Open main menu
Home
Random
Recent changes
Special pages
Community portal
Preferences
About Wikipedia
Disclaimers
Incubator escapee wiki
Search
User menu
Talk
Dark mode
Contributions
Create account
Log in
Editing
Xinbeitou branch line
(section)
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Noise complaints === Since the line's opening, residents along the line have complained about [[Rail squeal|noise from the trains]] due to the sharp curvature of the tracks and its close distance to apartment buildings on the sides. [[Rail grinding]] and the installation of [[noise barrier]]s did not alleviate the noise by much.<ref>{{cite news |author1=孫惠琪 |title=新北投支線消音 捷局施工改善 解決沿線噪音問題 進行第三階段軌道研磨作業 |agency=[[Central Daily News]] |date=19 November 1997 |location=Taipei |language=zh-tw}}</ref> Shortly after opening, the train's frequency was reduced, the operating hours were shortened to 7 am and 9 pm, and the number of cars on each train was reduced from six to three.<ref name="trts">{{cite web |title=Starting September 14, the Xinbeitou Branch Line Will Resume Normal Operational Mode with 3-Carriage Train |url=http://www.trtc.com.tw/e/shownews1.asp?id=1430 |website=Taipei Metro |access-date=6 September 2021 |archive-url=https://web.archive.org/web/20081009164816/http://www.trtc.com.tw:80/e/shownews1.asp?id=1430 |archive-date=9 October 2008 |date=12 September 2007}}</ref> On 14 September 2007, Taipei Metro extended its operating hours to between 6 am and midnight.<ref name="trts"/> It was hoped that if the noise standards were deemed to be at an acceptable level that the current [[Zhonghe–Xinlu line|Orange line]] trains on the [[Tamsui–Xinyi line|Red line]] could operate on the Xinbeitou Line instead.<ref name="liberty-b">[http://www.libertytimes.com.tw/2007/new/jul/14/today-taipei2.htm 新北投支線 八月增班正常營運] {{Webarchive|url=https://web.archive.org/web/20110517132727/http://www.libertytimes.com.tw/2007/new/jul/14/today-taipei2.htm |date=17 May 2011 }}, [[The Liberty Times]], 14 July 2007</ref> Trains operate at a maximum headway of one per 7–8 minutes during peak hours.<ref>{{cite web|url=http://english.trtc.com.tw/ct.asp?xItem=1056506&ctNode=27495&mp=122032|title=Xinbeitou Branch Line|publisher=Taipei Rapid Transit Corporation|date=23 December 2009|access-date=16 December 2010|archive-date=2 March 2012|archive-url=https://web.archive.org/web/20120302235437/http://english.trtc.com.tw/ct.asp?xItem=1056506&ctNode=27495&mp=122032|url-status=dead}}</ref> It has been reported that the line is operating at a loss.<ref name="loss">[https://web.archive.org/web/20100309205416/http://www.xianqiao.net:8080/gb/7/7/13/n1772112.htm 捷运新北投支线 不惜赔钱服务市民], 中广新闻, 13 July 2007</ref> A proposal was put forth in 2005 that a low-speed [[maglev train]] similar to the [[Linimo]] in Japan would solve the problem of noise pollution,<ref name="maglev">[http://www.chinanews.com.cn/news/2005/2005-07-21/26/601993.shtml 台北拟引进日本磁浮电车 最快2007年可亮相], [[China News Service]], 21 July 2005</ref> but its feasibility on operating costs became a subject of ridicule. In July 2019, the soundproofing walls on the line were updated as part of newly-introduced through-operations to central Taipei.
Edit summary
(Briefly describe your changes)
By publishing changes, you agree to the
Terms of Use
, and you irrevocably agree to release your contribution under the
CC BY-SA 4.0 License
and the
GFDL
. You agree that a hyperlink or URL is sufficient attribution under the Creative Commons license.
Cancel
Editing help
(opens in new window)