Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
USS Donald Cook
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Upgrade == On 12 November 2009, the [[Missile Defense Agency]] announced that ''Donald Cook'' would be upgraded during fiscal 2012 to [[RIM-161 Standard Missile 3]] (SM-3) capability to function as part of the [[Aegis Ballistic Missile Defense System]].<ref>{{cite news |url= http://www.navytimes.com/news/2009/11/navy_aegisbmd_111209w/ |title= MDA announces next 6 BMD ships |newspaper= [[Navy Times]] |date= 12 November 2009 |last=Ewing |first=Philip |url-access=subscription }}</ref> In 2016, four destroyers patrolling with the [[U.S. 6th Fleet]] based in Naval Station Rota, Spain, including ''Donald Cook'' received self-protection upgrades, replacing the aft [[Phalanx CIWS]] 20 mm [[Vulcan cannon]] with the [[RIM-116 RAM#SeaRAM (weapon system)|SeaRAM]] 11-cell [[RIM-116 Rolling Airframe Missile]] launcher. The SeaRam uses the same sensor dome as the Phalanx. This was the first time the close-range ship defense system was paired with an Aegis ship. All four ships to receive the upgrade were either Flight I or II, meaning they originally had two Phalanx CIWS systems when launched.<ref>{{cite web |url=http://news.usni.org/2015/09/15/navy-integrating-searam-on-rota-based-ddgs-first-installation-complete-in-November |title=Navy Integrating SeaRAM on Rota-Based DDGs; First Installation Complete In November |last=Eckstein |first=Megan |website=usni.org |publisher=U.S. Naval Institute |date=15 September 2015 |access-date=20 November 2016 |archive-url=https://web.archive.org/web/20161008160945/https://news.usni.org/2015/09/15/navy-integrating-searam-on-rota-based-ddgs-first-installation-complete-in-November |archive-date=8 October 2016 |url-status=live }}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)