Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
National Development Plan
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Road network=== {{See also|Roads in Ireland|Motorways in the Republic of Ireland}} [[File:Scheme NDP signage.JPG|thumb|268px|right|Typical NDP road construction signage erected in 2007.]] [[Image:DublinPortTunnelConstruction 2004 SeanMcClean.jpg|thumb|268px|Traffic at the construction site of the [[Dublin Port Tunnel]] on the N1/[[M1 motorway (Republic of Ireland)|M1]].]] By the start of 2009 substantial progress had been made on the motorway network, with all sections of the five major inter-urban motorways either under construction or complete. The [[M1 motorway (Republic of Ireland)|M1 motorway]] from [[Dublin]] towards [[Belfast]] has been completed as far as the [[Republic of Ireland-United Kingdom border|border with Northern Ireland]]. The last section of N1/M1 route to be completed was the motorway/dual carriageway upgrade that crossed the border to become an upgraded A1 route as far as Newry. This was the first cross-border road project and was opened to traffic on 2 August 2007, thus completing the N1/M1 route. The [[N7 road (Ireland)|N7]]/[[M7 motorway (Republic of Ireland)|M7 motorway]] from Dublin to [[Limerick]] was completed in 2010. Major work was undertaken to extend the motorway westwards from [[Portlaoise]] to Limerick from 2006 onwards when work on the Nenagh to Limerick section commenced. Construction commenced on the Portlaoise to Castletown section in 2007 while work commenced on the Castletown to Nenagh section in 2008. All sections were completed at various times in 2010. Other upgrades during this period include the [[Naas]] road upgrade, which was finished in August 2006. This involved the widening of a section of the route to three lanes in each direction and the removal of several at-grade junctions. The [[N4 road (Ireland)|M4/N4]] from Dublin towards [[Sligo]] (and providing the link to the N6/M6 for [[Galway]]) now reaches as far as the Midlands. By September 2008, the M6 motorway was contiguous from Kinnegad to Athlone. The rest of the M6 route was completed in 2009 as far as Galway (where it will tie in with the proposed M17/M18 schemes). All sections of the M9 motorway to Waterford are also completed. The M9 Carlow bypass element opened in May 2008, while the Waterford-Knocktopher scheme opened in 2010. The [[M8 motorway (Ireland)|M8 Dublin-Cork road motorway]] moved substantially towards completion in 2008 with the opening of the 37 km Cashel-Mitchelstown scheme and the redesignation of the Cashel bypass to motorway standard. In December 2008, the 40 km M8 Cullahill-Cashel scheme was opened to traffic. All other sections of this route were under construction by late 2007. The 16 km Fermoy to Mitchelstown segment opened to traffic on 25 May 2009. The M8 was completed in 2010 following the opening of the M7/M8 Portlaoise to Castletown/Cullahill route where the M8 intersects with the M7.<ref>{{cite web |url=http://www.nra.ie/News/PressReleases/htmltext,16181,en.html |title=Press Releases β National Roads Authority |access-date=2009-05-25 |url-status=dead |archive-url=https://web.archive.org/web/20090529083848/http://nra.ie/News/PressReleases/htmltext,16181,en.html |archive-date=29 May 2009 }}</ref> The N11/M11 is also receiving upgrades along with the new controversial 47 km M3 motorway. In 2010, upgrade works the now-complete [[M50 motorway (Ireland)|M50 motorway]] Dublin inner ring road were finalised. The upgrade of parts of the M50 was appended to the NDP. One of the upgrades was the M50 [[Dublin Port Tunnel]] project which was a major scheme involving tunnelling from the M1 north of the city centre, through to the Docklands to the east of the city centre. The tunnel was officially opened by the [[Taoiseach]], [[Bertie Ahern]], on 20 December 2006. Other upgrades included the changing of the N4/M50 to a free-flow layout and an upgrade of the motorway to three or four lanes in each direction between many junctions. Works to upgrade the N7/M50 and M1/M50 junctions to free-flow or near free-flow layouts, and to upgrade the rest of the route to three or four-lane motorway were completed in late 2009 and during 2010. By early 2009, some progress had been made on the [[Atlantic Corridor]], which aims to link Letterkenny to Waterford, via upgrades of the N15, N17, N18, N20 and N25. The upgrade would have seen dual-carriageway/motorway links between Letterkenny and Sligo, Sligo and Galway, Galway and Limerick, Limerick and Cork and Cork and Waterford. In November 2008 work commenced on the 22 km section of the N18 HQDC from Crusheen to Gort. Various other sections of the route are planning stages. The M20 Cork-Limerick route is at public consultation stage and an EIS and motorway order are due to be published around April next year. The M17 from Galway to Tuam, along with the M18 from Gort (which ties in with the aforementioned M17) were completed in 2017. The N25 Waterford City bypass was completed on 19 October 2009, 10 months ahead of schedule. The N25 New Ross bypass was opened in January 2020.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)