Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Loading gauge
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
====Netherlands==== In the Netherlands, a similar shape to the UIC C is used that rises to {{convert|4.70|m|ftin|abbr=on}} in height. The trains are wider allowing for {{convert|3.40|m|ftin|abbr=on}} width similar to Sweden. About one third of the Dutch passenger trains use [[bilevel rail car]]s. However, Dutch platforms are much higher than Swedish ones. ===== Betuweroute ===== * [[Betuweroute]]: {{convert|4.10|by|6.15|m|ftin|frac=8|abbr=on}} to allow [[double stacked container trains]] in the future. The present [[overhead line]] does not allow this height, as it has to follow standards.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)