years of operation, THSRC accumulated high debts due to high depreciation charges and interest, largely due to the financial structure set up for the private company. In 2009, THSRC negotiated with the government to change the method of depreciation from depending on concessions on rights to ridership.<ref>Template:Cite news</ref> At the same time, the government also started to help refinance THSRC's loans to assist the company so it could remain operational and profitable.<ref name="THSRC_IRJ">Template:Cite news</ref> The government injected NT$30 billion as a financial bailout, boosting the government's stake to about 64% from about 37%.<ref name=NAR/> The government also extended the rail concession from 35 years to 70 years and terminated the company's build-operate-transfer business model.<ref>Template:Cite news</ref>

HistoryEdit

Taiwan's rapid economic growth during the latter half of the twentieth century led to congestion of highways, conventional rail, and air traffic systems in the western transport corridor, which threatened to impede the region's development.<ref name="NEXI">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="albalate">Template:Cite book</ref>Template:Rp The idea of a new high-speed rail line arose in the 1970s,<ref name="NEXI" /> and informal planning began in 1980.<ref name="nytcontroversy">Template:Cite news</ref> In 1987, the executive branch of Taiwan's government, the Executive Yuan, instructed the Ministry of Transportation to launch a feasibility study for a high-speed rail line in the western Taiwan corridor,<ref name="NEXI" /> which was completed in 1990.<ref name="JRTR">Template:Cite journal</ref> The study found that in a comparison of potential solutions to traffic problems in the corridor, a high-speed rail line would offer the highest transit volume, lowest land use, highest energy savings, and least pollution.<ref name="NEXI" /> In July 1990 the Preparation Office of High Speed Rail (POHSR) was established<ref name="NEXI" /> and a route was selected in 1991.<ref name="nytcontroversy" /> Plans for the THSR were subsequently approved by the Executive Yuan in June 1992<ref name="NEXI" /> and by Taiwan's legislature, the Legislative Yuan, in 1993.<ref name="JRTR" />

Build-Operate-TransferEdit

File:Eurotrain München Laim.jpg
The 1998 Eurotrain demonstrator train in Germany. Originally Eurotrain was the preferred technology – German ICE motive power and French TGV rolling stock – but following the ICE disaster at Eschede and a soft loan offer from the Japanese Government, Shinkansen technology was adopted.

In November 1994, Taiwan passed a law regarding the use of private finance in infrastructure projects, which also applied to the up-to-then state-run THSR project.<ref name="NEXI" /> Consequently, in 1995, POHSR was transformed into the Bureau of High Speed Rail (BOHSR), which started to tender THSR as a build-operate-transfer (BOT) scheme in October 1996.<ref name="NEXI" /><ref name="JRTR" />

The bidding process pitted Taiwan High Speed Rail Consortium (THSRC) against the Chunghwa High Speed Rail Consortium (CHSRC). THSRC's bid was based on the high-speed technology platform of Eurotrain, a joint venture between GEC-Alsthom, the main maker of the French TGV, and Siemens, the main maker of the German ICE, while CHSRC's bid was based on Japanese Shinkansen technology supplied by Taiwan Shinkansen Consortium (TSC), a joint venture of Japanese companies.<ref name="TJ_prefbid">{{#invoke:citation/CS1|citation |CitationClass=web }}Template:Dead link</ref> THSRC, which submitted the lower bid and promised to build the line with zero net cost from the government, was chosen as the preferred bidder in September 1997.<ref name="TJ_prefbid"/> The group was renamed and formally established as the Taiwan High Speed Rail Corporation (THSRC) in May 1998.<ref name="THSRC_abstock">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> THSRC and the government signed the BOT agreement on 23 July 1998.<ref>Template:Cite news</ref>

However, controversy arose during rolling-stock selection. In May 1999, as THSRC faced difficulties in raising capital, the government of Japan promised soft loans if THSRC switched to TSC.<ref name="Shinkansen Hope">Template:Cite news</ref> Although Eurotrain promised to match TSC's financial proposal, the Eschede train disaster in combination with TSC offering the newer 700 Series Shinkansen, convinced THSRC to reopen its core system bid, ultimately resulting in TSC selected as the preferred rolling-stock supplier in December 1999. Although Eurotrain eventually conceded in the bid, in February 2001 it filed for a US$800 million damage claim against THSRC at the Singapore International Arbitration Centre. After a lengthy arbitration process, the court ruled in March 2004 that THSRC should pay a compensation for the US$32.4 million Eurotrain spent on development and US$35.7 million for unjust enrichment.<ref name="AG_SingaporeRulesEurotrain">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> THSRC agreed to pay US$65 million (US$89 million with interest) to Eurotrain in November 2004.<ref name="TT_TpayEu">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

ConstructionEdit

Construction of the line by THSRC officially started in March 1999.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Tunnels and other major civil engineering works were completed by 2004,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> along with the first delivery of the 700T trains.<ref name=":2">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Testing and commissioning of the line then took place in 2005 and 2006,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> with a maximum testing speed of Template:Convert achieved in October 2005.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

OpeningEdit

File:TaiwanHighSpeedRail Route Map 2022.png
Taiwan High Speed Rail map, as of 2022

The railway was opened in 2007,<ref>Template:Cite news</ref> with limited commercial services between Banqiao and Zuoying stations from 5 January,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> with full service from Taipei Station to Kaohsiung from May 2007.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Three additional stations located along the line – Miaoli, Changhua and Yunlin – opened in 2015.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Future plansEdit

Southern extensionEdit

On 10 September 2019, the Executive Yuan announced that the railway would be expanded to Pingtung. Out of four proposed route options, it was confirmed on 27 September that the expansion would bypass central Kaohsiung, branching from Zuoying east towards western Pingtung City, near Template:Stl, with an estimated cost of NT$55.4 billion. Although lowest in cost, the option was met with criticism regarding its economic benefits.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The extension to Pingtung was approved by Premier Su Tseng-chang in January 2023, with opening of the extension planned for 2029.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

On 28 December 2024, Executive Yuan announced that the extension route would be altered to pass through the city centre with a stop at Kaohsiung Main Station.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Northern extensionEdit

The line was extended Template:Cvt from Taipei to Nangang, opening in July 2016.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

On 25 October 2019, the Railway Bureau published an assessment report to extend the line further from Taipei to Yilan, cutting travel time to 13 minutes.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The Template:Cvt extension was approved in October 2020,<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> and is planned to open by 2030.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Rolling stockEdit

THSR 700TEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}}

File:THSR 700T Front view.jpg
Nose profile of the 700T train

Taiwan High Speed Rail started operation with 30 THSR 700T trainsets supplied by a consortium led by Kawasaki Heavy Industries.<ref name=":2" /><ref name="khi-700T">Template:Cite journal</ref> In response to increasing ridership and new stations that would begin operation in 2015, THSRC signed the contract for four new 700T trainsets with the Kawasaki consortium in May 2012 in Tokyo, Japan.<ref name="TTextratrains">Template:Cite news</ref><ref>Template:Cite news</ref> The first (TR 31) trainset was delivered to Taiwan on 23 December 2012; the second (TR 32) on 21 January 2013; the third (TR33) on 25 January 2014; the fourth (TR34) on 12 August 2015.<ref>Template:Cite press release</ref><ref>Template:Cite news</ref>

The THSR 700T trainset is based on the 700 Series Shinkansen trainset used by JR Central and JR West in Japan.<ref name="UIC-700T" /> This marked the first time Shinkansen technology was exported to a foreign country,<ref name="THSRC_abcomp">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> and it involved "rolling stock derived from a JR Central design running on both the European and Japanese track systems."<ref>Template:Cite journal</ref> Customization was focused on adapting to Taiwan's climate and geography, and the nose shape was optimized for tunnels wider than those in Japan.<ref name="khi-700T" /><ref name="UIC-700T">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name="rt-thsr" />

The maximum service speed of the trains was raised from the 700 Series Shinkansen's Template:Convert.<ref name="rt-thsr" /> The 12 cars of a 700T train are grouped in three traction units with three power cars and one trailer each,<ref name="UIC-700T" /> providing Template:Cvt of power;<ref name="thsrc-700T" /> both end cars are trailers to avoid slip on powered bogies.<ref name="UIC-700T" /> The train is Template:Convert long and has a mass of Template:Convert when empty.<ref name="thsrc-700T">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> The trains have a passenger capacity of 989 seats in two classes: 66 seats in 2+2 configuration in the single Business Car and 923 seats in 2+3 configuration in the eleven Standard Cars.<ref name="khi-700T" /> The per capita energy consumption of a fully loaded 700T train is 16% of that of private cars and half that of buses; carbon dioxide emissions are 11% of private cars and a quarter that of buses.<ref name="JRTR" />

N700SEdit

{{#invoke:Labelled list hatnote|labelledList|Main article|Main articles|Main page|Main pages}} In the late 2010s, THSRC began work to purchase additional high speed trains, in light of growing demand.<ref name=":3">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> 12 trains would be ordered, at a cost of around NT$30 billion.<ref name=":3" /> Due to the limited number of Japanese companies who build Shinkansen rolling stock, it took several years for THSRC to agree an acceptable deal.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name=":4">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In 2022, it was reported that THSRC was speaking to European train manufacturers instead, as the price offered by Japanese companies was "unreasonable".<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

In March 2023, it was announced that a joint bid by Hitachi and Toshiba had been awarded the contract. Twelve of the latest generation of Shinkansen train—the N700S Series—would be delivered at a cost of NT$28 billion.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref name=":4" />

Engineering trainsEdit

File:DD16 20 THSRMWS 1.jpg
The DD16 locomotive as used by THSRC
File:TSHR Structure Gauge Test Car 02.jpg
The former 0 series end car used for clearance checking

THSRC uses overhead line inspection trains from Windhoff, Harsco railgrinders, Plasser & Theurer track tampers, and several ex-JR rolling stock to maintain its line.<ref>Template:Cite book</ref> Among the latter include the JNR Class DD14 and JNR Class DD16 diesel-hydraulic locomotives, which were originally used for snowploughing by JR. The two ex-JR locomotives with THSRC are equipped with Shinkansen-style rotary couplers and standard-gauge bogies instead of the original Template:Track gauge gauge bogies and knuckle couplers and are used for shunting the 700T trainsets within the depot. THSRC also uses a former 0 Series Shinkansen end car as a structure gauge test car.

OperationEdit

As the first high speed railway system in Taiwan, THSRC started operation in 2007 with many foreign employees, including French and German train drivers and operation controllers in the Operation Control Center (OCC).<ref>Template:Cite news</ref> At the same time, THSRC also started to train local drivers and controllers. Since May 2008, all controllers working in the OCC have been Taiwanese, and since October 2008, all train drivers have been Taiwanese.<ref>Template:Cite news</ref>

The OCC's main responsibility is to maintain safe train operations. THSRC has 132 controllers (July 2012), of which about one quarter are female, working 24 hours per day and 365 days per year in the OCC. Requirements for becoming a Chief Controller (主任控制員) include experience in all nine OCC positions, 300-hours of on-the-job training and acquiring qualification.<ref name="THSRC_OCC">Template:Cite news</ref>

THSRC has 144 drivers (July 2012), of which almost 10% are female. All driver candidates must spend 8 months completing 1,326 hours of professional training and pass the National Certification before they can drive the train. In addition, after becoming a certified high-speed train driver, they undergo further on-the-job training at least three times each year in order to guarantee they can drive the train safely.<ref name="THSRC_OCC" />

Natural disastersEdit

Taiwan frequently faces multiple types of natural disasters, including typhoons, earthquakes, heavy rainfall, floods, and landslides. For this reason, a primary focus of THSRC's infrastructure design was how to respond to natural disasters such as earthquakes<ref name="NCDR">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> and how to ensure safety for all passengers and trains in any emergency situation.<ref name="THSRC_DWS">Template:Cite news</ref>

THSRC has established a system to respond to natural disasters and unexpected intrusion onto the right-of-way, called DWS (Disaster Warning Systems).<ref name="THSRC_DWS" /> This system consists of a network of sensors installed along the rail route to detect unexpected situations such as earthquakes, strong winds, heavy rainfall, floods, landslides, and intrusions. In case of an unexpected situation, the DWS will send signals to the OCC (Operation Control Center) immediately; it will also activate contingency measures to ensure the safety of the passengers and trains, including decelerating or stopping trains in the affected area.<ref name="NCDR" />

The DWS has functioned successfully since its initial operation in 2007. The most powerful earthquake that THSRC has experienced measured 6.4 on the Richter Scale with an epicenter Template:Cvt from Jiaxian, Kaohsiung that shook southern Taiwan on 4 March 2010 (甲仙地震). One operating train was slightly derailed in Sinshih, Tainan, and six trains were stopped on the track. In spite of the temporary suspension of operations, there was no damage or casualties. All 2,500 affected passengers were evacuated in two hours without injury. Service resumed the next day.<ref name="THSRC_IRJ"/> Such a record was well noted, and provided valuable experience in operational safety to the global railway industry.<ref name="THSRC_IRJ"/>

In April 2010, it was reported that subsidence had been observed during construction on a Template:Convert viaduct section in Yunlin County.<ref>Template:Cite news</ref> The subsidence continued, reaching up to Template:Convert over seven years.<ref name="subsided-viaduct">Template:Cite news</ref> By 2010 subsidence had slowed, which was ascribed to the closure of some deep groundwater wells operating in the region. Although the situation was deemed safe with differential settlement between adjacent piers along the viaduct at only a sixth of the permissible level, the BOHSR urged the closure of more wells.<ref name="subsided-viaduct" /><ref name="subside_map">Template:Cite journal</ref> On 25 July 2011, the government announced plans to close almost 1,000 wells in Changhua and Yunlin counties, reducing the amount of water pumped from deep wells by Template:Convert by 2021.<ref>Template:Cite news</ref>

ServiceEdit

File:Taiwan High Speed Rail 0296.JPG
Standard Car riders on a northbound train

According to THSR's July 2018 timetable,<ref name="auto1">Template:Cite news</ref> there are 989 train services per week of operation, with operation times between 05:50 to 24:00 every day. Most southbound trains originate from Nangang station and most northbound trains originate from Zuoying; however, a few trains operate just between Nangang and Taichung or between Taichung and Zuoying. Southbound trains are designated by odd train numbers, and northbound trains by even train numbers.<ref name="THSRC_timetable" />

Each train consists of 1 business car (car 6) and 11 standard cars (including reserved seats and non-reserved seats). Since July 2010, non-reserved seats are available in cars 10 through 12 (some trains available in cars 9 through 12 or available in cars 8 through 12 ). Car 7 of each train is fitted with 4 wheelchair accessible chairs and a disabled-friendly restroom. Passengers can call THSR's Customer Service Hot Line at (Taiwan) 4066-3000 or visit any THSR station ticket window to reserve these seats.<ref name="THSRC_timetable" />

By August 2012, implementation of 4G WiMAX on-board trains is expected to provide smooth wireless broadband services, making THSR the first high-speed ground transportation system equipped with this service.<ref>Template:Cite news</ref>

In 2012, THSRC rated highly in the CommonWealth Magazine (天下雜誌) "Golden Service Award survey" (金牌服務大賞), not only far outpacing all rivals in the "long-distance land transport" category, but also taking the top spot in the overall rankings of 300 industries.<ref>Template:Cite news</ref>

Local connectionsEdit

To improve local public transit connections to THSR stations, the TRA built two new spur lines branching off from West Coast Line.

Code Name Chinese Taiwanese Hakka Connecting services and Notes citation CitationClass=web

}}</ref><ref>{{#invoke:citation/CS1|citation

CitationClass=web

}}</ref>!!Type<ref name="JRTR"/>!!colspan=2|Location

Template:Mono 01 Nangang Template:Large Lâm-káng Nàm-kóng Template:Rint West Coast Line Template:Small
Template:Rint Template:Rint Template:Small
3.2 underground Nangang Taipei
Template:Mono 02 Taipei Template:Large Tâi-pak Thòi-pet Template:Rint West Coast Line Template:Small
Template:Rint Template:Rint Template:Small and Template:Rint Template:Small
Template:Rint Template:Rint Template:Small 200 m
6.1 underground Zhongzheng
Template:Mono 03 Banqiao Template:Large Pang-kiô Piông-khièu Template:Rint West Coast Line Template:Small
Template:Rint Template:Rint Template:Small and Template:Rint Template:RintTemplate:Small
13.1 underground Banqiao New Taipei
Template:Mono 04 Taoyuan Template:Large Thô-hn̂g Thò-yèn Template:Rint Template:Rint Template:Small
Airport Shuttle Bus
42.3 underground Zhongli Taoyuan
Template:Mono 05 Hsinchu Template:Large Sin-tek Sîn-tsuk Template:Rint Liujia Line Template:Small 72.2 elevated Zhubei Hsinchu
Template:Mono 06 Miaoli Template:Large Biâu-le̍k Mèu-li̍t Template:Rint Taichung Line Template:Small 104.9 elevated Houlong Miaoli
Template:Mono 07 Taichung Template:Large Tâi-tiong Thòi-chûng Template:Rint Taichung Line Template:Small
Taichung Metro: Template:Rint Template:Small
165.7 elevated Wuri Taichung
Template:Mono 08 Changhua Template:Large Chiong-hoà Chông-fa 193.9 elevated Tianzhong Changhua
Template:Mono 09 Yunlin Template:Large Hûn-lîm Yùn-lìm 218.5 elevated Huwei Yunlin
Template:Mono 10 Chiayi Template:Large Ka-gī Kâ-ngi Template:Rint Chiayi BRT 251.6 elevated Taibao Chiayi
Template:Mono 11 Tainan Template:Large Tâi-lâm Thòi-nàm Template:Rint Shalun Line Template:Small 313.9 elevated Gueiren Tainan
Template:Mono 12 Zuoying Template:Large Chó-iâⁿ Chó-yàng Template:Rint West Coast Line Template:Small
Template:Rint Template:Rint Template:Small
345.2 ground level Zuoying Kaohsiung

Stop patternsEdit

With a few exceptions, the services follow the below pattern.

CodeTemplate:Efn NumberTemplate:Efn Category Nangang Taipei Banqiao Taoyuan Hsinchu Miaoli Taichung Changhua Yunlin Chiayi Tainan Zuoying Service proportion
D 6xx, 16xx Semi-Fast Train (Frog Mode) Template:Efn 36.0%
F 8xx, 18xx Stopping Train 22.7%
B 1xx, 11xx Fast Train (Direct to Zuoying) 20.5%
B' 2xx, 12xx Fast train (Call at Tainan Mode) Template:Efn Template:Efn Template:Efn 9.2%
E 5xx, 15xx Stopping Train (Local Mode)Template:Efn  N/A 8.5%
583, 598, 1588  N/A 0.2%
C 295, 300, 333, 13xx Taoyuan Airport Express TrainTemplate:Efn Template:Efn Template:Efn 2.9%
A 0xx, 10xx Super-Fast Train Reserve in Future
as of July 2019; ●: Trains stop at station; ○: Section trains stop at station; ▲: Section Trains skip station; -: Trains skip station

Ticket fare and discountEdit

File:2011 THSRC Early Brid Event-2.jpg
THSRC Early Bird Ticket Promotion Event, 2011

As of January 2018, a one-way Taipei–Zuoying trip, a THSR standard car adult ticket is NT$1490, and a business car ticket fare is NT$1950.<ref name="THSRC_timetable" /> The cost of a non-reserved seat is approximately 3% less than the regular price. Business and standard car reserved ticket reservations are available 28 days prior to the date of departure (including the departure day).<ref name="THSRC_timetable" />

Senior citizens (Taiwan citizens above 65 years of age), registered disabled persons plus one accompanying passenger (Taiwan citizens only), and children (passengers under 12 years of age) are eligible for concession (half price) tickets.<ref name="THSRC_timetable">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

A group discount is offered for groups of 11 or more. A group discount cannot be used in combination with other discount offers and does not include non-reserved seats. Passengers eligible for multiple discounts can only choose one discount offer.<ref name="THSRC_timetable" /><ref name="outlook-freqdia">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Since 1 July 2010, a smart card system has provided frequent travelers with multi-ride (eight trips) or periodic tickets. THSR's contact-less smart cards allow the cardholder to travel between specific stations within a given time period for a certain number of rides. The card is sold in either registered (name-bearing) or non-registered form. Only adult tickets are available in this format, and cannot be used for rides between Banqiao and Taipei.

After purchasing or adding value to a multi-ride card, the card balance is valid for 45 days counted from the day of first use. The ticket is good for 8 rides. The multi-ride card provides a discount of about 21% off the full fare of a reserved Standard Seat. Non-registered and registered multi-ride tickets can be purchased at the ticket windows of all THSRC stations. Upon first purchase of a multi-ride ticket, a card deposit fee of NT$100 is required (refundable if the card is returned). The registered multi-ride ticket is limited to personal use by the registered cardholder.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>Template:Cite press release</ref> Since November 2012, an Early Bird discount of 35% has been offered for a limited number of tickets sold no later than 8 days before the departure date. If the 35% off tickets sell out before the deadline, tickets with a discount of 20% off are offered. If these tickets sell out before the deadline, tickets with a discount of 10% off are offered. If all early bird tickets are sold out, then full fare tickets are offered.<ref name="early_bird">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Train frequencyEdit

File:THSRC frequency.png
Daily, weekly frequency of normal scheduled THSRC train services. Extra trains during holidays and cancellations due to extraordinary events not shown.
citation
CitationClass=web

}}</ref>

Direction Trains per day Trains per week
Mon Tue Wed Thu Fri Sat Sun
Southbound 63 64 82 75 76 488
Northbound 69 68 80 70 86 509
Both directions 132 162 145 162 997

THSRC operates additional train services during national holidays.<ref name="2008apr6record">Template:Cite news</ref> On 29 June 2011, a proposal by THSRC to increase the maximum number of train services to 210 per day (compared to the existing 175 per day) passed an environmental impact assessment, increasing the number of possible services on "high-load days".<ref>Template:Cite news</ref>

RidershipEdit

File:THSRC ridership daily.png
Monthly averages of daily THSRC ridership

Original estimates predicted a daily ridership of 180,000 after launch, growing to 400,000 by 2036.<ref name="Tah_orig-est">Template:Cite newsTemplate:Dead link</ref> In view of a 50% drop in airline passengers in the wake of the 1997 Asian financial crisis, forecasts were revised downwards.<ref name="JRTR" /> The final initial ridership estimate was 140,000 passengers per day.<ref>Template:Cite newsTemplate:Dead link</ref> Actual initial ridership did not match these projections. In September 2007, six months after opening, THSRC carried 1.5 million passengers monthly,<ref name="10mil" /> translating to about 50,000 passengers daily. In the second year, passenger numbers almost doubled.<ref name="THSRC2ndYear">Template:Cite press release</ref> In the third year, average daily ridership continued to grow to 88,000 passengers per day, jumping to over 120,000 passengers per day in 2012. (updated to September 2012)<ref name="ft-2010">Template:Cite news</ref><ref>Template:Cite news</ref> Seat occupancy was around 45% in the first three years, with a modest improvement achieved in 2009, and reached 53.91% in 2012. (updated to September 2012)<ref name="seatocc">Template:Cite press release</ref> Punctuality is stable above 99%.<ref name="ridership">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

citation
CitationClass=web

}}</ref>

Year Ridership Seat-km Passenger-km Seat occupancy(%): Train-km Passenger Car km Punctuality
(less than 5 mins)
2007 15,558,356 7,838,644,289 3,520,173,426 44.91 7,925,828 95,109,936 99.47%
2008 30,581,261 15,089,499,008 6,566,119,575 43.51 15,257,330 183,087,960 99.19%
2009 32,349,260 14,821,653,184 6,863,960,208 46.31 14,986,505 179,838,060 99.25%
2010 36,939,596 15,296,119,539 7,491,019,590 48.97 15,466,248 185,594,976 99.21%
2011 41,629,303 15,781,051,602 8,147,869,493 51.63 15,956,574 191,478,888 99.87%
2012 44,525,754 15,829,068,364 8,641,573,257 54.59 16,005,125 192,061,500 99.40%
2013 47,486,229 15,858,327,738 9,118,060,276 57.50 16,034,710 192,416,520 99.38%
2014 48,024,758 16,167,495,855 9,235,162,292 57.12 16,347,317 196,167,804 99.61%
2015 50,561,954 16,186,948,588 9,654,960,687 59.65 16,366,984 196,403,808 99.66%
2016 56,586,210 16,512,526,628 10,488,339,832 63.52 16,696,185 200,354,220 99.43%
2017 60,571,057 17,040,173,121 11,103,358,620 65.16 17,229,700 206,756,400 99.72%
2018 63,963,199 17,249,709,128 11,558,787,218 67.01 17,441,565 209,298,780 99.43%
2019 67,411,248 17,629,990,176 11,994,452,919 68.03 17,826,078 213,912,936 99.88%
2020 57,238,942 17,407,300,140 9,912,062,318 56.94 17,626,356 211,516,272 99.72%
2021 43,459,558 15,175,274,282 7,568,787,566 49.88 15,532,523 186,390,276 98.75%
2022 54,162,008 17,516,589,784 9,338,060,508 53.31 17,928,956 215,147,472 99.47%
2023 73,086,668 17,779,654,904 12,564,568,569 70.67 18,198,214 218,378,568 99.57%

Template:Graph:Chart Template:Graph:Chart

The 10-millionth passenger was carried after 265 days of operation on 26 September 2007,<ref name="10mil">Template:Cite news</ref> while the 100-millionth passenger was carried after 1,307 days on 3 August 2010,<ref>Template:Cite press release</ref> and 200-millionth by December 2012.<ref name="focustw"/> On 10 October 2011, the Double Ten Day holiday, THSRC transported a single-day record of 189,386 passengers. On 5 February 2011, the third day of Chinese New Year’s celebration, a new record of 190,596 passengers was achieved. The next single-day record was reached on 25 January 2012, also the third day of Chinese New Year's celebration, at 191,989 passengers. The most recent record is 212,000 passengers transported on 1 January 2013.<ref name="focustw">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The high-speed trains have successfully out-competed planes: by August 2008, half of the air routes between Taipei and the country's western cities had been discontinued, including all connections between cities with THSR stations except for a single daily connection between Taipei and Kaohsiung.<ref name="railvsair_TJ" /><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Total domestic air traffic was expected to be halved from 2006 to 2008,<ref name="railvsair_TJ">Template:Cite news</ref> and actually fell from 8.6 to 4.9 million.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> In June 2012, officials announced the discontinuation of the last remaining commercial flight between Taipei and Kaohsiung.<ref>Template:Cite news</ref> The share for conventional rail between Taipei and Kaohsiung fell from 9.71% in 2006 to 2.5% in 2008, while high-speed rail became the most common mode of transport at 50% of all trips by 2008.<ref>Template:Cite journal</ref> The opening of THSR led to a 10% reduction of traffic on the parallel expressway in 2007.<ref name="KaWh_07">Template:Cite news</ref> Despite cheaper ticket prices, long-distance bus companies reported that passenger volumes had fallen by 20 to 30 percent by 2008.<ref>Template:Cite news</ref>

InfrastructureEdit

File:THSR 700T to Bagua Plateau 20080207.jpg
About 70 percent of the line is on viaducts. Track is almost entirely ballastless on concrete, with components that limit noise emission.

Construction of the system took more than 2,000 professional engineers from 20 countries and over 20,000 foreign and domestic workers six years to complete.<ref name="CP_records">Template:Cite news</ref> Construction work was broken into several specialized lots that were contracted separately.<ref name="thsrc-93">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> One group of contracts was for civil works, covering the construction of the superstructure of open line sections.<ref name="thsrc-93" /> Stations and depots were the subject of separate groups of construction contracts.<ref name="thsrc-93" /> A fourth group of contracts was for track work.<ref name="thsrc-93" /><ref name="thsrc-2011">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

The Taiwan North-South High Speed Rail Project was awarded the first prize for the Outstanding Civil Engineering Project Award by the Asian Civil Engineering Coordination Council (ACECC) in Sydney in 2010.<ref>Template:Cite news</ref>

In 2011, the Public Construction Commission (公共工程委員會) organized an on-line voting campaign that garnered over 330,000 votes, to select the 100 best infrastructure projects (百大建設) in Taiwan to celebrate the centennial of the Republic; Taiwan High Speed Rail topped the list.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

TrackEdit

File:Taiwan-HighSpeedRail-700T-testrun-2006-0624.jpg
THSR train on a test run in June 2006. About 61 km (18 per cent of the route) is in tunnels; a large Template:Convert tunnel cross-section, as seen here, reduces sudden changes in air pressure experienced by passengers.

Reflecting a design speed of Template:Convert,<ref name="PBN_supstruct" /> track layout was designed with a minimum curve radius of Template:Convert, track-centre distance of Template:Convert,<ref name="JRTR" /> right-of-way width of Template:Convert, and a maximum gradient of 2.5%, except for 3.5% at one location.<ref name="IRJ_02" /> All but Template:Convert of track is ballastless,<ref name="rt-thsr" /> combining slab track of Japanese manufacture on open line sections with switches from a German supplier.<ref name="KN_JapEur" /><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Track laying began in July 2003.<ref>Template:Cite news</ref> The line was electrified with the 25 kV/60 Hz AC system.<ref name="PBN_supstruct" /> The signalling and train control system was laid out for bi-directional operation according to European specifications.<ref name="KN_JapEur" /> Each track section has a checkpoint, and an automatic control system ensures that trains are spaced at least Template:Convert apart to prevent collisions.<ref>Template:Cite newsTemplate:Dead linkTemplate:Cbignore</ref>

Most of the line is elevated.<ref name="PBN_supstruct">Template:Cite journal</ref><ref name="CT_tunnels04">Template:Cite news</ref> About Template:Convert or 73% of the line runs on viaducts,<ref name="PBN_supstruct" /> mostly precast pre-stressed concrete box girder spans,<ref name="CT_tunnels04" /> the first of which was put in place in October 2001.<ref>Template:Cite news</ref>

The Changhua-Kaohsiung Viaduct is a Template:Convert continuous section from Baguashan (八卦山) in Changhua County to Zuoying in Kaohsiung. It was the second longest bridge in the world as of 2017.<ref name="CP_records" /><ref name="World Atlas">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Viaducts were designed to be earthquake resistant to allow for trains to stop safely during a seismic event and for repairable damage following a maximum design earthquake.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Bridges built over known fault lines were designed to survive fault movements without catastrophic damage.<ref>Template:Cite journal</ref>

About Template:Convert<ref name="RGI_work01">Template:Cite news</ref> or 18% of the line is in tunnels, including Template:Convert of the TRUPO section in Taipei,<ref name="IRJ_02">Template:Cite news</ref> as well as 48 tunnels with a total length of Template:Convert on the other sections,<ref>Template:Cite news</ref> the longest of which is Paghuashan Tunnel, at a finished length of Template:Convert.<ref name="AiC_Paghuashan">Template:Cite journal</ref> Forty-two of the tunnels included a total of Template:Convert of mined sections, all of which were bored with the sequential excavation and support construction method, with excavated tunnel faces of Template:Convert, between November 2000 and July 2003.<ref name="CT_tunnels04" /> The finished interior cross-sectional area of Template:Convert,<ref name="IRJ_02" /> set according to wider European standards,<ref name="KN_JapEur">Template:Cite news</ref> provides space for two tracks with safety walkways.<ref name="PBN_supstruct" />

After four months of delays, trial runs using the first THSR 700T trains began on 27 January 2005, on the Tainan–Kaohsiung section.<ref name="TT_first-test-run">Template:Cite news</ref> On 30 October 2005, a day after a test run passed the planned top service speed of Template:Convert,<ref>Template:Cite news</ref> the targeted maximum test speed of Template:Convert was achieved.<ref name="TT_315test">Template:Cite news</ref> The section between Banqiao (Taipei) and Zuoying (Kaohsiung) opened to the public on 5 January 2007.<ref name="startofservices">Template:Cite news</ref> The HSR platforms at Taipei Station opened on 2 March 2007, bringing the entire line into operation.<ref>Template:Cite news</ref>

StationsEdit

A distinctive feature of the system's station placement is that many are located at the periphery of urban areas, rather than within city centers. The decision was made with the expectation that the stations would act as centers for planned communities and thus increase the property values of the surrounding area. A study in 2010 showed that this isn't the case,<ref name="albalate"/>Template:Rp but later analyses show that property prices around certain stations have indeed risen.<ref>Template:Cite journal</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> Since the THSR's opening, cities have gradually expanded their mass transit systems to connect with these stations.

Environmental issuesEdit

File:980224新竹金山面老樹醫療保固峻工掛紅布儀式18.jpg
THSRC drafted the Hsinchu Old Camphor Tree Medical Plan, which called for the repair of decayed branches as well as measures designed to maintain the long-term growth and the health of the tree.

Environmental mitigation measures in the line's construction phase included the construction of animal bridges over the line, the planting and re-planting of trees along the track as noise screens,<ref name="rt-thsr">{{#invoke:citation/CS1|citation

|CitationClass=web }}</ref> and the purchase of farmland to create a preservation area for jacana birds away from the line.<ref>Template:Cite news</ref>

THSRC is involved in the preservation of the pheasant-tailed jacana, which is considered endangered in Taiwan. An artificial habitat recovery project was completed in collaboration with the local government, country development organizations and non-profit organizations for a cost of NT$50 million. In 2007, the recovery habitat was officially renamed the "Pheasant-tailed Jacana Eco-Educational Nature Park" and since then, it has opened to the public. THSRC arranges for elementary and junior high school students to visit the park annually.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

<ref name=":1">{{#invoke:citation/CS1|citation |CitationClass=web }}</ref> A 330 year old camphor tree and a temple in Hsinchu County are located on the main route of the THSR, and both of them faced removal because of railway construction. The temple established beside the old tree serves as a major religious site for the local community.Template:Citation needed In 1998, THSRC adjusted the line and design to keep the tree and temple in their original place and cooperated with the local government and people to protect the old tree and the temple until today. Afterwards, together with the local government, the Environment and the Resources Protection Committee, and cultural and historical authorities, THSRC drafted the Hsinchu Old Camphor Tree Medical Plan, which called for the repair of decayed branches as well as measures designed to maintain the long-term growth and the health of the tree.<ref name=":1" /><ref>Template:Cite news</ref>

FinancialEdit

Revenue and costEdit

Item 2007<ref>{{#invoke:citation/CS1|citation CitationClass=web

}}</ref>!! scope="col" | 2008<ref>{{#invoke:citation/CS1|citation

CitationClass=web

}}</ref><ref name="FinRep2009" /> !! scope="col" | 2009<ref name="FinRep2009">{{#invoke:citation/CS1|citation

CitationClass=web

}}</ref><ref name="FinRep2010" /> !! scope="col" | 2010<ref name="FinRep2010">{{#invoke:citation/CS1|citation

CitationClass=web

}}</ref>!! scope="col" | 2011<ref>{{#invoke:citation/CS1|citation

CitationClass=web

}}</ref>!! scope="col" | 2012<ref>{{#invoke:citation/CS1|citation

CitationClass=web

}}</ref>

citation CitationClass=web

}}</ref>

citation CitationClass=web

}}</ref>

2015<ref name=ar17/> 2016<ref name=ar17/> 2017<ref name=":0">Template:Cite book</ref> 2018<ref>Template:Cite book</ref>
Ticket revenue(A) 13,155,221 22,441,012 22,800,753 27,025,822 31,556,782 33,263,223 42,221,888 44,098,796
Other operating revenue(B) 347,567 606,571 522,959 609,529 679,723 720,914
Operating revenue(C=A+B) 13,502,788 23,047,583 23,323,712 27,635,351 32,236,505 33,984,137 36,101,166 38,510,000 51,901,392 40,610,906 43,435,042 45,415,007
Depreciation −18,589,587 −18,994,251 −8,222,634 −9,411,998 −10,647,252 −11,206,236
Operating income −14,909,057 −6,238,553 5,564,846 9,071,545 12,058,405 12,095,229 11,394,464 11,880,000 20,556,496 13,699,496 17,754,984 19,144,964
Financial revenue 315,187 644,500 639,869 230,348 248,318 633,040
Interest −14,423,091 −17,464,896 −10,778,335 −8,912,483 −8,854,892 −8,737,156 −9,256,852 −8,375,559 −7,463,329 −6,618,272
Net pre-tax income −29,398,694 −25,009,697 −4,791,125 -1,210,889 5,783,743 3,956,828 2,710,000 2,660,000 18,833,835 4,997,575 6,478,500 7,311,823
Tax/tax refund −54 0 1,670 848 −2,597,914 −379,992 −579,439 2,038,795 −848,477 −1,138,595 3,384,558
Net income −29,398,748 −25,009,697 −4,789,455 −1,210,041 3,185,833 3,576,836 3,288,951 5,520,000 20,872,630 4,149,098 5,339,905 10,696,381
All figures are in thousands of NT$.

Most of THSRC's revenue comes from ticket sales; supplemental income comes from other activities such as advertising and renting spaces for standing shops and spots in plazas. Advertising spots on trains and station platforms have also been sold.<ref>Template:Cite news</ref> Revenues grew along with ridership over the first three years, but ridership remained below expectations. In 2008 the second year of operation, revenues fell barely short of THSRC's expectations a year earlier of a doubling of first-year results.<ref name="THSRC2ndYear" /><ref name="DoubleRevenue">Template:Cite news</ref>

The cost of running the trains and infrastructure, or cash operating costs, was initially over NT$1 billion a month,<ref>Template:Cite news</ref> but was reduced to around NT$850–900 million in 2008.<ref name="cash-breakeven" /> Revenues first exceeded this level, thus generating a positive operating cash flow, in the fourth month of operation (April 2007).<ref>Template:Cite news</ref>

For THSRC, the over heavy accounting of the fixed cost of fixed assets like rolling stock and infrastructure (depreciation) is a significant non-cash element of total operating costs. In its first two years of operation, THSRC applied straight-line depreciation, distributing costs evenly over a period of 26.5 years.<ref name="handoverperiod">Template:Cite news</ref> As a result, the balance of operating revenues and costs (operating income) showed a high loss in the first year of operation, which was only reduced as revenues grew in the second year. The depreciation period set for THSRC reflected the length of the B.O.T. concession rather than the much longer lifespan of the infrastructure,<ref name="handoverperiod" /> and it is the factor for the operating loss.<ref name="loss-blame">Template:Cite news</ref> After adopting an activity depreciation method which is variable in time,<ref name="red-overh">Template:Cite news</ref> THSRC posted its first operating profit for 2009, the third year of operation.<ref name="FTa_net-op-prof">Template:Cite news</ref> The company reported its first annual profit of NT$5.78 billion after five years of operation.<ref>Template:Cite news</ref>

For the first time in its five-year operation, the Company reported a net income of NT$5.78 billion, with earnings per share of NT$0.59.<ref name="thsrc-2011" /> Revenues increased by 16.65% from NT$27.64 billion to NT$32.24 billion, with operating costs and expenses (excluding depreciation and amortization) rising by only 4.98%. Over the same period of time, gross profit totaled NT$12.98 billion (an increase of 30.32%), income from operations totaled NT$12.06 billion (an increase of 32.93%) and EBITDA totaled NT$22.73 billion (an increase of 22.34%). 2011 gross profit, income from operation and EBITDA were all record highs.<ref name="thsrc-2011" /> Since commencing operations in 2007, THSRC has had a significant influence on Taiwan's economy and on the lives of its people. In 2011, the Company continued to pursue sustainable growth aligned with the interests of shareholders and society, achieving record profits even amid a challenging economic environment.<ref name="thsrc-2011" />

The interest cost is another major item of this company's financing. In the first few years of operation, interest rates were well above market rates.<ref name="TT_earncost09" /><ref name="debt-depr-int" /> Interest expense per month stood at around NT$1.3 billion in 2008, when THSRC first achieved break-even cash flow, with revenue and cash expenses (which exclude depreciation) both around NT$2.1 billion in 2008.<ref name="cash-breakeven">Template:Cite news</ref> Interest rates fell in the first half of 2009, reducing interest expenses<ref name="red-overh" /> and contributing to a reduced net loss.<ref name="FTa_net-op-prof" />

In 2010, THSRC obtained a new syndicate loan to alleviate its imminent financial burden. The company signed a NT$382 billion refinancing contract with a consortium of eight domestic banks led by the Bank of Taiwan, and used the new loan to pay off the previous syndicated loan, which had higher interest.<ref name="THSRC_IRJ" /> Template:As of, the long-term debts totalling NT$385 billion included NT$26 billion in corporate bonds and NT$359 billion in bank loans. In comparison with the terms and conditions of previous loans, the refinancing debts carried lower interest rates and longer tenors, up to 22 years.<ref name="THSRC_IRJ" />

Financial and loanEdit

In cumulative figures, until July 2008, depreciation and interest were equal to 95% of THSRC's accumulated debt.<ref name="debt-depr-int">Template:Cite news</ref> Both THSRC<ref name="loss-blame" /> and a September 2009 government report<ref name="TT_earncost09">Template:Cite news</ref> identified an unreasonable financial structure and the resulting high interest rates and high depreciation charges as the main causes of negative financial performance, while the government assessed THSRC to have performed well in its core business, as measured by earnings before interest, taxes, depreciation and amortization (EBITDA).<ref name="handoverperiod" /> To reduce its interest load, THSRC sought to revise its loan structure in 2008<ref>Template:Cite news</ref> and again in 2009.<ref>Template:Cite press release</ref><ref>Template:Cite news</ref> To reduce depreciation costs by increasing the amortization time, THSRC requested an extension of its 35-year concession period.<ref name="handoverperiod" />

By the summer of 2009, THSRC's cumulative losses were equivalent to two-thirds of its equity capital. In response to global financial crisis and domestic economic recession, THSRC proposed to increase income and reduce expenditures in several aspects in the hope of raising operation performances. In February 2009, THSRC announced to adjust train frequency, cut down salary payment by 10~20% among management level, and measured to expand fare promotion to stimulate ridership. While the media questioned whether the planned construction of three more intermediate stations and the extension to Nangang would be postponed, THSRC published press release on 28 September 2009, stating that the company will comply with "Taiwan High Speed. Rail Construction and Operation Contract", and the construction project of 3 intermediate stations, namely Miaoli, Changhua and Yunlin will be initiated in July 2012, and is scheduled to start its operation from 2015. By the time of completion, there will be a total of 12 stations along the THSRC operation route.<ref>Template:Cite news</ref> The company was put under new management in September 2009 with the aim of turning around the company's finances with government help in arranging refinancing of the loans.<ref>Template:Cite news</ref>

The government took majority control of the company after the election of its new board on 10 November 2009.<ref>Template:Cite news</ref> In January 2010, when accumulated losses already exceeded NT$70 billion, THSRC signed a government-guaranteed refinancing deal in which eight government-dominated banks provided NT$382 billion at lower interest rates and longer maturity.<ref>Template:Cite news</ref> The government also approved the company's new variable depreciation charge.<ref name="FTa_net-op-prof" />

IncidentsEdit

On 12 April 2013, suspicious luggage items were found inside the North bound train No. 616 toilet when it was heading towards THSR Hsinchu Station. The train was stopped at THSR Taoyuan Station and all of the passengers were evacuated. Later, it was determined the luggage contained an unidentified liquid in cans, alarm clock and white particulate matter. The items were dismantled by the bomb squad and taken for further investigation. Two KMT legislators, Hsu Hsin-ying and Lu Shiow-yen, were on board.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Part of the tracks near Tainan were badly damaged during the earthquake on 6 February 2016. All high-speed rail services south of Chiayi Station were suspended until 7 February 2016.

On 10 May 2017, a non-passenger carrying train traveled in the opposite direction of the track from Zuoying to Tainan for Template:Cvt due to human negligence.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Due to the COVID-19 pandemic, the THSR, along with Taiwan Railway Administration and bus services nationwide, began to require all passengers to wear surgical masks as of 1 April. In addition, infrared sensors were set up at twelve stations to detect fevers, eating and drinking were prohibited on board the trains, trains and stations were disinfected more frequently, and the THSR cancelled all non-reserved seating tickets, which allowed for crowds of passengers to stand if no seats were available. It was reported that the switch to reserved seats only aimed to reduce crowding.<ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref><ref>{{#invoke:citation/CS1|citation |CitationClass=web }}</ref>

Public relations activitiesEdit

THSRC conducts community engagement activities to raise its profile.

Since 2009, the company has organized an annual "Ride THSR and Join the Book Exhibition for Free" event to promote a national reading culture; school-age passengers from remote villages are given free admission to the Taipei International Book Exhibition and go there on a themed high-speed "reading train", which features a celebrity reading a book over the train's public address system.<ref name="thsrc-2011" />

Since 2010, along with World Vision Taiwan, THSRC has run a tuition fee assistance program for thousands of underprivileged children, to which passengers contribute.<ref name="thsrc-2011" />

Other events have been a cappella singers at stations; gift-giving to couples taking wedding photos at major stations; station tours for the public and experience-sharing with its fellow railway transportation operators; and in collaboration with non-profit organizations, thousands of free rides to underprivileged groups and families.<ref name="thsrc-2011" />

Students at primary, secondary and tertiary level learn about high-speed rail and THSRC at "THSR Camps", held in partnership with the Railway Cultural Society of Taiwan, the National Chiao Tung University Railway Research Society, and the China Youth Corps.<ref name="thsrc-2011" />

In popular cultureEdit

The first film to feature THSR prominently was the 2007 Taiwanese movie Summer's Tail, directed by Cheng Wen-tang ({{#invoke:Lang|lang}}).<ref name="lt-summers-tail">Template:Cite news</ref>

Railfan: Taiwan High Speed Rail, a 2007 train simulator video game developed jointly by Taiwanese company Actainment and Japanese company Ongakukan on the basis of the latter's Train Simulator series, featured real video and was the first Taiwanese game for Sony Computer Entertainment's PlayStation 3 system.<ref name="railfan-ann">Template:Cite news</ref> The "National Geographic" website chose travel by Taiwan's high speed train as the "Best winter trip” in 2013.<ref>Template:Cite news</ref>

Template:Portal bar

See alsoEdit

NotesEdit

Template:Notelist

ReferencesEdit

Template:Reflist

Further readingEdit

External linksEdit

Template:Sister project

Template:Taiwan High Speed Rail Template:Taiwan Rail Transport Template:High-speed rail Template:High-speed railway lines Template:FTSE TWSE Taiwan 50Template:Transport in Taiwan Template:Authority control