Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Manhattan Project
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==== British Columbia ==== [[Cominco]] had produced electrolytic hydrogen at [[Trail, British Columbia]], since 1930. Urey suggested in 1941 that it could produce heavy water. To the existing $10 million plant consisting of 3,215 cells consuming 75 MW of hydroelectric power, secondary electrolysis cells were added to increase the deuterium concentration in the water from 2.3% to 99.8%. For this process, [[Hugh Stott Taylor|Hugh Taylor]] of Princeton developed a platinum-on-carbon [[catalyst]] for the first three stages while Urey developed a nickel-[[chromium(III) oxide|chromia]] one for the fourth stage tower. The final cost was $2.8 million. The Canadian Government did not officially learn of the project until August 1942. Trail's heavy water production started in January 1944 and continued until 1956. Heavy water from Trail was used for [[Chicago Pile 3]], the first reactor using heavy water and natural uranium, which went critical on 15 May 1944.<ref name="Waltham, pp. 8-9">{{harvnb|Waltham|2002|pp=8β9}}.</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)