Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Route assignment
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Heuristic procedures=== To take account of the effect of traffic loading on travel times and traffic equilibria, several [[heuristic]] calculation procedures were developed. One heuristic proceeds incrementally. The traffic to be assigned is divided into parts (usually 4). Assign the first part of the traffic. Compute new travel times and assign the next part of the traffic. The last step is repeated until all the traffic is assigned. The CATS used a variation on this; it assigned row by row in the O-D table. The heuristic included in the [[Federal Highway Administration|FHWA]] collection of computer programs proceeds another way. *0. Start by loading all traffic using an all or nothing procedure. *1. Compute the resulting travel times and reassign traffic. *2. Now, begin to reassign using weights. Compute the weighted travel times in the previous two loadings and use those for the next assignment. The latest iteration gets a weight of 0.25 and the previous gets a weight of 0.75. *3. Continue. These procedures seem to work "pretty well," but they are not exact.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)