Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Marmaray
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Second phase === The second phase of the project involved the renewal of the old suburban railway that ran between [[Halkalı railway station|Halkalı]] and [[Kazlıçeşme railway station|Kazlıçeşme]] on the European side of Istanbul and between [[Ayrılık Çeşmesi railway station|Ayrılıkçeşmesi]] and [[Gebze railway station|Gebze]] on the Asian side. The work was meant to be completed at the same time as the first phase (the tunnel and underground sections), but was delayed until March, 2019. A third line was added to enable the [[electric multiple unit]] (EMU) cars and other railway carriages to move separately.<ref name="ReferenceA" /> Thirty-six above-ground stations along the line were rebuilt or completely refurbished.<ref name="ff">[http://www.marmaray.com/html/technical.html Facts and figures]; {{Webarchive|url=https://web.archive.org/web/20071020115125/http://www.marmaray.com/html/technical.html |date=October 20, 2007 }}, web page at the Marmaray web site. Accessed on-line September 24, 2007.</ref><ref name="tt">[http://www.marmaray.com/html/gen_travel.html Travel time and alignment]; {{Webarchive|url=https://web.archive.org/web/20050302164438/http://marmaray.com/html/gen_travel.html |date=March 2, 2005 }}, web page at the Marmaray web site. Accessed on line, September 24, 2007.</ref> Signalling was also modernised to allow trains to travel as close as two minutes apart (although in reality far fewer trains than that actually run). The suburban-rail upgrade part of the project, known originally as CR1, was first awarded to the AMD Rail Consortium, comprising Marubeni of Japan, Dogus Insaat of Turkey and Alstom of France.<ref name="cr3">{{cite news |date=November 3, 2011 |title=Marmaray railway upgrading contract awarded |work=[[Railway Gazette International]] |url=http://www.railwaygazette.com/news/infrastructure/single-view/view/marmaray-upgrading-contract-awarded.html}}</ref> However, they were unable to complete the work and it was re-tendered as contract CR3 in early 2011. The replacement contract worth €932.8 million was awarded to a joint venture between OHL and Invensys Rail.<ref name="cr3" /> [[File:Marmaray train in Bostancı station.jpg|thumb|A Marmaray train at [[Bostancı railway station|Bostancı]] station on the first day of operation of the Gebze–Halkalı line]]
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)