Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Interstate 805
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Construction=== According to Dekema, planning for I-805 began in 1956.<ref name="breaking">{{cite news | title=Ceremonies Open Work on Interstate 805 | work=The San Diego Union | date=September 26, 1967 | page=C1|oclc=13155544}}</ref> The original routing for I-805 was approved as an Interstate Highway in July 1958.<ref>{{cite book |url= http://www.dot.ca.gov/hq/tsip/hseb/products/state_highway_routes_selected_information_1995_revised.pdf |title= State Highway Routes: Selected Information |publisher= California Department of Transportation |year= 1995 |page= 350}}</ref> It was added to the state highway system and the Freeway and Expressway System in 1959 as Route 241.<ref name="yr1959">{{cite CAstat|year=1959|ch=1062}}</ref> I-805 was expected to reduce traffic on what was then US 101 between Los Angeles and San Diego, when the former was opened.<ref>{{cite news | title=U.S. 101 Ranked Among Deadliest | work=The San Diego Union | date=October 14, 1962 | page=A36|oclc=13155544}}</ref> Route 241 was renumbered to Route 805 in the [[1964 state highway renumbering (California)|1964 state highway renumbering]], and I-5 was designated along the route from Los Angeles to San Diego.<ref>{{cite CAstat|year=1963|ch=385|p=1177}}</ref> Further planning was underway in 1965, with the goal to have the route built by 1972, the federal highway funding deadline.<ref>{{cite news | title=150 Additional Freeway Miles Scheduled for San Diego Area | work=The San Diego Union | date=February 21, 1965 | author=Parry, Bill | page=A31|oclc=13155544}}</ref> This was to be the first freeway in the area with no prior road along its route that it would replace; the goal was to provide a bypass around San Diego for those traveling to Mexico, and improve access for local residents. By June, houses along the route in the [[North Park, San Diego|North Park]] area were being sold, as the land was needed for the first stretch of the freeway to be constructed.<ref>{{cite news | title=Route 805 Hailed as 'Totally New' | work=The San Diego Union | date=June 6, 1965 | author=Parry, Bill | page=A13|oclc=13155544}}</ref> The next year, Dekema confirmed that the first portion of what was known as the Inland Freeway to be built would be between Home and Adams avenues.<ref>{{cite news | title=Dekema Predicts Completion of Inland Freeway by 1972 | work=The San Diego Union | date=July 3, 1966 | author=James, Paul | page=B4|oclc=13155544}}</ref> In May 1967, [[Construction bidding|bidding]] began, after construction had been delayed by that of the I-5 and I-8 freeways, both of which had been given higher priority. This first portion would run from Wabash Boulevard to around Madison Avenue (a distance of {{convert|3.5|mi|km|disp=or|abbr=on}}), and the next portion would include the I-8 interchange.<ref>{{cite news | title=State Asks Bids for Freeway In E. San Diego | work=The San Diego Union | date=May 23, 1967 | author=Ross, Charles | page=B1|oclc=13155544}}</ref> The R.E. Hazard and W.F. Maxwell Companies won the low bid of $11.7 million (equivalent to ${{Formatprice|{{Inflation|US-GDP|11700000|1967|r=3}}}} in {{inflation-year|US-GDP}}{{Inflation-fn|US-GDP}}) in mid-1967.<ref>{{cite news | title=S.D. Firms' Bid OKd for Freeway Job | work=The San Diego Union | date=July 23, 1967 | page=C7|oclc=13155544}}</ref> The groundbreaking ceremony happened on September 25 at El Cajon Boulevard and Boundary Street.<ref name="breaking" /> In August 1968, the portion of I-805 from just south of I-8 to north of Friars Road, including the interchange with I-8, was put up for bidding; at a budgeted $27.5 million (equivalent to ${{Formatprice|{{Inflation|US-GDP|27500000|1968|r=3}}}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP}}), it was the most expensive job that the Division of Highways had ever put up for bid.<ref>{{cite news | title=$27.1 Million Freeway Job Set for Bids | work=The San Diego Union | date=August 27, 1968 | page=B1|oclc=13155544}}</ref> The winning bid was $20.9 million (equivalent to ${{Formatprice|{{Inflation|US-GDP|29400000|1970|r=3}}}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP}}), and was awarded to R.E. Hazard Contracting Company and W.F. Maxwell Company.<ref>{{cite news | title=2 Area Firms Win Interchange Job | work=The San Diego Union | date=November 8, 1968 | page=B3|oclc=13155544}}</ref> [[File:Aerial - Interstate 805 in San Diego, CA 01.jpg|thumb|left|Aerial view of I-805 near the SR 15 interchange]] Construction had begun on the viaduct by May 1969;<ref>{{cite news | title=New Mission Valley Span Beauty Cited | work=The San Diego Union | date=May 27, 1969 | author=Stone, Joe | page=B3|oclc=13155544}}</ref> in the meantime, National City was making plans for developing the freeway corridor with motels and restaurants, as well as a shopping center.<ref>{{cite news | title=National City Flexes Muscles for Growth | work=The San Diego Union | date=June 14, 1969 | page=B7|oclc=13155544}}</ref> In mid-1969, bidding was to begin on {{convert|3.2|mi|km}} of I-805 from north of Friars Road to north of what was then [[U.S. Route 395 in California|US 395]],<ref>{{cite news | title=Bids Called for Section of Interstate 805 | work=The San Diego Union | date=July 5, 1969 | page=C8|oclc=13155544}}</ref> which would become SR 163.<ref>{{cite CAstat|year=1969|ch=294}}</ref> Construction from J Street south to near San Ysidro was underway by September, when there were concerns that an order from President [[Richard Nixon]] to reduce federal construction projects by 75 percent might affect funding for the portion north of Friars Road. However, Governor [[Ronald Reagan]] lifted the associated freeze in construction at the state level a few weeks later.<ref>{{cite news | title=San Diego Freeway Work Hit by Action | work=The San Diego Union | date=September 5, 1969 | page=A8|oclc=13155544}}</ref><ref>{{cite news | title=Construction OKd on Interstate 805 | work=The San Diego Union | date=September 17, 1969 | author=Clance, Homer | page=A1|oclc=13155544}}</ref> A month later, the contract for the portion between Friars Road and US 395 had been awarded for $15 million (equivalent to ${{Formatprice|{{Inflation|US-GDP|15000000|1969|r=3}}}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP}}); the portions between there and north of Miramar Road were in the planning phases, while construction continued south of I-8 to Wabash Boulevard.<ref>{{cite news | title=$15 Million Pact Let for Freeways | work=The San Diego Union | date=October 9, 1969 | author=Scott-Blair, Michael | page=B1|oclc=13155544}}</ref> The {{convert|2.4|mi|km|adj=on}} portion from SR 52 to Miramar Road had been contracted out to O.G. Sansome Company for $5.6 million (equivalent to ${{Formatprice|{{Inflation|US-GDP|5600000|1969|r=3}}}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP}}) by the end of 1969.<ref>{{cite news | title=Riverside Firm Wins Contract for Road Work | work=The San Diego Union | date=December 21, 1969 | page=B1|oclc=13155544}}</ref> Meanwhile, $4 million (equivalent to ${{Formatprice|{{Inflation|US-GDP|4000000|1969|r=3}}}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP}}) of state funding was spent in 1969 to find housing for those who were to be displaced by the freeway in San Ysidro.<ref>{{cite news | title=San Ysidro's Replacement Homes Studied | work=The San Diego Union | date=November 8, 1969 | page=B2|oclc=13155544}}</ref> By March 1970, the original section between Home Avenue and near I-8 was almost finished. The Mission Valley portion extending north of US 395, as well as from Otay Valley Road and J Street in Chula Vista, were still under construction.<ref>{{cite news | title=Highway Office Reports on Area Freeway Progress | work=The San Diego Union | date=March 15, 1970 | page=B4|oclc=13155544}}</ref> The portion immediately north of US 395 was contracted to A.A. Baxter Corporation, E.C. Young, and Young and Sons, Inc. for $7.9 million<ref>{{cite news | title=Highway Pact Awarded | work=The San Diego Union | date=March 19, 1970 | page=B1|oclc=13155544}}</ref> (equivalent to ${{Formatprice|{{Inflation|US-GDP|7900000|1970|r=3}}}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP}}). On July 6, the first section to begin construction was dedicated, and was to be opened from El Cajon Boulevard to Wabash Boulevard soon thereafter; the rest of the section would not open until the Mission Valley interchange with I-8 was finished.<ref>{{cite news | title=Interstate 805 Link Dedicated | work=The San Diego Union | date=July 7, 1970 | page=B1|oclc=13155544}}</ref> A second border crossing in the San Ysidro area was proposed near the [[Playas de Tijuana]] area, that would be accessible from I-805, although another alternative was considered near [[Brown Field Municipal Airport|Brown Field]].<ref>{{cite news | title=Border Entry Urged Near [[Brown Field Municipal Airport|Brown Field]] | work=The San Diego Union | date=May 15, 1970 | page=B1|oclc=13155544}}</ref> A formal study on the matter was commissioned in August.<ref>{{cite news | title=City Council Airs New 805 Route | work=The San Diego Union | date=August 26, 1970 | page=B1|oclc=13155544}}</ref> However, this would have added $10 million (equivalent to ${{Formatprice|{{Inflation|US-GDP|10000000|1970|r=3}}}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP}}) to the cost of the freeway, and possibly delay it by up to 10 years; furthermore, most traffic crossing the border was found to head to [[Tijuana]] and not [[Ensenada, Baja California|Ensenada]].<ref>{{cite news | title=$10 Million Loss Seen in 805 Rerouting | work=The San Diego Union | date=September 1, 1970 | page=B1|oclc=13155544}}</ref> Following this, the city of Chula Vista asked that the state proceed with the original plans to construct the freeway, even though it would pass through a San Ysidro neighborhood.<ref>{{cite news | title=Chula Vista Urges Early Road Work | work=The San Diego Union | date=September 10, 1970 | page=B1|oclc=13155544}}</ref> In September 1970, bidding began for the final portion of the northern half of I-805 between Miramar Road and I-5;<ref>{{cite news | title=Bids Sought for 805 Link | work=The San Diego Union | date=September 24, 1970 | page=B2|oclc=13155544}}</ref> a month later, the segments between Home Avenue and SR 94, and SR 54 to 12th Street had funding allocated.<ref>{{cite news | title=State Highway Commission Adopts $905 Million Budget | work=The San Diego Union | date=October 23, 1970 | page=B9|oclc=13155544}}</ref> By the end of the year, Hazard, Maxwell, and Matich had submitted the low bid of around $7.2 million (equivalent to ${{Formatprice|{{Inflation|US-GDP|7200000|1970|r=3}}}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP}}) for the northernmost portion.<ref>{{cite news | title=Bids Taken by State on 2 Highways | work=The San Diego Union | date=December 17, 1970 | page=B1|oclc=13155544}}</ref> The Chula Vista portion of the freeway from Main Street to L Street was completed in February 1971; by then, the estimated date for completing the entire freeway had slipped to 1975 from 1972.<ref>{{cite news | title=Dedication Set for Part of Interstate 805 | work=The San Diego Union | date=February 25, 1971 | page=B3|oclc=13155544}}</ref> By March, the projected completion date for the Mission Valley bridge was revised to July 1972.<ref>{{cite news | title=Gap Closed on Mission Valley Bridge | work=The San Diego Union | date=March 16, 1971 | page=B3|oclc=13155544}}</ref> A 102-home [[mobile home park]] was approved by the City Council a few weeks later to house those who were displaced by the freeway construction.<ref>{{cite news | title=Mobile Home Park Readied in San Ysidro | work=The San Diego Union | date=April 9, 1971 | page=B1|oclc=13155544}}</ref> The portion of the freeway from Otay Valley Road to Telegraph Canyon Road opened during 1972.<ref name="band">{{cite news | title=Completion Date Fixed in August | work=The San Diego Union | date=March 19, 1975 | page=B3|oclc=13155544}}</ref> On October 22, several unconstructed portions of I-805 were partially funded, including from Chula Vista south past [[California State Route 75|SR 75]], north of the completed Chula Vista portion to SR 54, from SR 54 to Plaza Boulevard in National City, from there to SR 94 (including the interchange with [[SR 252 (CA)|SR 252]]), and from there to Home Avenue.<ref>{{cite news | title=$60 Million Due County for Roads | work=The San Diego Union | date=October 23, 1971 | pages=B1, B2|oclc=13155544}}</ref> Before the end of the year, the portion from SR 94 to Home Avenue entered the bidding phase;<ref>{{cite news | title=State Asks Bids on Section of Interstate 805 | work=The San Diego Union | date=December 15, 1971 | page=D4|oclc=13155544}}</ref> Guy F. Atkinson Company won the contract for roughly $9.96 million (equivalent to ${{Formatprice|{{Inflation|US-GDP|9960000|1972|r=3}}}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP}}) in early 1972.<ref>{{cite news | title=Long Beach Firm Awarded Contract | work=The San Diego Union | date=February 26, 1972 | page=B2|oclc=13155544}}</ref> Following a request from the El Cajon City Council,<ref>{{cite news | title=El Cajon Council to Ask Cycling on Interstate 805 | work=The San Diego Union | date=February 2, 1972 | page=B1|oclc=13155544}}</ref> March 19 was set aside as a Community Cycle Day for bicyclists to travel the newly finished freeway from El Cajon Boulevard to SR 52, just before the freeway was to be dedicated the next day;<ref>{{cite news | title=Route 805 Bicycle Day Set March 19 | work=The San Diego Union | date=March 8, 1972 | page=B1|oclc=13155544}}</ref> during the event, around 30 people had injured themselves, and police estimated that some bicyclists had attained speeds of up to {{convert|60|mph|km/h|abbr=on}} traveling down the hill leading to the Mission Valley Viaduct.<ref>{{cite news |last = Alice |first = Matthew |date = September 19, 2002 |title = Tell Me About the Day We Could bicycle Down the 805 freeway |work = San Diego Reader |url= https://www.sandiegoreader.com/news/2002/sep/19/tell-me-about-day-we-could-bicycle-down-805-freewa/ |access-date = November 18, 2021 }}</ref> The entire Mission Valley Viaduct was open to traffic that month.<ref name="band" /> [[File:I-805 San Diego Skyline.jpg|thumb|I-805 northbound in Chula Vista, with the San Diego skyline in the background]] By the beginning of 1974, I-805 was open north of Home Avenue, and from Otay Valley Road to Telegraph Canyon Road in Chula Vista;<ref name="band" /> five segments remaining were under construction, and the last segment was funded.<ref>{{cite news | title=Public's Mood Shifts away from Freeways | work=The San Diego Union | date=January 8, 1974 | page=X16|oclc=13155544}}</ref> The Imperial Avenue section of I-805 remained in the budget, despite revisions in response to the [[1973 oil crisis]].<ref>{{cite news | title=County Road Share Set at $30 Million | work=The San Diego Union | date=January 12, 1974 | page=B3|oclc=13155544}}</ref> In late January, I-805 between SR 15 and SR 94 was opened to traffic, though not all of the ramps at the SR 94 interchange were operational.<ref>{{cite news | title=New Highway Link to Open | work=The San Diego Union | date=January 28, 1974 | page=B1|oclc=13155544}}</ref> The connectors to SR 94 east were completed in March.<ref>{{cite news | title=805 Open to State 94 | work=The San Diego Union | date=March 7, 1974 | page=B1|oclc=13155544}}</ref> The entire portion between SR 94 and Home Avenue cost $10.5 million<ref name="band" /> (equivalent to ${{Formatprice|{{Inflation|US-GDP|10500000|1974|r=3}}}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP}}). Construction between SR 94 and Imperial Avenue was well under way by December, at a cost of $8.5 million<ref>{{cite news | title=Interstate 805 Continues Southward Advance | work=The San Diego Union | date=December 13, 1974 | page=B1|oclc=13155544}}</ref> (equivalent to ${{Formatprice|{{Inflation|US-GDP|8500000|1974|r=3}}}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP}}). As the scheduled completion of the freeway neared, Mayor Tom Hamilton of Chula Vista expressed concerns regarding the predicted development of the I-805 corridor, and the decisions that the City Council would need to make regarding such plans.<ref>{{cite news | title=Mayor Foresees Scramble for Sites as I-805 Develops | work=The San Diego Union | date=January 12, 1975 | author=Scaglione, Cecil | page=B3|oclc=13155544}}</ref> The portion south of Otay Valley Road cost $15 million (equivalent to ${{Formatprice|{{Inflation|US-GDP|15000000|1975|r=3}}}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP}}), and the portion between Telegraph Canyon Road and Sweetwater Road cost $12 million (equivalent to ${{Formatprice|{{Inflation|US-GDP|12000000|1975|r=3}}}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP}}). The portion from there to Imperial Avenue was projected to cost $10.2 million<ref name="band" /> (equivalent to ${{Formatprice|{{Inflation|US-GDP|10200000|1975|r=3}}}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP}}). The dedication of the freeway took place on July 23, 1975, even though the freeway was not entirely finished, due to the desire to hold the ceremony during the summer.<ref>{{cite news | title=Interstate 805 Dedicated but Opening Date Delayed | work=The San Diego Union | date=July 24, 1975 | page=B3|oclc=13155544}}</ref> I-805 from Plaza Boulevard to Telegraph Canyon Road opened to traffic on July 28, leaving the freeway complete except for the portion between Plaza Boulevard and SR 94. While portions of the freeway were nearly ready for traffic, there were reports of motorists driving on the closed freeway, which the [[California Highway Patrol]] warned was illegal.<ref>{{cite news | title=Unopened 805 Usage Prohibited | work=The San Diego Union | date=July 29, 1975 | page=B3|oclc=13155544}}</ref> On September 3, Dekema announced that the entirety of the freeway would open the next day as he made a final inspection of the unopened portion; the total cost of the construction was $145 million (equivalent to ${{Formatprice|{{Inflation|US-GDP|145000000|1975|r=3}}}} in {{inflation-year|US-GDP}}{{inflation-fn|US-GDP}}). However, Dekema announced that there was no more state funding available to construct further roads for the short-term.<ref>{{cite news | title=Officials Say Interstate 805 Is End of Road for Funds | work=The San Diego Union | date=September 4, 1975 | page=B3|oclc=13155544}}</ref>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)