Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Interstate 16
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== I-95 interchange === Due to high congestion during [[rush hour]] in Savannah and many deadly car accidents, the [[Georgia Department of Transportation]] (GDOT) has undertaken a new construction project at the interchange of I-95 and I-16 (exit 157 on I-16), along with other I-16 improvements.<ref>{{Cite web|url=https://www.savannahnow.com/news/2016-06-28/proposed-i-16-work-promises-widening-safety|title=Proposed I-16 work promises widening, safety|last=Ray|first=Brittini|website=Savannah Morning News|language=en|access-date=August 12, 2019}}</ref> The project, dubbed as the 16@95 Improvement Projects, includes:<ref>{{Cite web|url=https://www.equipmentworld.com/ga-to-get-its-first-turbine-interchange-with-i-16-i-95-rehab/|title=I-16/I-95 rehab to include Ga.'s first turbine interchange|last=McLoud|first=Don|website=www.equipmentworld.com|date=November 12, 2018 |access-date=August 12, 2019}}</ref><ref name=":0">{{Cite web|url=http://www.dot.ga.gov/BS/Projects/SpecialProjects/1695Improvement#tab-3|title=I-16 at I-95 Improvement Projects - MMIP Project|website=www.dot.ga.gov|access-date=August 12, 2019|archive-date=August 12, 2019|archive-url=https://web.archive.org/web/20190812170153/http://www.dot.ga.gov/BS/Projects/SpecialProjects/1695Improvement#tab-3|url-status=dead}}</ref> * The widening of I-16 from two lanes in each direction to three lanes between the junctions with [[Interstate 95 in Georgia|I-95]] and [[Interstate 516|I-516]] (exit 164). * The construction of a partial [[Interchange (road)#Turbine interchange|turbine interchange]] (whirlpool interchange) at the junction of I-16 and I-95, in which two existing loop ramps, from I-16 westbound to I-95 southbound, and from I-95 southbound to I-16 eastbound, will be replaced with turbine configuration ramps. * The creation of a [[Local–express lanes|collector–distributor road]] on I-95 northbound to separate through traffic from cars exiting onto and entering from I-16. * The construction of a two-lane emergency median cross-over for westbound I-16 traffic between Dean Forest Road/SR 307 (exit 160) and I-95, to assist in hurricane evacuations from Savannah. * Ramp meters will be installed at exit 160 as well as exit 162 (Chatham Parkway) * The reconstruction of six bridges, replacement of four bridges, and the construction of three new bridges near the area. * The addition of new interchange lighting at the I-95 interchange and [[Intelligent transportation system|Intelligent Transportation System]] technology to provide real-time driving conditions to travelers. The project, upon completion, is expected to result in a 32% decrease in I-16 congestion by 2030.<ref name=":0" /> Despite concerns from residents, no new noise barriers will be built along I-16 during the construction.<ref>{{Cite web|url=https://www.savannahnow.com/news/20190606/gdot-new-lanes-on-i-16-new-i-95-interchange-to-be-completed-by-2022|title=GDOT: New lanes on I-16, new I-95 interchange to be completed by 2022|last=Peebles|first=Will|website=Savannah Morning News|language=en|access-date=August 12, 2019}}</ref> A noise study concluded that barriers would not be necessary since traffic noise were not predicted to be over 66 [[dB(A)]].<ref>{{Cite web |url=https://www.in.gov/indot/files/Noise%20Barriers%20Brochure.pdf |title=Archived copy |access-date=August 12, 2019 |archive-date=January 9, 2019 |archive-url=https://web.archive.org/web/20190109080339/https://www.in.gov/indot/files/Noise%20Barriers%20Brochure.pdf |url-status=dead }}</ref> The project is expected to cost around $295 million.<ref>{{Cite web|url=https://www.wsav.com/news/traffic/exclusive-new-artist-rendition-of-i-16-i-95-interchange-project/|title=EXCLUSIVE: New artist rendition of I-16, I-95 interchange project|last=Antonacci|first=Kelly|date=October 24, 2018|website=WSAV-TV|language=en-US|access-date=August 12, 2019}}</ref> Construction, which will be completed by Savannah Mobility Contractors JV, was set to begin in the second half of 2019 and be completed by the end of 2022.<ref>{{Cite web|url=https://www.wtoc.com/2019/06/07/i-i-project-use-new-interchange-configuration/|title=I-16/I-95 project to use new interchange configuration|last=Logan|first=Zach|date=June 7, 2019 |publisher=WTOC|language=en-US|access-date=August 12, 2019}}</ref> However, construction did not start until 2020, has been delayed multiple times, and is now expected to cost $317.4 million.<ref>{{cite news |last1=Winkelmann |first1=Sarah |title=I-16 at I-95 construction delays causing project to take longer, but end is in sight |url=https://www.wtoc.com/2022/12/05/i-16-i-95-construction-delays-causing-project-take-longer-end-is-sight/ |access-date=May 15, 2023 |work=www.wtoc.com |date=December 5, 2022 |language=en}}</ref> The ramp from I-16 west to I-95 south was opened on March 23, 2023,<ref>{{cite news |title=First new I-16/I-95 ramp set to open Thursday |url=https://www.statesboroherald.com/local/first-new-i-16i-95-ramp-set-open-thursday/ |access-date=May 15, 2023 |work=www.statesboroherald.com |date=March 20, 2023}}</ref><ref>{{cite news |last1=Schrader |first1=Shea |title=New I-16/I-95 interchange ramp now open |url=https://www.wtoc.com/2023/03/24/new-i-16i-95-interchange-ramp-now-open/ |access-date=May 15, 2023 |work=www.wtoc.com |date=March 24, 2023 |language=en}}</ref> with the ramp from I-95 south to I-16 east opened on June 2, 2023.<ref>{{cite web |title=See the Latest Happenings at 16@95 Improvement Projects! |url=https://us20.campaign-archive.com/?u=85e8270674fc9a47b18bf99be&id=cd4809e72f |website=us20.campaign-archive.com |access-date=January 29, 2024}}</ref> Construction is ongoing as of January 29, 2024, with long-term detour routes in place.<ref>{{cite news |title=Expect delays on I-16, I-95 as construction continues |url=https://www.wtoc.com/video/2024/01/24/expect-delays-i-16-i-95-construction-continues/ |access-date=January 29, 2024 |date=January 24, 2024 |language=en}}</ref><ref>{{cite news |title=Interstate Closure Advisory for the 16@95 Improvement Projects |url=https://www.griceconnect.com/local-news/interstate-closure-advisory-for-the-1695-improvement-projects-8169028 |access-date=January 29, 2024 |work=Grice Connect |date=January 28, 2024 |language=en}}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)