Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Kyle Field
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
====2013β2015 renovation==== [[File:TAMU Kyle Field 2022-01-14 5.jpg|thumb|right| 12th Man Statue and Kyle Field added with renovations]] [[File:Aggie War Hymn.jpg|thumb|right|The [[Aggie War Hymn|War Hymn Movement]] statue erected in 2014]] On May 1, 2013, the Texas A&M Board of Regents approved a $485 million rebuild of Kyle Field. The renovation would temporarily raise the official seating capacity to 106,511 people for the 2014 season, making it the largest football stadium in Texas and the [[Southeastern Conference|SEC]] (surpassing [[Neyland Stadium]] by 57 seats) and the third largest football stadium in the country.<ref>{{cite news |title=Ohio Stadium to expand to 104,829 |url=https://www.espn.com/college-football/story/_/id/9329236/ohio-state-buckeyes-expand-ohio-stadium-2500-seats-2014 |date=May 31, 2013 |work=ESPN |access-date=May 13, 2014}}</ref> The renovation was done in two distinct phases geared around the football season, and began immediately after the conclusion of the final 2013 season game in November with the implosion of the student section side. The stadium renovation was complete by the beginning of the 2015 season bringing the official capacity to 102,733. Per local media, [[KBTX-TV|KBTX]], major milestones for the Kyle Field project were as follows, with construction sequenced and phased to allow the playing of regular home football games in the stadium for the 2013, 2014, and 2015 seasons. The renovation was completed ahead of schedule and under budget. * Phase I (November 2013): Demolition of the first deck of the east side of the stadium, reconstruction of the first deck, and construction of the south end zone, which includes seating, media interview areas, 12th Man Productions and related gameday support, and a commissary and recruiting area. * Phase II (November 2014): Demolition of the entire west side of the stadium (including the last remnant of the original 1927 stadium), complete construction of the south end zone, and reconstruction of the west side. Other significant items included in the scope of work for the Kyle Field redevelopment included: * Demolition of the Read Building, [[G. Rollie White Coliseum]], and the Netum Steed strength and conditioning facility, all of which are adjacent to or part of Kyle Field * Construction of a new strength and conditioning laboratory training area on the university's west campus * Lowering of the playing field by approximately 7 feet and relocation of the playing surface approximately 18 feet to the south allowing for an additional six rows of seating around the stadium * Relocation of the existing south end zone scoreboard and video board reusing appropriate components to provide a scoreboard facility on the exterior of the north end zone structure: New interior scoreboard locations will be established in the south end zone and the northeast and northwest corners of the developed stadium. * Construction of widened, tree-lined walkways along both sides of Houston Street from George Bush Drive to the stadium east mall area * The new "South Side Upper Level" (with addition of an upper seating deck and concourse), has an estimated seating capacity of 12,000 with the future potential of an additional 7,000 seats, with seating to be located both below and above the new upper concourse.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)