Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Outfall
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==United States of America== In the United States, industrial facilities that discharge storm water which was exposed to industrial activities at the site are required to have a multi-sector general permit.<ref name="CFR Section 122.26">{{cite web |title=Request Access |url=https://www.ecfr.gov/current/title-40/chapter-I/subchapter-D/part-122/subpart-B/section-122.26 |website=unblock.federalregister.gov |publisher=Code of Federal Regulations |access-date=12 July 2023}}</ref> Issuing permits for storm water is delegated to the individual states that are authorized by the [[United States Environmental Protection Agency|Environmental Protection Agency]] (EPA). Facilities that apply for a permit must specify the number of outfalls at the site. According to the EPA's ''Multi-Sector General Permit For Stormwater Discharges Associated With Industrial Activity'', outfalls are locations where the stormwater exits the facility, including pipes, ditches, swales, and other structures that transport stormwater. If there is more than one outfall present, measure at the primary outfall (i.e., the outfall with the largest volume of stormwater discharge associated with industrial activity).<ref name="MSGP">{{cite book |title=Multi-Sector General Permit For Stormwater Discharges Associated With Industrial Activity|date=2009 |publisher=United States Environmental Protection Agency |location=Washington |url=https://www3.epa.gov/npdes/pubs/msgp2008_finalpermit.pdf |access-date=12 July 2023}}</ref> [[File:FlorhamParkSewerageUtilityOutfall.webm|thumb|Outfall from a sewage plant discharging to [[Passaic River]] in New Jersey]] Outfalls from sewage plants can be up to {{convert|20|ft|m}} in diameter and release {{convert|4000|USgal/s|m3/h}} of treated human waste miles from the shore. A [[wastewater]] treatment system discharges treated effluent to a water body from an outfall. An [[ocean outfall]] may be conveyed several miles offshore, to discharge by [[nozzle]]s at the end of a spreader or T-shaped structure. Outfalls may also be constructed as an outfall tunnel or subsea tunnel and discharge effluent to the ocean via one or more marine risers with nozzles.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)