Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Millennium Line
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Port Coquitlam extension=== When the [[Evergreen Extension]] was built, the first few metres of track and a track switch to allow for an eventual eastward extension to [[Port Coquitlam]] were built at [[Coquitlam Central station]]. This would create two branches where trains would alternate between going east to Lafarge Lake–Douglas station or to Port Coquitlam. A feasibility study was conducted, started during early 2020 and running for about six months. Port Coquitlam mayor Brad West, the Port Coquitlam city council, and the [[Coquitlam City Council]] all voiced support for the extension. However, {{as of|2025|lc=y|post=,}} no funding had been secured nor a formal plan created.<ref>{{cite web|url=https://dailyhive.com/vancouver/port-coquitlam-skytrain-study|title=Port Coquitlam to launch feasibility study on Skytrain Extension | date=November 28, 2019 |work=Daily Hive |access-date=November 28, 2019}}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)