Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Purchasing
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Purchasing topics == === Acquisition process === The revised [[Military acquisition|acquisition]] process for major systems in the [[United States Department of Defense|U.S. Department of Defense]] is shown in the next figure. The process is defined by a series of phases during which technology is defined and matured into viable concepts, which are subsequently developed and readied for production, after which the systems produced are supported in the field.<ref name="DAUP 01">[http://www.dau.mil/pubs/pdf/SEFGuide%2001-01.pdf ''Systems Engineering Fundamentals.''] {{webarchive|url=https://web.archive.org/web/20070927203501/http://www.dau.mil/pubs/pdf/SEFGuide%2001-01.pdf |date=2007-09-27 }} Defense Acquisition University Press, 2001</ref> [[Image:Acquisition Process.jpg|center|thumb|560px|Model of the Acquisition Process<ref name = "DAUP 01"/>]] The process allows for a given system to enter the process at any of the development phases. For example, a system using unproven technology would enter at the beginning stages of the process and would proceed through a lengthy period of technology maturation, while a system based on mature and proven technologies might enter directly into engineering development or, conceivably, even production. The process itself includes four phases of development:<ref name = "DAUP 01"/> * Concept and Technology Development: is intended to explore alternative concepts based on assessments of operational needs, technology readiness, risk, and affordability. * Concept and Technology Development phase begins with concept exploration. During this stage, concept studies are undertaken to define alternative concepts and to provide information about capability and risk that would permit an objective comparison of competing concepts. * System Development and Demonstration phase. This phase could be entered directly as a result of a technological opportunity and urgent user need, as well as having come through concept and technology development. * The last, and longest, phase is the Sustainment and Disposal phase of the program. During this phase all necessary activities are accomplished to maintain and sustain the system in the field in the most cost-effective manner possible. === Selection of bidders === This is the process where the organization identifies potential suppliers for specified supplies, services or equipment. These suppliers' [[credential]]s and history are analyzed, with the products or services they offer. The [[Bidding|bidder]] selection process varies from organization to organization, but can include running credit reports, interviewing management, testing products, and touring facilities. This process is not always done in order of importance, but rather in order of expense. Often purchasing managers research potential bidders obtaining information on the organizations and products from media sources and their own industry contacts. Additionally, purchasing might send [[Request for information|Request for Information]] (RFI) to potential suppliers to help gather information. Engineering would also inspect sample products to determine if the company or organisation can produce products they need. If the bidder passes both of these stages engineering may decide to do some testing on the materials to further verify quality standards. These tests can be expensive and involve significant time of multiple technicians and engineers. Engineering management must make this decision based on the cost of the products they are likely to procure, the importance of the bidders’ product to production, and other factors. Credit checks, interviewing management, touring plants as well as other steps could all be utilized if engineering, manufacturing, and supply chain managers decide they could help their decision and the cost is justifiable. Other organizations might have [[Minority group|minority]] procurement goals to consider in selection of bidders. Organizations identify goals in the use of woman-owned or [[Minority business enterprise|minority-owned businesses]]. Significant utilizing of minority suppliers may qualify the firm as a potential bidder for a contract with a company or governmental entity looking to increase their minority supplier programs. This selection process can include or exclude international suppliers depending on organizational goals and criteria. Companies looking to increase their pacific rim supplier base may exclude suppliers from the Americas, Europe, and Australia. Other organizations may be looking to purchase domestically to ensure a quicker response to orders as well as easier collaboration on design and production. Organizational goals will dictate the criteria for the selection process of bidders. It is also possible that the product or service being procured is so specialized that the number of bidders are limited and the criteria must be very wide to permit competition. If only one firm can meet the specifications for the product then the purchasing managers must consider utilizing a “Sole Source” option or work with engineering to broaden the specifications if the project will permit alteration in the specifications. The sole source option is the part of the selection of bidders that acknowledges there is sometimes only one reasonable supplier for some services or products. This can be because of the limited applications for the product cannot support more than one manufacturer, proximity of the service provided, or the products are newly designed or invented and competition is not yet available. === Bidding process === This is the process an organization utilizes to procure goods, services or equipment. Processes vary significantly from the stringent to the very informal. Large corporations and governmental entities are most likely to have stringent and formal processes. These processes can utilize specialized bid forms that require specific procedures and detail. The very stringent procedures require bids to be open by several staff from various departments to ensure fairness and impartiality. Responses are usually very detailed. Bidders not responding exactly as specified and following the published procedures can be disqualified. Smaller private businesses are more likely to have less formal procedures. Bids can be in the form of an email to all of the bidders specifying products or services. Responses by bidders can be detailed or just the proposed dollar amount. Most bid processes are multi-tiered. [[Acquisitions]] under a specified dollar amount can be “user discretion” permitting the request or to choose who ever they want. This level can be as low as $100 or as high as $10,000 depending on the organization. The rationale is the savings realized by processing these request the same as expensive items is minimal and does not justify the time and expense. Purchasing departments watch for abuses of the user discretion privilege. Acquisitions in a mid range can be processed with a slightly more formal process. This process may involve the user providing quotes from three separate suppliers. Purchasing may be asked or required to obtain the quotes. The formal bid process starts as low as $10,000 or as high as $100,000 depending on the organization. The bid usually involves a specific form the bidder fills out and must be returned by a specified deadline. Depending on the [[Product (business)|product]] being purchased and the organization the bid may specify a weighted evaluation criterion. Other bids would be evaluated at the discretion of purchasing or the end users. Some bids could be evaluated by a cross-functional committee. Other bids may be evaluated by the end user or the buyer in purchasing. Especially in small, private firms the bidders could be evaluated on criteria or factors that have little if anything to do with the actual bid. Examples of these factors are history of the bidder with the company, history of the bidder with the company's senior management at other firms, and bidder's breadth of products. === Technical evaluation === {{Expand section|date=January 2010}} Technical evaluations, evaluations of the technical suitability of the quoted goods or services, if required, are normally performed prior to the commercial evaluation. During this phase of the procurement process, a technical representative of the company (usually an engineer) will review the proposal and designate each bidder as either technically acceptable or technically unacceptable. Technical evaluation is usually carried out against a set of pre-determined technical evaluation criteria. There are two types of criteria, general criteria (whereby scores are given if they are met) and essential criteria (failing of which shall render the bid technically disqualified). === Commercial evaluation === [[Cost of Money]] is calculated by multiplying the applicable currency's [[interest rate]] by the amount of money paid prior to the receipt of the goods. If the money was to have remained in the buyer's account, interest would be drawn. That interest is essentially an additional cost associated with such progress or milestone payments. The manufacturing location is taken into consideration during the evaluation stage primarily to calculate for [[Cargo|freight]] costs and regional issues. For instance, it is common in Europe for factories to close during the month of August for a summer holiday. [[Collective bargaining|Labor agreements]] may also be taken into consideration and may be drawn into the evaluation if the particular region is known to have frequent labor disputes. The manufacturing [[lead-time]] is the time from the placement of the order (or time final drawings are submitted by the buyer to the seller) until the goods are manufactured and prepared for delivery. Lead-times vary by product and can range from several days to years. Transportation time is evaluated while comparing the delivery of goods to the buyer's required use-date. If goods are shipped from a remote port, with infrequent vessel transportation, the transportation time could exceed the schedule and adjustments would need to be made. Delivery Charges - the charge for the goods to be delivered to a stated point. * Bid validity * Packing * Bid adjustments * [[Contractual term|Terms and Conditions]] * Seller's services * [[Standards organization]]s * Financial review * Payment currency * [[Risk management|Risk analysis]] ([[Volatility (finance)|market volatility]], financial stress within the bidders) * Testing === Negotiating === [[Negotiating]] is a key skillset in the purchasing field. One of the goals of purchasing agents is to acquire goods per the most advantageous terms of the buying entity (or simply, the "buyer"). [[Purchasing Agent|Purchasing agents]] typically attempt to decrease costs while meeting the buyer's other requirements such as an on-time delivery, compliance to the commercial terms and conditions (including the [[warranty]], the transfer of risk, assignment, [[auditing]] rights, [[confidentiality]], remedies, etc.). Good negotiators, those with high levels of documented "cost savings", receive a premium within the industry relative to their [[Compensation and benefits|compensation]]. Depending on the employment agreement between the buyer and the employer, buyer's cost savings can result in the creation of value to the business, and may result in a flat-rate bonus, or a percentage payout to the purchasing agent of the documented cost savings. Purchasing departments, while they can be considered as a support function of the key business, are actually [[revenue]] generating departments. For example, if the company needs to buy US$30 million of widgets and the purchasing department secures the widgets for $25M USD, the purchasing department would have saved the company $5M USD. That savings could exceed the [[annual budget]] of the department, which in effect would pay the department's overhead - the employee's salaries, computers, office space, etc. === Post-award administration === Post-award administration typically consists of making minor changes, additions or subtractions, that in some way change the terms of the agreement or the seller's scope of supply. Such changes are often minor, but for auditing purposes must be documented into the existing agreement. Examples include increasing the quantity of a line Item or changing the metallurgy of a particular component. === Order closeout === Is the closing of order.{{clarify|date=February 2024}}<!-- DUH! -->
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)