Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Interstate 19
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Signage=== {{more citations needed|section|date=May 2020}} {{multiple image | align = right | direction = vertical | width = 250 | header = I-19 Signage | image1 = Metric Interstate 19.jpg | alt1 = Metric-unit advance guide sign on I-19, installed as part of the Valencia Road interchange renovation | caption1 = Metric-unit advance guide sign on I-19, installed as part of the Valencia Road interchange renovation | image2 = Metric Signs In Use On Interstate 19.svg | alt2 = Advance Guidance Sign alerting Drivers of I-19's Metric Signage located near Exit 99 (Southbound) for West Ajo Way [[Arizona State Route 86|SR 86]] | caption2 = Advance Guidance Sign alerting Drivers of I-19's Metric Signage located near Exit 99 (Southbound) for West Ajo Way [[Arizona State Route 86|SR 86]] }} I-19 is unique among US Interstates because signed distances are given in meters (hundreds or thousands as distance-to-exit indications) or kilometers (as distance-to-destination indications), and not miles. However, the speed limit signs give speeds in miles per hour. According to the [[Arizona Department of Transportation]] (ADOT), metric signs were originally placed because of the [[Metrication in the United States|push toward the metric system]] in the US at the time of the original construction of the highway.<ref>{{cite news |first = Denise |last = Holley |date = May 14, 2009 |title = ADOT Defends Replacing Metric Signs along I-19 |url = http://www.nogalesinternational.com/news/adot-defends-replacing-metric-signs-along-i/article_47be9930-829e-579c-8c88-a706dee9cd40.html |work = Nogales International |access-date = April 23, 2014 }}</ref> I-19 had originally been signed as it was constructed, in a series of small signing contracts that used customary units.<ref>One example of such a contract was Arizona federal-aid project I-19-1(65), covering I-19 between its Nogales terminus and the Otero TI (title sheet signed August 7, 1970).</ref> In 1980, ADOT awarded a single contract to install new signs which used metric units, to overlay customary-unit expressions on some existing signs with metric-unit expressions, to install kilometer posts, and to provide bilingual signing in select locations. The signing scheme used in 1980 provided explicit units on advance guide signs, but not on interchange sequence signs or post-interchange confirmation (distance) signs. The expressions on advance guide signs were of the form "2 km" ({{Convert|2|km|mi|disp=output only}}) for distances over {{convert|1|km|mi|sp=us|spell=in}} and "500 m" ({{Convert|500|m|mi|disp=output only}}) for distances under {{convert|1|km|mi|sp=us|spell=in}}, with no provision for fractional kilometrages. On advance guide signs, the metric unit expressions "km" and "m" were placed on the baseline where "MILES" would otherwise have gone but were sized so that their lowercase loop height matched the uppercase letter height of "MILES" on customary-unit signs. The exception was a handful of advance guide signs for the SR 86 (Ajo Way) exit, which used "KM" (in uppercase, contrary to [[International System of Units|SI]] nomenclature) on the same baseline and at the same letter height as "MILES". The 1980 signing plans also provided design details for speed limit and advisory speed signs using metric units, with the limit values enclosed in a red circle on the speed limit sign and a black circle on the yellow-background advisory signs. These speed signs all had explicit units, with "km/h" below the circle enclosing the limit value. However, the advisory signs were canceled by change order and not installed. Had the metric speed limit sign been installed, the signed speed limit on I-19 would have been 88 km/h, which is a close soft-conversion of the then-existing {{convert|55|mph|km/h|sigfig=4|abbr=on}} [[National Maximum Speed Law|national maximum speed limit]]. As Arizona's current maximum speed limit is 75 mph, the metric equivalent would most likely read {{convert|120|km/h|mph|sigfig=4|abbr=on}}. Information signs, to three distinct designs, were also placed at various locations on or near I-19 to advise motorists that the highway was signed in metric. Notwithstanding the metric legends, the signing plans were dimensioned entirely in feet and inches.<ref>Construction plans for Arizona federal-aid project I-19-1(81) (title sheet signed January 17, 1980).</ref> In 1999, ADOT awarded two contracts (administered as a single construction project) to renew the signs along the full length of I-19. The general approach toward metric signing differed from that taken in 1980. Explicit units were given not just on advance guide signs, but also on interchange sequence signs, post-interchange confirmation signs, and community interchange signs (the last-listed had not been used in 1980). On the distance signs, "km" appeared after each kilometer measurement except when one or more of the distances was a fractional kilometer. In such cases, all the distances were given in meters with "meters" (written out in full, not "m") after each distance value. On distance signs in general, "km" or "meters" appeared on the same baseline and with the same letter height as the distance values, while advance guide signs were formatted as in 1980. Since a typical ADOT freeway guide sign rehabilitation contract also replaces surface road signing near those roads' interchanges with the freeway, metric-unit signs also appeared on local roads near I-19, giving distances in kilometers to tourist attractions such as [[Mission San Xavier del Bac]]. As was the case in 1980, the signing plans were dimensioned in feet and inches.<ref>Construction plans for Arizona federal-aid projects NH-19-1(110) (ADOT TRACS H260701C) and NH-19-1(116) (TRACS H260702C) (most sheets sealed March 1997).</ref> However, a number of signs near the Valencia Road interchange were replaced or amended when it was converted from a [[partial cloverleaf interchange]] to a [[single-point urban interchange]] in 2000. One of these signs has a fractional kilometrage greater than {{convert|1|km|mi|sp=us|spell=in}}, rendered as "1500 m" ({{Convert|1500|m|mi|disp=output only}}), while others use "m" rather than "meters" as the unit expression. Metric-unit expressions on the advance guide signs installed or modified as part of this contract appear on the same baseline as the metric values, rather than on a raised baseline as on other I-19 advance guide signs. Again, the plans were dimensioned in feet and inches.<ref>Construction plans for Arizona federal-aid project ACNH-19-1(127) (TRACS H260901C) (most sheets sealed June 1999).</ref> Citing motorist confusion arising from the metric signs on I-19, ADOT's Tucson district announced that new signs on I-19 would use [[US customary units]]. To avoid the cost of replacing the metric signs all at once, signs would be replaced in specific areas of the freeway during construction projects in those areas.<ref>{{cite news |first = Susanna |last = Cañizo |date = January 19, 2004 |url = http://www.azstarnet.com/dailystar/printDS/6429.php |title = Some I-19 Metric Signs Going |work = [[Arizona Daily Star]] |location = Tucson |archive-url = https://web.archive.org/web/20050223220749/http://www.azstarnet.com/dailystar/printDS/6429.php |archive-date = February 23, 2005 |access-date = June 13, 2012 }}</ref> New signs were put into place between exit 99 (Ajo Way) and exit 101 (I-10) in 2004 after the completion of the new I-10/I-19 interchange. {{As of|2010}}, the remainder of the project has been stalled due to local opposition, particularly from businesses that would have to change their directions.<ref name="local opposition NYT story">{{cite news |last = Lacey |first = Mark |title = Metric Interstate Divides Arizonans |url = https://www.nytimes.com/2010/09/15/us/15highway.html?hpw |newspaper = [[The New York Times]] |date = September 14, 2010 |access-date = September 14, 2010 }}</ref> A reconstruction project at the Interstate's northern terminus with I-10 in Tucson (at the interchange commonly called the Crossing) began in 2002 and was completed in August 2004.<ref>{{cite web |author = Staff |url = http://www.1019crossing.com/ |title = Home Page |work = The Crossing: I-10/I-19 Interchange |publisher = Arizona Department of Transportation |archive-url = https://web.archive.org/web/20050207012249/http://1019crossing.com/ |archive-date = February 7, 2005 |access-date = November 27, 2011 }}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)