Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Red Line (CTA)
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
{{Short description|Rapid transit line in Chicago}} {{Use American English|date=May 2017}} {{Use mdy dates|date=May 2017}} {{Infobox rail line | color = {{rcr|CTA|Red}} | name = Red Line | image = Red Line departing Sheridan Rd.jpg | image_width = frameless{{!}}upright=1.35 | caption = A Red Line train of 5000-series cars departing [[Sheridan station (CTA)|Sheridan]] | type = [[Rapid transit]] | system = [[Chicago "L"]] | status = Operational | locale = [[Chicago]], [[Illinois]], [[United States]] | start = [[Howard (CTA station)|Howard]] | end = [[95th/Dan Ryan (CTA station)|95th/Dan Ryan]] | stations = 33 | routes = | daily_ridership = 114,598 (avg. weekday 2024) | open = Oldest section: {{Start date and age|1900|5|31}}<br />Current operation: {{Start date and age|1993|02|21}} | close = | owner = | operator = [[Chicago Transit Authority]] | character = [[Embankment (earthworks)|Embankment]], [[Elevated railway|elevated]], [[Rapid transit|subway]], and expressway median | stock = [[5000-series (CTA)|5000-series]]<br />8-car trains (typical, maximum) | linelength = {{convert|21.8|mi|km|abbr=on}} | tracklength = | depot = [[Howard Yard]], [[98th Yard]] | tracks = | gauge = {{track gauge|ussg|allk=on}} | minradius = | electrification = {{600 V DC|conductor=third rail}} | speed = | elevation = | map = {{switcher |{{maplink-road|from=Red Line (CTA).map}} Red Line highlighted in red<hr> |Show geographic map |{{Red Line (CTA)}} |Show diagram map }} | map_state = }} The '''Red Line''' is a [[rapid transit]] line in [[Chicago]], run by the [[Chicago Transit Authority]] (CTA) as part of the [[Chicago "L"]] system. It is the busiest line on the "L" system, with an average of 108,303 passengers boarding each weekday in 2023<ref name="cta-report">{{cite web | title=Annual Ridership Report - Calednar Year 2023 | publisher= [[Chicago Transit Authority]]|url=https://www.transitchicago.com/assets/1/6/2023_Annual_Ridership_Report.pdf| date= January 23, 2024| accessdate=November 21, 2024}}</ref> The route is {{convert|21.8|mi|km}} long with a total of 33 stations. It runs elevated from the Howard station in the [[Rogers Park, Chicago|Rogers Park]] neighborhood on the North Side, through the State Street subway on the [[Near North Side, Chicago|Near North Side]], [[Chicago Loop|Downtown]], and the [[Near South Side, Chicago|South Loop]], and then through the [[Dan Ryan Expressway]] median to 95th/Dan Ryan in the [[Roseland, Chicago|Roseland]] neighborhood on the South Side. Like Chicago's [[Blue Line (CTA)|Blue Line]], the Red Line runs 24 hours a day, 365 days a year, making Chicago, [[New York City]], and [[Copenhagen]] the only three cities in the world that operate train service 24 hours a day throughout their city limits.{{citation needed|date=September 2024}} The CTA is planning an extension of the Red Line, adding {{convert|5.6|mi|km}} and four new stations which would extend the line from 95th Street to 130th Street, making the Red Line approximately 31 miles in length with 37 stations.<ref>{{cite web | url=https://chi.streetsblog.org/2023/09/08/50-years-after-it-was-promised-in-1973-the-south-red-line-extension-is-slated-to-get-a-1-973b-grant | title=50 years after it was promised, the South Red Line Extension is slated to get a $1.973B grant - Streetsblog Chicago | date=September 8, 2023 }}</ref> In December 2022, the Chicago City Council approved the creation of a district that will send approximately $1 billion in tax revenue for the extension of the Red Line south of 95th Street to 130th Street.<ref>{{cite web | url=https://blockclubchicago.org/2022/12/14/red-line-extension-tif-approved-sending-nearly-1-billion-to-far-south-side-project-over-35-years/ | title=Red Line Extension TIF Approved, Sending Nearly $1 Billion to Far South Side Project over 35 Years | date=December 14, 2022 }}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)