Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Interstate 4
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===I-4 Beyond the Ultimate=== I-4 Beyond the Ultimate, which includes proposed extensions of the I-4 Express toll lanes, both southwest and northeast of the I-4 Ultimate project, are being considered. In 2013, FDOT initiated a study to reevaluate previous feasibility studies, made between 1998 and 2005, in which the addition of HOV or express toll lanes were considered.<ref name="I-4 BU original documents">{{cite web |title = Original Documents |url = http://www.i4express.com/original_documents.shtm |website = Interstate 4 Beyond the Ultimate |publisher = Florida Department of Transportation |access-date = February 19, 2015 |archive-date = February 19, 2015 |archive-url = https://web.archive.org/web/20150219135644/http://www.i4express.com/original_documents.shtm |url-status = dead }}</ref><ref name="I-4 BU FAQs" /> The extensions cover approximately {{convert|40|mi|km}} of I-4 through Greater Orlando. Southwest of the I-4 Ultimate, the study is examining an extension through Osceola County to US 27 in Polk County. Northeast of the I-4 Ultimate, the study is examining an extension through Seminole County to SR 472 in Volusia County.<ref name="I-4 BU FAQs">{{cite web |title = Frequently Asked Questions |url = http://www.i4express.com/project_faq.shtm |website = Interstate 4 Beyond the Ultimate |publisher = Florida Department of Transportation |access-date = February 19, 2015 |archive-date = February 15, 2015 |archive-url = https://web.archive.org/web/20150215211851/http://i4express.com/project_faq.shtm |url-status = dead }}</ref> In addition to these express lane extensions, many interchanges will be reconstructed as part of the project. Some of these reconstructed interchanges will be converted to [[diverging diamond interchange]]s, which are proposed at both [[County Road 532 (Osceola County, Florida)|CR 532]] (exit 58; implemented on July 10, 2022) and [[Florida State Road 482|SR 482]] (exit 74A; implemented on March 9, 2024). A brand new interchange at Daryl Carter Parkway is also proposed to be a diverging diamond. Unlike I-4 Ultimate, where the {{convert|21|mi|km}} encompassed by that project were constructed at once, the {{convert|40|mi|km}} encompassed by I-4 Beyond the Ultimate will be constructed in phases.<ref>{{Cite web |title = Project Info & Map: Find out what's happening in your area. |url = https://i4beyond.com/project-info-map/ |access-date = October 2, 2022 |website = I-4 Beyond the Ultimate |language = en }}</ref> As part of the "Moving Florida Forward" initiative, construction of I-4 widening between Championsgate and [[Osceola Parkway]] will add additional lanes on this 15-mile segment, which is expected to begin construction in late 2024.<ref>{{Cite web |date=2024-04-03 |title=Construction to begin this year for I-4 widening project, DeSantis says |url=https://www.wfla.com/news/politics/gov-desantis-expected-to-sign-transportation-bill-in-polk-city/ |access-date=2024-04-06 |website=WFLA |language=en-US}}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)