Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Pacific DC Intertie
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
{{short description|HVDC power line in the United States}} {{Infobox power transmission line | name = Pacific DC Intertie | photo = Powerlines, Washoe County, Nevada (3070983825).jpg | caption = Pacific DC Intertie guyed pylon, Washoe County, Nevada | map = {{maplink |type=line |frame=yes |plain=yes |frame-align=center |zoom=3}} | map_caption = | country = [[United States]] | state = | province = | coordinates = | lat = | long = | direction = north–south | start = [[Celilo Converter Station]] | through = | finish = [[Sylmar Converter Station]] | par = | owner = | partners = | operator = | cable_manufacturer = | cable_installer = | cable_layer = | substation_manufacturer= | substation_installer= | contractors = | construction = | expected = | est = | decom = | type = | current_type = [[HVDC]] | length_km = | capacity = | AC_voltage = | DC_voltage = | poles_no = | circuits_no = }} {{GeoGroup}} [[File:Pacific intertie geographic map.png|thumb|right|Map of the route of the Pacific Intertie transmission route and stations|407x407px]] The '''Pacific DC Intertie''' (also called '''Path 65''') is an [[electric power transmission]] line that transmits [[electricity]] from the [[Pacific Northwest]] to the [[Los Angeles]] area using [[HVDC|high voltage direct current]] (HVDC). The line capacity is 3.1 [[gigawatts]], which is enough to serve two to three million Los Angeles households and represents almost half of the [[Los Angeles Department of Water and Power]] (LADWP) electrical system's peak capacity.<ref>{{cite web |author=Sharon Bernstein and Amanda Covarrubias |date=July 10, 2006 |title=Heat Wave Caught DWP Unprepared |url=https://www.latimes.com/archives/la-xpm-2006-jul-28-me-power28-story.html |work=[[Los Angeles Times]] |access-date=23 September 2020 }}</ref> The intertie originates near the [[Columbia River]] at the [[Celilo Converter Station]] of [[Bonneville Power Administration]]'s grid outside [[The Dalles, Oregon]] and is connected to the [[Sylmar Converter Station]] north of [[Los Angeles]], which is owned by five utility companies and managed by [[LADWP]]. The Intertie can transmit power in either direction, but power flows mostly from north to south. The section of the line in Oregon is owned and operated by Bonneville Power Administration, while the line in Nevada and California is owned and operated by Los Angeles Department of Water and Power.<ref>{{cite web |url=https://www.bpa.gov/efw/Analysis/NEPADocuments/Pages/PDCI_Upgrade.aspx |title=Pacific Direct Current Intertie (PDCI) Upgrade Project (DOE/EA-1937) Lake, Jefferson, Crook, Deschutes, and Wasco counties, Oregon |publisher=Bonneville Power Administration |access-date=2019-12-29}}</ref> The transition is at the Oregon–Nevada border, at {{coord|41.9964|-119.9623|type:landmark_region:US-OR|name=Pacific Intertie ownership boundary|format=dms}}. This is one of two HVDC lines serving Los Angeles; the other is [[Path 27]].
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)