Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Multan
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Railways=== [[File:Cantt_Railway_Station_Multan.jpg|thumb|[[Multan Cantonment railway station|Cantonment railway station]] serves as the city's main railway station.]] Multan is connected by rail with all parts of the country and lies on the main track between Karachi, [[Peshawar]], Lahore and [[Quetta]]. The [[Karachi–Peshawar Railway Line|Main Line-1 Railway]] that links Karachi and Peshawar passes through Multan district is being overhauled as part of the [[China Pakistan Economic Corridor]]. As part of the project, railways will be upgraded to permit train travel at speeds of up to 160 kilometres per hour, versus the average 60 to 105 km per hour speed currently possible on existing track,<ref>{{cite news|title=Karachi-Peshawar railway line being upgraded under CPEC|url=http://www.dailytimes.com.pk/national/22-Jan-2016/karachi-peshawar-railway-line-being-upgraded-under-cpec|access-date=10 February 2016|work=Daily Times|date=22 January 2016}}</ref> The project is divided into three phases, with the Peshawar to Multan portion to be completed as part of the project's first phase by 2018,<ref name="hindustantimes.com">{{cite news|title=Pakistan to get Chinese funds for upgrading rail links, building pipeline|url=http://www.hindustantimes.com/world/pakistan-to-get-chinese-funds-for-upgrading-rail-links-building-pipeline/story-pI5fBFrrL6tEuJRe0m3v2O.html|access-date=9 August 2016|agency=Hindustan Times|date=10 June 2016|quote=The project is planned to be completed in two phases in five years by 2021. The first phase will be completed by December 2017 and the second by 2021.}}</ref> and the entire project is expected to be complete by 2021.<ref name="hindustantimes.com"/>{{Update inline|date=November 2023}} From Multan, links to [[Khanewal]], [[Lodhran]] and [[Muzaffargarh|Muzafargarh]] are offered by rail.<ref>[http://www.lonelyplanet.com/pakistan/punjab/multan/transport/getting-there-away Transport in Multan] {{Webarchive|url=https://web.archive.org/web/20100715073847/http://www.lonelyplanet.com/pakistan/punjab/multan/transport/getting-there-away |date=15 July 2010 }} Lonely Planet Travel Information. Accessed 15 August 2009.</ref> [[Multan Cantonment railway station]] is the main railway station of Multan.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)