Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Nuclear Reactor Operator Badge
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
==Qualification criteria== [[File:NPPOBasicbadge.jpg|thumb|NPPO Basic fatigue badge]] This material is transcribed, with a few small edits, from ''Standard Operating Procedure #1802'', US Army Engineer Reactors Group, Ft. Belvoir, VA, dated 1 July 1969. It is clear from these requirements that progression through the various licensing levels was not automatic; that is, there was much more required than simply working a given number of shifts. The first level of qualification was graduation from the Nuclear Power Plant Operator Course; the Basic badge is shown at right. ===Nuclear power plant operator, second class [Equipment Operator]=== [[File:SecondClassBadge.jpg|thumb|NPPO Second Class fatigue badge]] a. Certification as a Nuclear Power Plant Operator [graduation from the US Army Engineer Reactors Group Nuclear Power Plant Operator Course, 52 weeks]. b. Satisfactory completion of an approved training program. Minimum requirements are: :(1) Satisfactory completion of comprehensive practical training and examinations covering all aspects of the operations, maintenance, and plant safety for this level of qualification. An Operations Record will be completed for each trainee. :(2) Completion of at least thirty (30) shifts of operating experience under the supervision of a qualified Nuclear Power Plant Operator, Second Class, within six (6) months prior to recommendation for qualification. c. Recommendation of Shift Supervisor of the shift to which individual is assigned. d. Recommendation of Shift Supervisor of the shift to which individual is not assigned. e. Recommendation by an NPPO, Second Class Qualification Board to the Officer-In-Charge of the plant concerned. f. Recommendation of the OIC of the plant concerned. ===Nuclear power plant operator, first class [Control Room Operator]=== [[File:CRObadge.JPG|thumb]] a. Certification as an NPPO, Second Class. b. Satisfactory completion of an approved training program. Minimum requirements are: :(1) Satisfactory completion of comprehensive practical training and examinations covering all aspects of the operations, maintenance, and plant safety for this level of qualification. An Operations Record will be completed for each trainee. :(2) Satisfactory completion of the following operating experience within the six (6) months prior to recommendation for qualification: ::(a) For initial qualification, completion of at least thirty (30) shifts as a qualified NPPO, Second Class, and completion of at least thirty (30) shifts of operating experience under the supervision of a qualified NPPO, First Class. ::(b) For additional qualification, completion of at least fifteen (15) shifts as a qualified NPPO, Second Class, and completion of at least fifteen (15) shifts of operating experience under the supervision of a qualified NPPO, First Class. c. Recommendation of Shift Supervisor of the shift to which individual is assigned. d. Recommendation of Shift Supervisor of the shift to which individual is not assigned. e. Recommendation by an NPPO, First Class Qualification Board to the Officer-In-Charge of the plant concerned. f. Recommendation of the OIC of the plant concerned. ===Shift supervisor=== [[File:ShiftSuperBadge.jpg|thumb|Shift Supervisor badge]] a. Certification as an NPPO, First Class of the plant concerned b. Satisfactory completion of an approved training program. Minimum requirements are: :(1) Satisfactory completion of comprehensive practical training and examinations covering all aspects of the operations, maintenance, and plant safety for this level of qualification. :(2) Satisfactory completion of the following operating experience within the six (6) months prior to recommendation for qualification: ::(a) For initial qualification, completion of at least thirty (30) shifts as a qualified NPPO, First Class, and completion of at least forty (40) shifts as a Shift Supervisor Trainee. ::(b) For additional qualification, completion of at least fifteen (15) shifts as a qualified NPPO, First Class, and completion of at least fifteen (15) shifts as a Training Shift Supervisor. c. Recommendation of Shift Supervisor of the shift to which individual is assigned. d. Recommendation of Shift Supervisor of the shift to which individual is not assigned. e. Recommendation by an NPPO, Shift Supervisor Qualification Board to the Officer-In-Charge of the plant concerned. f. Recommendation of the OIC of the plant concerned.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)