Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Gyeongjeon Line
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
====Samnangjin-Masan-Jinju==== The upgraded section is 101.4 km long.<ref name="KNRA_2010-1">{{cite web |url=http://www.krnetwork.or.kr/service/condition/RouteMapView.do?PA_MAP_ID=12385 |title=삼랑진~진주 복선전철 |publisher=Korea Rail Network Authority |access-date=2010-10-24}}</ref> The 41 km section until Masan includes a re-alignment with tunnels<ref>{{cite web |url=http://www.samboeng.co.kr/result/result02_24_eng.html |title=Design/Construction Package for Double Track Construction of Gyeongjeon Line Samnyangjin - Jinju Lot 3 (Jinyeong - Changwon) |publisher=Sambo Engineering |access-date=2010-10-19 |url-status=dead |archive-url=https://web.archive.org/web/20110722135650/http://www.samboeng.co.kr/result/result02_24_eng.html |archive-date=2011-07-22 }}</ref> closer to Changwon,<ref>{{cite web |url=http://news.hankooki.com/lpage/society/201008/h2010081821070121950.htm |title=경전선 KTX 김해 정차해야 |language=Ko |date=2010-08-18 |newspaper=[[Hankook Ilbo]] |access-date=2010-11-10 |url-status=dead |archive-url=https://web.archive.org/web/20110613215911/http://news.hankooki.com/lpage/society/201008/h2010081821070121950.htm |archive-date=2011-06-13 }}</ref> the Masan–Jinju section also includes significant re-alignments along the way.<ref name="KNRA_2010-1"/><ref>{{cite web |url=http://www.cse.co.kr/eng/results/res_D.asp?idx=293 |title=Detailed design of Gyeongjeon Line for electrified double track between Masan and Haman (Section 5) |publisher=Chunsuk Engineering |access-date=2010-10-19 |url-status=dead |archive-url=https://web.archive.org/web/20110722134128/http://www.cse.co.kr/eng/results/res_D.asp?idx=293 |archive-date=2011-07-22 }}</ref> The project was implemented as a public-private partnership: the government contribution is 1,680.473 billion won, private capital contributes 338.309 billion won.<ref name="KNRA_2010-1"/> By April 2009, construction progress reached 50.9% of the planned budget of 2,018.782 billion won.<ref name="KNRA_2010-1"/> The Samnangjin-Masan section opened on December 15, 2010,<ref name="KTXTT-15Dec2010"/> the Masan–Jinju section followed on October 23, 2012. The design speed of this section is 200 km/h.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)