Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
AMR 33
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==Production== On 8 March 1933 the Cavalry had already made a preliminary order of 45 for whatever type would be chosen. This was confirmed on 22 June together with a second order of twenty vehicles, deliveries were to start no later than 1 July. In the autumn a third order was made of fifty. The first vehicle was only delivered on 1 June 1934 however,<ref>{{harvnb|Touzin|1976|p=66}}</ref> due to financial difficulties; the last of the 115 in September. The production of the Citroën half-track was limited to fifty. It was decided to rebuild the original prototypes into standard vehicles; however in fact two were used to develop the [[AMR 35]], an improved model that was necessary because the too-fragile suspension of the AMR 33 was prone to break down (or even simply to break off) and engine noise was excessive. Prototype 79758 was used to test several other improved configurations. To compensate three more AMR 33's were built in the spring of 1935 for a total of 123, including all prototypes. The chassis that was used for the development of the ''Engin P'', a project for a 37 mm gun equipped [[tank destroyer]], is not included in this number.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)