Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Traffic calming
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
===Implementation strategies=== There are primarily two implementation options for the creation of traffic calming measure: capital reconstruction versus operational changes.{{Citation needed|date=June 2021}} * Capital reconstruction is rebuilding a street, which may involve moving infrastructure (such as sewers, water lines, electrical equipment) and adjusting the location, size and path of the roadway. Typically, capital reconstruction involves years of planning and design, and millions of dollars of investment. * Operational changes to a road have to do with more short-term changes that typically implement minor adjustments within the existing curbline or that do not require rebuilding the road. These treatments range from a very temporary use of safety cones or other safety-approved traffic management devices, such as flexible bollards, that test a traffic-calming initiative for a few days to longer-term operational changes that may include restriping a street, which is best to plan around any routine maintenance resurfacing.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)