Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Load testing
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==Physical load testing== [[File:Load test.svg|thumb|upright=0.5|Symbol used in geotechnical drawings]] Many types of machinery, engines,<ref>{{Citation | last1=Harper | first1=David | last2=Devin Martin, Harold Miller, Robert Grimley and Frédéric Greiner | title=Design of the 6C Heavy-Duty Gas Turbine | place=Atlanta GA | publisher=ASME 1. | series=ASME Turbo Expo 2003, collocated with the 2003 International Joint Power Generation Conference | volume=2: Turbo Expo 2003 | year=2003 | pages=833–841 | url=http://proceedings.asmedigitalcollection.asme.org/proceeding.aspx?articleid=1577115 | access-date=2013-07-14 | isbn=978-0-7918-3685-9 }}</ref> structures,<ref>{{Citation | last1=Raines | first1=Richard | last2=Garnier | first2=Jacques | place=Vancouver, BC | publisher=ASME | volume=1 | year=2004 | pages=621–631 | url=http://proceedings.asmedigitalcollection.asme.org/proceeding.aspx?articleid=1629220 | access-date=2013-07-14 | doi=10.1115/OMAE2004-51343 | title=23rd International Conference on Offshore Mechanics and Arctic Engineering, Volume 1, Parts a and B | isbn=978-0-7918-3743-6 | url-access=subscription }}</ref> and motors<ref>{{Citation | title=DETERMINING ELECTRIC MOTOR LOAD AND EFFICIENCY | volume=DOE/GO-10097-517 | url=https://www1.eere.energy.gov/manufacturing/tech_assistance/pdfs/10097517.pdf | publisher=US Department of Energy | date=2010 | access-date=2013-07-14 | isbn=978-0-9709500-6-2 }}</ref> are load tested. The load may be at a designated safe working load (SWL), full load, or at an aggravated level of load. The governing contract, [[technical specification]] or [[test method]] contains the details of conducting the test. The purpose of a mechanical load test is to verify that all the component parts of a structure including materials, base-fixings are fit for task and loading it is designed for. Several types of load testing are employed * Static testing is when a designated constant load is applied for a specified time. * Dynamic testing is when a variable or moving load is applied. * Cyclical testing consists of repeated loading and unloading for specified cycles, durations and conditions. The ''Supply of Machinery (Safety) Regulation 1992 UK'' state that load testing is undertaken before the equipment is put into service for the first time. [[Performance test (assessment)|Performance testing]] applies a safe working load (SWL), or other specified load, for a designated time in a governing test method, specification, or contract. Under the ''Lifting Operations and Lifting Equipment Regulations 1998 UK'' load testing after the initial test is required if a major component is replaced, if the item is moved from one location to another or as dictated by the competent person.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)