Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Dependency (project management)
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Standard types of dependencies == There are four standard types of dependencies:{{sfn | Mulcahy | 2021 | p=173}} # Finish to start (FS) #* ''A'' FS ''B'' means "activity A must finish before activity B can begin" (or "B can't start until A has finished").<ref name=PMI_PracticeStandShed/><br/>[[image:Dependency-FS.png]] #* ''(Foundations dug) FS (Concrete poured)'' # Finish to finish (FF) #* ''A'' FF ''B'' means "activity A must finish before activity B can finish" (or "B can't finish before A is finished") .<ref name=PMI_PracticeStandShed/><br/> [[image:Dependency-FF.png]] #* ''(Last chapter written) FF (Entire book written)'' # Start to start (SS). #* ''A'' SS ''B'' means "activity A must start before activity B can start" (or "B can't start until A has started").<ref name=PMI_PracticeStandShed/><br/>[[image:Dependency-SS.png]] #* ''(Project work started) SS (Project management activities started)'' # Start to finish (SF) #* ''A'' SF ''B'' means "activity A must start before activity B finishes" (or "B can't finish until A has started")<br/>[[image:Dependency-SF.png]] #* ''(New shift started) SF (Previous shift finished)'' Finish-to-start is considered a "natural dependency". The [[The Practice Standard for Scheduling|Practice Standard for Scheduling]] recommends, that "Typically, each predecessor activity would finish prior to the start of its successor activity (or activities)(known as finish-to-start (FS) relationship). Sometimes it is necessarily to overlap activities; an option may be selected to use start-to-start (SS), finish-to-finish (FF) or start-to-finish (SF) relationships....Whenever possible, the FS logical relationship should be used. If other types of relationships are used, they shall be used sparingly and with full understanding of how the relationships have been implemented in the scheduling software being used. Ideally, the sequence of all activities will be defined in such a way that the start of every activity has a logical relationship from a predecessor and the finish of every activity has a logical relationship to a successor".<ref name=PMI_PracticeStandShed/> SF is rarely used, and should generally be avoided. Microsoft recommends to use SF dependency for just-in-time scheduling.<ref name=MSP_SF/> It can be easily shown however, that this would only work if [[Resource_leveling|resource levelling]] is not used, because resource levelling can delay a successor activity (an activity, which shall be finished just-in-time) in such a way, that it will finish later than the start of its logical predecessor activity, thus not fulfilling the just-in-time requirement. There are three kinds of dependencies with respect to the reason for the existence of dependency: # Causal (logical) #* ''It is impossible to edit a text before it is written'' #* ''It is illogical to pour concrete before you dig the foundations of a building'' # [[Resource (project management)|Resource]] constraints #* ''It is logically possible to paint four walls in a room simultaneously but there is only one painter'' # Discretionary (preferential) #* ''I want to paint the living room before painting the dining room, although I could do it the other way round, too'' Early [[critical path method|critical path]]-derived schedules often reflected only on causal (logical) or discretionary (preferential) dependencies because the assumption was that resources would be available or could be made available. Since at least the mid-1980s, competent project managers and schedulers have recognized that schedules must be based on resource availability. The [[critical chain]] method necessitates taking into account resource constraint-derived dependencies as well. === Leads and lags === Dependencies can be modified by leads, and lags. Both leads and lags can be applied to all 4 types of dependencies. [[A Guide to the Project Management Body of Knowledge|PMBOK]] defines '''lag''' as "the amount of time whereby a successor activity will be delayed with respect to a predecessor activity". For example: When building two walls from a novel design, one might start the second wall 2 days after the first so that the second team can learn from the first. This is an example of a ''lag'' in a Start-Start relationship. In accordance to [[A Guide to the Project Management Body of Knowledge|PMBOK]] a '''lead''' is "the amount of time whereby a successor activity can be advanced with respect to a predecessor activity For example, on a project to construct a new office building, the landscaping could be scheduled to start prior to the scheduled punch list completion. This would be shown as a finish-to-start with two-week lead".<ref name=PMBOK/>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)