Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Incheon Subway
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Seoul Metro Line 7 === {{main|Seoul Subway Line 7}}Line 7 on the Seoul Subway was extended beyond [[Onsu Station]] with 9 additional stations beyond Seoul City and into Incheon on October 27, 2012. The {{convert|10.2|km|mi|adj=on|sp=us}} extension had ended at [[Bupyeong-gu Office Station]], meeting [[Incheon Subway Line 1]]. On May 22, 2021, Line 7 was extended deeper into Incheon with the opening of the {{convert|3.94|km|mi|adj=on|sp=us}} extension to [[Seongnam station (Incheon)|Seongnam]]. The section of the line in Incheon and Bucheon Cities are operated by [[Incheon Transit Corporation]] with their own fleet of Incheon Transit Corporation SR000 series trains, and both fleets [[through service]] into each other's portion of the line. Future plans call for the relevant portion of the line to extended all the way to [[Cheongna International City station]], with transfers available to [[AREX]].
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)