Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Northern Counties Committee
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
====The Blitz==== The [[Luftwaffe]] attacked Belfast three times in 1941. The first air raid was on the night of 7/8 April. Although some doors and windows were blown out, little damage was done to NCC installations. An attack in greater force on the night of 15/16 April was [[Belfast Blitz|a much more serious affair]]. York Road station was hit, the facade suffering considerable damage. The general stores department and various offices were burned out. The last air raid was on 4 May and concentrated on the docks and shipyard. The NCC suffered severe damage because of its closeness to the docks and York Road station was made unusable. Almost all the remaining station offices, its overall roof and the Midland Hotel were gutted by fire. Both the inwards and outwards goods sheds were destroyed and the works section extensively damaged with several workshops completely burned out and a consequent loss of stores and equipment. Bombs also cut the running lines in two places between York Road and Whitehouse. Unfortunately, manning problems meant that it had not been possible to evacuate rolling stock to other locations as planned and several trains were caught in the air raid. Twenty coaches were destroyed along with more than 250 wagons representing heavy losses of 10% and 15% of total stock respectively. Despite the surrounding destruction, however, the locomotive sheds and the signal cabin remained undamaged. Temporary passenger termini were set up at Whitehouse and Whiteabbey with shuttle bus services to the city operated by the NIRTB. Goods services were transferred to the [[Great Northern Railway (Ireland)|GNR(I)]] Grosvenor Road goods yard. Meanwhile, the Civil Engineer's staff and military personnel worked to clear debris and demolish dangerous structures at York Road. The station reopened to passengers on 8 May and shortly afterwards it was possible to accept goods traffic. The loss of rolling stock imposed severe constraints on the NCC's ability to maintain its services. The LMS provided twenty ex-Midland Railway coaches that were no longer included in its capital stock and these were regauged in Belfast. Meanwhile, arrangements were made for the [[Great Southern Railways]] (GSR) and GNR(I) to build and repair 250 wagons.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)