Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Jeolla Line
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Upgrade===<!-- [[Korea Train Express#Further upgrades of connecting conventional lines]] links here--> The upgrade of the Iksan-Suncheon section started with the construction of a bypass around Jeonju with wider curves, opened in 1981. From 1989, the first phase of the project to re-lay and double-track the line, mostly in a new alignment with wider curves, longer tunnels and bridges, was launched on three sections between Sin-ri, at the end of the Jeonju realignment, and Suncheon. The two longest new structures were the {{Convert|5,671|m|ft|abbr=on|0}} long<ref name="Railnews2004">{{cite web|url=http://railnews.korail.go.kr/20040801/00532.html |script-title=ko:μ λΌμ 볡μ ν 16λ κ°μ λμ₯μ , νκ΅μ² λ μ§λλ₯Ό λ°κΎΈλ€! |language=ko |date=2004-08-01 |work=Railnews |publisher=[[Korail]] |access-date=2010-11-04 }}{{dead link|date=April 2017 |bot=InternetArchiveBot |fix-attempted=yes }}</ref> Byeongpung Tunnel, north of [[Suncheon station|Suncheon]], and the {{Convert|6,128|m|ft|abbr=on|0}} long Seulchi Tunnel, south of [[Jeonju Station|Jeonju]], which became South Korea's longest rail tunnel,<ref name="Railnews2004"/> surpassing Jeongam Tunnel on the [[Taebaek Line]].<ref>{{cite web |url=http://www.investkorea.org/InvestKoreaWar/work/ik/eng/bo/bo_01.jsp?no=610190001&bno=711290029&sort_num=130&code=102050104010101010101010101010101&mode=bbs&url_info=./bbs_read.jsp&l_unit=90202&m_unit=&s_unit=&page=11&sel=title&val= |title=From the coal transportation hub to the four-season leisure and sports gateway - Gohan Station (Jeongseon-gun, Gangwon-do). |date=2007-11-21 |publisher=InvestKorea |access-date=2010-11-04 |url-status=dead |archive-url=https://web.archive.org/web/20111008010531/http://www.investkorea.org/InvestKoreaWar/work/ik/eng/bo/bo_01.jsp?no=610190001&bno=711290029&sort_num=130&code=102050104010101010101010101010101&mode=bbs&url_info=.%2Fbbs_read.jsp&l_unit=90202&m_unit=&s_unit=&page=11&sel=title&val= |archive-date=2011-10-08 }}</ref> The three sections of the first phase with altogether {{convert|64.3|km|abbr=on}}, shortening the original route by {{convert|16.7|km|abbr=on}}, were finished by 1999 and entered service on 18 May 1999.<ref name="Railnews2004"/> The two gaps between those sections were plugged in a second phase in 2002 and August 2004, the altogether {{convert|58.3|km|abbr=on}} long new sections shortened the line by another {{convert|11.4|km|abbr=on}}.<ref name="Railnews2004"/> The third phase of the upgrading project, started in 2002, involved the double-tracking of the remaining {{convert|35.2|km|abbr=on}} long single-track section from Iksan to Sin-ri, until the end of the Jeonju realignment, and electrification of the entire double-tracked and re-aligned section from Iksan to Suncheon, altogether {{convert|154.2|km|abbr=on}},<ref name="KRNA_2010-1">{{cite web |url=http://www.krnetwork.or.kr/service/condition/RouteMapView.do?PA_MAP_ID=12381 |title=μ λΌμ 볡μ μ μ² ν |publisher=Korea Rail Network Authority |access-date=2010-10-24}}</ref> to allow speeds of {{convert|180|km/h|abbr=on}}.<ref name="irj-future">{{cite magazine|url=http://www.railjournal.com/altfeature1.shtml |title=Korea's railways face a bright future |date=2008-07-01 |magazine=[[International Railway Journal]] |archive-url=https://web.archive.org/web/20090416195911/http://www.railjournal.com/altfeature1.shtml |archive-date=2009-04-16 |access-date=2010-08-29 |url-status=dead }}</ref> By March 2010, progress on the {{convert|154.2|km|abbr=on}} section from Iksan to Suncheon reached 63.0%.<ref name="KRNA_2010-1"/> This phase of the project is implemented as a public private partnership of the Build-Transfer-Lease (BTL) method, with a government contribution of 510.852 billion won and a BTL share of 470.699 billion won.<ref name="KRNA_2010-1"/> The upgrade and re-alignment of the final Suncheon-Yeosu section was launched as a separate project in 2001,<ref>{{cite web |url=http://mayor.yeosu.go.kr/home/mayor/promise/work/show/27?page=1&search=&keyword=&cate_sel= |archive-url=https://archive.today/20140105095050/http://mayor.yeosu.go.kr/home/mayor/promise/work/show/27?page=1&search=&keyword=&cate_sel= |url-status=dead |archive-date=2014-01-05 |script-title=ko:μ§μ νμ μ¬μ |language=ko |publisher=Mayor of Yeosu's office |access-date=2010-11-12 }}</ref> with work starting in December 2003.<ref name="rgi-korailplans">{{cite magazine |url=http://www.railwaygazette.com/news/single-view/view/10/south-koreas-growing-network.html |title=South Korea's growing network |date=2008-09-08 |magazine=[[Railway Gazette International]] |access-date=2010-08-29 |archive-date=2012-12-05 |archive-url=https://archive.today/20121205072403/http://www.railwaygazette.com/news/single-view/view/10/south-koreas-growing-network.html |url-status=dead }}</ref> As of March 2010, progress on the {{convert|40.0|km|abbr=on}} long alignment stood at 88.0% out of a total budget of 732.002 billion won.<ref name="KRNA_2010-2">{{cite web |url=http://www.krnetwork.or.kr/service/condition/RouteMapView.do?PA_MAP_ID=12379 |title=μμ²~μ¬μ 볡μ μ μ² |publisher=Korea Rail Network Authority |access-date=2010-10-24}}</ref> The entire upgrading project is to be completed in 2011.<ref name="KRNA_2010-1"/><ref name="KRNA_2010-2"/> On September 1, 2010, the South Korean government announced a strategic plan to reduce travel times from Seoul to 95% of the country to under 2 hours by 2020. As part of the plan, the Jeolla Line is to be further upgraded for {{convert|230|km/h|abbr=on}}.<ref name="plans2020">{{cite web |url=http://joongangdaily.joins.com/article/view.asp?aid=2925474 |title=Bullet trains coming to a town near you by 2020 |date=2010-09-02 |publisher=[[JoongAng Daily]] |access-date=2010-10-27}}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)