Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Interstate 664
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==History== {{Unsourced section|date=June 2023}} I-664 was completed in sections, beginning in 1971 with the construction of the "Tunnel Road" section, which led from Aberdeen Road to [[Interstate 64|I-64]]. The road was built to lead northbound traffic from I-64 and the [[Hampton Roads Bridge–Tunnel|HRBT]] to downtown Newport News. The interchange at I-64 was rebuilt as a partial stack interchange in 1980. I-664 was completed in sections by 1989, between Aberdeen Road and the 26th/27th street exit ramps in downtown Newport News. I-664 was completed in Suffolk and Chesapeake in 1990 between US 17 and Pughsville Road. With the opening of the [[Monitor–Merrimac Memorial Bridge–Tunnel|MMMBT]] on April 30, 1992, I-664 was almost complete. I-664 between Pughsville Road and the [[Bower's Hill, Virginia|Bower's Hill]] interchange was completed in 1993, thus completing I-664 as a whole.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)