Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Loading gauge
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Out of gauge === Larger ''out-of-gauge'' loads can also sometimes be conveyed by taking one or more of the following measures: * Operate at low speed, especially in places with limited clearance, such as platforms. * Cross over from a track with inadequate clearance to another track with greater clearance, even if there is no signalling to allow this. * Prevent operation of other trains on adjacent tracks. * Use refuge loops to allow trains to operate on other tracks. * Use of [[Schnabel car]]s (special rolling stock) that manipulate the load up and down or left and right to clear obstacles. * Remove (and later replace) obstacles. * Use [[gauntlet track]] to shift the train to side or center. * For locomotives that are too heavy, ensure that fuel tanks are nearly empty. * Turn off power in overhead wiring or in the third rail (use diesel locomotive) * Permanently adapt a certain route to larger gauge if there is repeated need for such trains.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)