Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
CANDU reactor
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===600 MW<sub>e</sub> designs === The successes at NPD and Douglas Point led to the decision to construct the first multi-unit station in Pickering, Ontario. Pickering A, consisting of Units 1 to 4, went into service in 1971. Pickering B with units 5 to 8 came online in 1983, giving a full-station capacity of 4,120 MW<sub>e</sub>. The station is very close to the city of [[Toronto]], in order to reduce [[electric power transmission|transmission]] costs. A series of improvements to the basic Pickering design led to the CANDU 6 design, which first went into operation in the early 1980s. CANDU 6 was essentially a version of the Pickering power plant that was redesigned to be able to be built in single-reactor units. CANDU 6 was used in several installations outside Ontario, including the [[Gentilly Nuclear Generating Station|Gentilly-2]] in Quebec, and [[Point Lepreau Nuclear Generating Station]] in New Brunswick. CANDU 6 forms the majority of foreign CANDU systems, including the designs exported to Argentina, Romania, China and South Korea. Only India operates a CANDU system that is not based on the CANDU 6 design.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)