Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Material requirements planning
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Data=== The data that must be considered include: * The ''end item'' (or items) being created. This is sometimes called independent demand, or Level "0" on BOM ([[bill of materials]]). * How much is required at a time. * When the quantities are required to meet demand. * [[Shelf life]] of stored materials. * Inventory status records. Records of ''net'' materials ''available'' for use already in stock (on hand) and materials on order from suppliers. * Bills of materials. Details of the materials, components and sub-assemblies required to make each product. * Planning data. This includes all the restraints and directions to produce such items as: [[routing]], labor and machine standards, quality and testing standards, pull/work cell and push commands, lot sizing techniques (i.e. fixed lot size, lot-for-lot, [[economic order quantity]]), scrap percentages, and other inputs.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)