Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
High Speed 1
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Building cost == The cost of construction was Β£6.84 billion. At Β£51 million per mile, this was higher than other projects in many other countries.<ref name=aecomatkins/> The French [[LGV Est]], a line built largely through near-flat fields (save for the [[Saverne Tunnel]]) and which terminates outside its urban centres ([[Vaires-sur-Marne]] for [[Paris]] and [[Vendenheim]] for [[Strasbourg]]) cost Β£22 million per mile.<ref name=aecomatkins>{{Citation | author = Aecom and Atkins | title = First Interim Evaluation of the Impacts of High Speed 1 | url = https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/466084/first_interim_evaluation_hs1_main-report.pdf | access-date = 8 May 2019 | archive-date = 8 May 2019 | archive-url = https://web.archive.org/web/20190508155119/https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/466084/first_interim_evaluation_hs1_main-report.pdf | url-status = live }}</ref> Its phase one was completed in 2007 and phase two in 2016.<ref name=aecomatkins/>
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)