Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Transport in Botswana
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Under construction === ==== North-South Carrier ==== {{Further|North-South Carrier}} NSC is a pipeline in Botswana that carries raw water, south for a distance of {{convert|360|km}} to the capital city of [[Gaborone]]. It was done in phases. However, phase 1 was completed in 2000. Phase 2 of the NSC, still under construction, will duplicate the pipeline to carry water from the [[Dikgatlhong Dam]], which was completed in 2012. A proposed extension to deliver water from the [[Zambezi]] would add another {{convert|500|to|520|km}} to the total pipeline length. ==== Lesotho-Botswana Water Transport ==== The Lesotho-Botswana Water Transfer is an ongoing project which is expected to provide two hundred million cubic meters per year to transfer water to the south-eastern parts of Botswana. The scheme involves the supply of water to [[Gaborone]] from [[Lesotho]] via a {{convert|600|to|700|km}} pipeline. The project commenced on the 1 August 2018 and is set for completion in June 2020.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)