Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Cranbourne line
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Level Crossing Removals === The [[Level Crossing Removal Project]] has announced the removal of all 15 remaining level crossings on the Cranbourne line, to be completed in stages from 2018 to 2025. All level crossings between Caulfield and Dandenong were removed in 2018 as part of the [[Caulfield railway station|Caulfield]] to [[Dandenong railway station|Dandenong]] skyrail project.<ref>{{Cite web |date=18 March 2018 |title=Caulfield to Dandenong skyrail nears completion |url=https://www.danielbowen.com/2018/03/19/cfd-dng-skyrail-nears-completion/ |access-date=11 December 2022 |website=Daniel Bowen}}</ref> This included the removal of nine level crossings and the reconstruction of five elevated stations along the corridor.<ref>{{Cite web |title=Caulfield to Dandenong (Skyrail) {{!}} Level Crossing Removal |url=https://www.ecodynamics.com.au/projects/skyrail/ |access-date=11 December 2022 |website=Ecodynamics {{!}} Commercial Landscaping {{!}} Greening & Nurturing Our Communities}}</ref> The second phase of removals involves removing individual crossings along the corridor through a variety of methods by 2025.<ref>{{Cite web |date=27 July 2022 |title=Pakenham Level Crossing Removals One Step Closer |url=https://www.premier.vic.gov.au/sites/default/files/2022-07/220727%20-%20Pakenham%20Level%20Crossing%20Removals%20One%20Step%20Closer.pdf }}</ref> Some crossings have been removed through elevating the rail corridor, some by lowering or raising the road, with other crossings being removed by closing the crossing off from [[Vehicle|motor traffic]].<ref>{{Cite web |last=Cardinia Shire Council |title=LXRP β Level Crossing Removal Project in Cardinia Shire |url=https://www.cardinia.vic.gov.au/info/20056/major_projects/854/lxrp_-_level_crossing_removal_project_in_cardinia_shire |access-date=11 December 2022 |website=www.cardinia.vic.gov.au |archive-date=11 December 2022 |archive-url=https://web.archive.org/web/20221211111914/https://www.cardinia.vic.gov.au/info/20056/major_projects/854/lxrp_-_level_crossing_removal_project_in_cardinia_shire |url-status=dead }}</ref> These projects will leave the entirety of the Cranbourne line level crossing free by 2025, with projects on the [[Sunbury railway line|Sunbury line]] leaving the entire Sunshine-Dandenong corridor crossing free by the opening of the Metro Tunnel in 2025.<ref>{{Cite web |last=O'Keane |first=Tom |date=6 January 2022 |title=Contact awarded for $844M Melbourne rail works |url=https://roadsonline.com.au/more-level-crossings-set-to-be-removed-in-pakenham-melbourne/ |access-date=11 December 2022 |website=Roads & Infrastructure Magazine}}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)