Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Gospel Oak to Barking line
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Potential Abbey Wood extension=== Following the plan to extend the line to [[Barking Riverside railway station|Barking Riverside]], there were also proposals to extend the line further across the river to [[Abbey Wood railway station|Abbey Wood]] via [[Thamesmead]], to allow for easier Orbital journeys in East London, and provide [[Thamesmead]] with a railway connection for the first time.<ref>{{cite news |title = Call to bring London Overground to Thamesmead β south east London's largest town with no trains |url = http://www.thisislocallondon.co.uk/news/11488390.display/ |work = This is London Local |date = 22 September 2014}}</ref> This was outlined in the [[R25 (London)|R25]] orbital railway proposal in 2014,<ref>{{Cite news |last = Dudman |first = Jane |url = https://www.theguardian.com/public-leaders-network/2014/aug/01/boris-johnsons-london-orbital-railway-is-it-a-good-idea |title = Boris Johnson's London orbital railway β is it a good idea? |date = 1 August 2014 |work = The Guardian |access-date = 17 April 2020 |language = en-GB |issn = 0261-3077}}</ref> and the potential of a future extension was mentioned in the inspectors report of the [[Transport and Works Act 1992|Transport and Works Order]] authorising the extension to Barking Riverside.<ref name=":1" /> However, in 2019 [[Transport for London]] and [[Greater London Authority|City Hall]] proposed an [[Thamesmead Extension Scheme|extension of the Docklands Light Railway (DLR)]] to serve [[Thamesmead]] instead of an extension of the [[London Overground|Overground]], as part of the proposed Thamesmead and Abbey Wood [[London Plan|OAPF (Opportunity Area Planning Framework)]].<ref>{{Cite web |url = https://www.newsshopper.co.uk/news/18202007.workshops-future-thamesmead-abbey-wood-opened-public/ |title = Workshops about the future of Thamesmead and Abbey Wood opened to public |website = News Shopper |date = 31 January 2020 |language = en-gb |access-date = 17 April 2020}}</ref> A DLR extension was chosen due to lower connectivity benefits of an Overground extension, the low frequency (four trains per hour) of the Gospel Oak to Barking line, and β most significantly β a construction cost twice as much as the DLR, as the gradients required to cross the [[River Thames]] would require large scale tunnelling works when compared to the DLR.<ref>{{Cite web |url = https://www.london.gov.uk/sites/default/files/md2696_appendices_a-f.pdf |title = Thamesmead and Abbey Wood OAPF - OAPF Transport Strategy - December 2019 Draft |date = December 2019 |publisher = [[Greater London Authority]] |access-date = 17 April 2020}}</ref> Despite recommending an extension of the DLR to [[Thamesmead]], the consultation also noted that an extension of the Gospel Oak to Barking line could provide good orbital transport links in the long term.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)