Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Delta Works
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== History == [[File:Zes jaar na de stormvloed.ogv|thumb|thumbtime=1:07|Newsreel from 1959 on the advantages and disadvantages of the Delta Works]] Due to indecision and the [[World War II|Second World War]], little action was taken. In 1950 two small estuary mouths, the Brielse Gat near [[Brielle]] and the Botlek near [[Vlaardingen]] were dammed. After the [[North Sea flood of 1953]], a Delta Works Commission was installed to research the causes and develop measures to prevent such disasters in future. They revised some of the old plans and came up with the "Deltaplan". === Delta law and conceptual framework === [[File:Colijnsplaat - Zeelandbrücke.jpg|thumb|[[Zeeland Bridge]]]] [[File:Oosterscheldekering-pohled.jpg|thumb|[[Oosterscheldekering]]]] An important part of this project was fundamental research to come up with long-term solutions, protecting the Netherlands against future floods. Instead of analysing past floods and building protection sufficient to deal with those, the Delta Works commission pioneered a conceptual framework to use as norm for investment in flood defences. The framework is called the 'Delta norm'; it includes the following principles: * Major areas to be protected from flooding are identified. These are called "dike ring areas" because they are protected by a ring of primary sea defences. * The cost of flooding is assessed using a statistical model involving damage to property, lost production, and a given amount per human life lost. * For the purpose of this model, a human life is valued at €2.2 million (2008 data). * The chances of a significant flood within the given area are calculated. This is done using data from a purpose-built flood simulation lab, as well as empirical statistical data regarding water wave properties and distribution. Storm behaviour and spring tide distribution are also taken into account. The most important "dike ring area" is the South Holland coast region. It is home to four million people, most of whom live below normal sea level. The loss of human life in a catastrophic flood here can be very large because there is typically little warning time with North Sea storms. Comprehensive evacuation is not a realistic option for the Holland coastal region. The commission initially set the acceptable risk for complete failure of every "dike ring" in the country at 1 in 125,000 years. But, it found that the cost of building to this level of protection could not be supported. It set "acceptable" risks by region as follows: * North and South Holland (excluding Wieringermeer): 1 per 10,000 years * Other areas at risk from sea flooding: 1 per 4,000 years * Transition areas between high land and low land: 1 per 2,000 years River flooding causes less damage than salt water flooding, which causes long-term damage to agricultural lands. Areas at risk from river flooding were assigned a higher acceptable risk. River flooding also has a longer warning time, producing a lower estimated death toll per event. * South Holland at risk from river flooding: 1 per 1,250 years * Other areas at risk from river flooding: 1 per 250 years. These acceptable risks were enshrined in the Delta Law (Dutch: ''Deltawet''). This required the government to keep risks of catastrophic flooding within these limits and to upgrade defences should new insights into risks require this. The limits have also been incorporated into the new Water Law (''Waterwet''), effective from 22 December 2009. The Delta Project (of which the Delta Works are a part) has been designed with these guidelines in mind. All other primary defences have been upgraded to meet the norm. New data elevating the risk assessment on expected [[sea level rise]] due to global warming has identified ten 'weak points.' These have been upgraded to meet future demands. The latest upgrades are made under the High Water Protection Program. === Alterations to the plan during the execution of the Works === [[File:Schaalmodel Maeslantkering.jpg|thumb|Scale model of the [[Maeslantkering]]]] During the execution of the works, changes were made in response to public pressure. In the Nieuwe Waterweg, the heightening and the associated widening of the dikes proved very difficult because of public opposition to the planned destruction of important historic buildings to achieve this. The plan was changed to the construction of a storm surge barrier (the [[Maeslantkering]]) and dikes were only partly built up. ==== The storm-surge barrier ==== The Delta Plan originally intended to create a large freshwater lake, the ''{{lang|nl|Zeeuwse Meer}}'' (Zeeland Lake).<ref name="ley196110">{{cite magazine |last=Ley |first=Willy |date=October 1961 |title=The Home-Made Land |department=For Your Information |url=https://archive.org/stream/Galaxy_v19n06_1961-08#page/n65/mode/1up |magazine=Galaxy Science Fiction |pages=92–106 }}</ref> This would have caused major environmental destruction in Oosterschelde, with the total loss of the saltwater ecosystem and, consequently, the harvesting of oysters. Environmentalists and fishermen combined their efforts to prevent the closure; they persuaded parliament to amend the original plan. Instead of completely damming the estuary, the government agreed to build a storm surge barrier. This essentially is a long collection of very large valves that can be closed against storm surges. The storm surge barrier closes only when the sea-level is expected to rise 3 metres above mean sea level. Under normal conditions, the estuary's mouth is open, and salt water flows in and out with the tide. As a result of the change, the weak dikes along the Oosterschelde needed to be strengthened. Over 200 km of the dike needed new revetments. The connections between the Eastern Scheldt and the neighboring [[Haringvliet]] had to be dammed to limit the effect of the salt water. Extra dams and locks were needed at the east part of the Oosterschelde to create a shipping route between the ports of Rotterdam and Antwerp. Since operating the barrier has an effect on the environment, fisheries and the water management system, decisions made on opening or closing the gate are carefully considered. Also the safety of the surrounding dykes are affected by barrier operations. ====Environmental policy implementations==== In an attempt to restore and preserve the natural system surrounded by the dykes and storm-surge barrier, the concept 'building with nature' was introduced in revised Delta Program updates after 2008. The new integrated water management plan not only takes into account protection against flooding, but also covers water quality, [[leisure industry]], economic activities, shipping, environment and nature. Whenever possible, existing engineering constructions would be replaced by more 'nature friendly' options in an attempt to restore natural estuary and tides, while still protecting against flooding.<ref>{{cite journal|last1=Kabat|first1=Pavel|last2=Fresco|first2=Louise|last3=Stive|first3=Marcel J.F.|last4=Veerman|first4=Cees P.|last5=van Alphen|first5=Jos S.L.J.|last6=Parmet|first6=Bart W. A. H.|last7=Hazeleger|first7=Wilco|last8=Katsman|first8=Caroline A.|title=Dutch coasts in transition|journal=Nature Geoscience|date=July 2009|volume=2|issue=7|pages=450–451|doi=10.1038/ngeo572|bibcode=2009NatGe...2..450K}}</ref> In addition, building components of the reinforcements are designed in a way that they support formation of entire ecosystems.<ref>{{cite journal|last1=Deltares|title=Bouwen met de natuur in de praktijk|journal=Delta Life|date=2014|volume=1|pages=14–15}}</ref> As part of the revision, the [[Room for the River (Netherlands)|Room for the River]] projects, enabled nature to occupy space by lowering or widening the river bed.<ref>{{cite journal|last1=Van Buuren|first1=A|last2=Ellen|first2=G.J.|last3=Warner|first3=J.F.|title=Path-dependency and policy learning in the Dutch delta: toward more resilient flood risk management in the Netherlands?|journal=Ecology and Society|date=2016|volume=21|issue=4|doi=10.5751/es-08765-210443|doi-access=free}}</ref> In order to establish this, agricultural flood plains are turned into natural parks, excavated farmland is used for wild vegetation and newly excavated lakes and bypasses create habitats for fish and birds.<ref>{{cite journal|last1=Rijcken|first1=Ties|title=A critical approach to some new ideas about the Dutch flood risk system|journal=Research in Urbanism Series|date=2015|volume=3|issue=1}}</ref> Along the coast, natural sand is added each year to allow sand to blow freely through the dunes instead of having the dunes held in place by planted vegetation or revetments.<ref>{{cite web|last1=DGW|title=Nationaal Waterplan|website=rijksoverheid.nl|url=https://www.rijksoverheid.nl/documenten/rapporten/2009/12/01/nationaal-waterplan-2009-2015|archive-url=https://web.archive.org/web/20150926204410/https://www.rijksoverheid.nl/documenten/rapporten/2009/12/01/nationaal-waterplan-2009-2015|url-status=dead|archive-date=September 26, 2015|publisher=Ministerie van Infrastructuur en Milieu}}</ref> Although the new plan brought along additional cost, it was received favourably.{{citation needed|date=November 2018}} The re-considerations of the Delta Project indicated the growing importance of integrate environmental impact assessments in policy-making.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)