Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Tarka Line
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Proposed improvements == [[Network Rail]] would like to raise the Cowley Bridge during their [[Network Rail Control Periods|Control Period 7]] (2024-2029). This would reduce the likelihood of the railway being closed or damaged by floods.<ref>{{cite magazine |last1=Clark |first1=Rhodri |title=Prioritising rail resilience |magazine=Modern Railways |date=September 2022 |pages=72β73}}</ref> The Barnstaple to Bideford route was mentioned in the [[Association of Train Operating Companies]] 2009 ''[[Connecting Communities: Expanding Access to the Rail Network]]'' report which recommended some closed lines that could be rebuilt to restore railway services to large communities.{{ATOCConnectingCommunitiesReportS10|page=16}} Following the reopening of the [[Dartmoor line]] to {{stnlnk|Okehampton}} in 2021, a local 'Atlantic Coast to Exeter' campaign resumed interest in reopening the line from Barnstaple to Bideford.<ref>{{cite magazine|last1=Steer |first1=Tim |title=Back the Bideford Bid |journal=Modern Railways |date=February 2022 |page=47}}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)